L-2003-185, Emergency Plan Implementing Procedures
| ML032130475 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/18/2003 |
| From: | Jefferson W Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2003-185 EPIP-12, Rev 11A, EPIP-13, Rev 7A | |
| Download: ML032130475 (58) | |
Text
0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 July 18, 2003 L-2003-185 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Emergency Plan Implementing Procedures In accordance with 10 CFR 50 Appendix E, enclosed is a copy of each of the following procedures that implements the St. Lucie Plant Radiological Emergency Plan.
Number Title Revision Implementation Date EPIP-12 Maintaining Emergency Preparedness -
Radiological Emergency Plan Training EPIP-13 Maintaining Emergency Preparedness -
Emergency Exercises, Drills, Tests and Evaluations 11A 7A July 14,2003 July 14, 2003 EPIP-12 Revision 11A and EPIP-13 Revision 7A incorporated procedure change requests (PCR) to delete references to protection services manager. Please contact us if there are any questions regarding these procedures.
William effers ok, Jr.
Vice President St. Lucie Plant WJ/spt Enclosures an FPL Group company
I.
Procedure No.
ST. LUCIE PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-12 Current Revision No.
11A Effective Date 07/14/03 FPL SAFETY RELATED
Title:
MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY P I
NW_
Responsible Department: EMERGENCY PLANNING I7 Cr [, A REVISION
SUMMARY
Revision 1A - Incorporated PCR 03-1897 to delete references to (Bonnie Wooldridge, 06/06/03)
I k A
rotecz PROCEDURE PRODUCTION Revision 11 - Added definitions, clarified drill participation requirements, eliminated notification of certain departments, removed PAR training requirements, added OSC manager tmg, and made other minor changes. (J. R. Walker, 07/18/02)
REVISION 10 - Adjusted positions for which drill participation may be desirable prior to being placed in ERO. Added requirement for drill participation. Revised STA, NDDO, and ECO training requirements. (R. Walker, 09/27/01)
Revision 9 - Revised Chemistry training relative to PASS elimination.
(J. R. Walker, 07/23/01)
Revision 8 - THIS PROCEDURE HAS BEEN COMPLETELY REWRITTEN. Removed training requirement for FAPDT (First-Aid Personnel Decontamination Tram) training for Chemistry personnel, added statement regarding Security First Aid Training, and made editorial and administrative changes. (J. R. Walker, 12/07/00)
AND Added reference to NP-912, revised GET procedure number, updated trng. mgr. title, revised annual retraining to allow credit for drill/exercise participation, identified use of PSUPTN common training modules, deleted RM training module from qual req for ECO and NDDO and made administrative changes. (J. R. Walker, 10/13/00)
Revision 0
FRG Review Date 12/15/97 Approved By J. Scarola Approval Date 12/15197 Plant General Manager Revision 11A FRG Review Date 07/18/02 Approved By Dick Rose Approval Date 07/18/02 S
OPS DATE DOCT PROCEDURE DOCN EPIP-12 SYS COM COMPLETED ITM 11A Plant General Manager N/A Designated Approver D. Calabrese Designated Approver (Minor Correction) 06/06/03
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
2 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE............................................
3
2.0 REFERENCES
/ RECORDS REQUIRED / COMMITMENT DOCUMENTS............................................
4 3.0 RESPONSIBILITIES............................................
5 4.0 DEFINITIONS............................................
7 5.0 INSTRUCTIONS............................................
9 5.1 Initial Training............................................
9 5.2 Annual Retraining...........................................
11 5.3 Loss of ERO Qualifications...........................................
14 5.4 Training for Security Personnel...........................................
15 5.5 Fire Brigade...........................................
16 5.6 Training Exemptions and Substitutions...........................................
17 ATTACHMENTS ATTACHMENT 1 EMERGENCY RESPONSE ORGANIZATION CHANGE REQUEST...........................................
18 ATTACHMENT 2 ERO INITIAL TRAINING MATRIX.19 ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX........................ 28
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
3 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 1.0 PURPOSE 1.1 This procedure provides the Emergency Plan (E-Plan) training requirements for site personnel and personnel in the St. Lucie Plant Emergency Response Organization (ERO).
1.2 In order to maintain emergency preparedness, personnel should be familiar with certain pre-planned actions specified in the Emergency Plan Implementing Procedures (EPIPs). The primary objectives of this training are as follows:
- 1.
Familiarize appropriate individuals with the E-Plan and related EPIPs.
- 2.
Instruct individuals in their specific duties to ensure effective and expeditious action during an emergency.
- 3.
Periodically present significant changes in the scope or content of the E-Plan and the EPIPs.
- 4.
Provide annual retraining to ensure that personnel are familiar with their emergency duties and responsibilities.
- 5.
Provide the various emergency organization groups with the required training that will ensure an integrated and prompt response to an emergency situation.
1.3 The annual training cycle normally occurs in the first quarter of each year.
1.4 The E-Plan Training Review Committee provides for the review and evaluation of changes, the impact on training, and the determination if training is needed prior to the next cycle.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
4 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT
2.0 REFERENCES
/ RECORDS REQUIRED / COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
2.1 References
§,
St. Lucie Plant Radiological Emergency Plan (E-Plan)
¶'
QI 1-PR/PSL-1, Site Organization.
¶2 QI-17-PSL-1, Quality Assurance Records.
4 ADM-18.06, General Employee Training.
AP 1800022, Fire Protection Plan.
ADM-1 1.11, Severe Accident Management Guidelines Program Administration St. Lucie Plant Emergency Response Directory.
NP-912, Respiratory Qualifications Requirements 2.2 Records Required
¶2 Records documenting the Emergency Plan Training received by individuals are Quality Assurance records and shall be maintained in the plant files in accordance with QI-17-PSL-1, Quality Assurance Records.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
5 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
2.3 Commitment Documents 10 CFR 50.47, Emergency Plans.
10 CFR 50, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities.
NUREG 0737,11.B.4, Training for Mitigating Core Damage
§2 NOV Response L-97-20, Violation II.C, Part 4A.
§3 NOV Response L-97-20, Violation II.C, Part 4B.
§4 NRC Inspection Report 96-18 URI P5.2
¶3 QAS-EMP-96-01, Finding 2
¶fs PMAI PM99-05-183 (Use and Update of the Personnel Qualification Database (PQD))
¶16 PMAI PM99-09-077, CR 99-1353 (Training requirements for TSC Dose Assessor) 7 CR 00-0544, Audit QSL-EP-00-02 (Discrepancies with Primary and Backup ERO Augmentation Processes) 3.0 RESPONSIBILITIES 3.1 The Site Training Manager is responsible for:
I.
Designing, establishing, implementing and maintaining training programs for the St. Lucie Plant.
- 2.
Ensuring initial orientation training is provided to permanently assigned new employees.
- 3.
Ensuring all Emergency Plan Training, both initial training and periodic retraining, is conducted and documented for the St. Lucie Plant ERO.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS-6 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
3.2 Plant Services Manager is responsible for:
- 1.
¶1 Ensuring that a qualified Emergency Response Organization (ERO) is maintained in compliance with the St. Lucie Radiological Emergency Plan.
- 2.
Coordinating emergency planning at the plant.
3.3 Emergency Preparedness is responsible for:
- 1.
Establishing qualifications standards for ERO personnel.
A.
¶7 Ensuring non-bargaining unit personnel pagers are correctly programmed.
- 2.
Reviewing and approving the Emergency Plan Training Program.
- 3.
§ Offering training to each contracted local hospital, at least once each year.
A.
The content of that training should consist of radiological controls, medical consideration of contaminated injuries, and other topics as appropriate.
- 4.
§,
Offering training to each State and local emergency response agency, at least once each calendar year.
A.
The content of that training should consist of an overview of normal and emergency plant operations and concepts of radiation protection, including protective actions.
B.
This training may be in the form of a presentation, text, or other acceptable means.
- 5.
Providing the table of Emergency Action Levels (EALs) to state and local officials for their review, on an annual basis.
- 6.
Revising the St. Lucie Plant Emergency Response Directory (ERD) and the FPL Emergency Recall System (autodialer) database when notified via a form similar to Attachment 1.
- 7.
Providing a list of personnel designated to fill emergency response positions and requiring training per this procedure, to the Training Department.
- 8.
Removing individuals who fail to maintain training qualifications from the ERD and the FPL Emergency Recall System (autodialer) database when notified by the appropriate department head or the Training Department.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
7 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
3.3 Emergency Preparedness is responsible for: (continued)
- 9.
Providing guidelines to plant management to assist in identifying the appropriate number of ERO personnel for each ERO position.
- 10.
Notifying the Site Training Manager if changes in the E-Plan and/or EPIPs justify additional training for ERO personnel.
- 11.
Chairing EP Training Review Committee Meetings.
3.4 Each Manager and Department Head is responsible to ensure that each ERO member under his/her supervision attends training in accordance with Attachments 2 and 3, and remains fully qualified at all times to perform his/her assigned emergency response duties.
- 1.
Ensure personnel in his/her department who are assigned an on-site position in the ERO maintain unescorted access to the Protected Area and Radiation Controlled Area.
- 2.
Ensure changes in his/her employees' status which would impair or limit the ability to perform emergency response duties be promptly reported to the Manager (directly or through EP).
A.
Provide alternate personnel to be trained to fill open positions.
- 3.
¶7 Ensure that non-bargaining unit personnel have pagers.
3.5 The Manager is responsible to ensure that Security personnel maintain EP training qualifications per this procedure.
3.6 ERO members, supervisors, training instructors, HP dosimetry personnel and medical facility staff are responsible for promptly reporting any failure in training, testing or other condition, which would disqualify an emergency responder, to the Manager (directly or through EP).
3.7 Each ERO member is responsible for advising the Manager (directly or through EP) when changes in status occur that could impact ERO participation.
4.0 DEFINITIONS 4.1 Annual - occurring once per calendar year (January 1 through December 31).
4.2 Duty Call Supervisor (DCS) - is a specifically designated and trained supervisor responsible for assisting the Emergency Coordinator in making notifications and calls to the Emergency Response Organization.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
1 A MAINTAINING EMERGENCY PREPAREDNESS -
8 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 4.3 Emergency Plan - formally known as the St. Lucie Plant Radiological Emergency Plan, establishes the requirements for training the Emergency Response Organization; also referred to as the Plan or E-Plan.
4.4 Emergency Planning (EP) - activities undertaken to satisfy the commitments of the Emergency Plan, used interchangeably with Emergency Preparedness.
4.5 Emergency Recall System - a computer-based automated call-out system used to activate the ERO. This system is also referred to as the autodialer".
4.6 Emergency Response Directory (ERD) - formally known as the St. Lucie Plant Emergency Response Directory, provides a list of the current (revised on a quarterly basis) Emergency Response Organization personnel.
4.7 Emergency Response Organization (ERO) - personnel trained and qualified to provide specific emergency response functions as defined by their individual positions. Persons can become members of the Emergency Response Organization by following the instructions outlined in this procedure.
4.8 EP Training Review Committee (TRC) - representatives from Emergency Preparedness, Training, and other departments who meet periodically to discuss training issues related to the Emergency Response Organization.
4.9 SAMG - Severe Accident Management Guidelines.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
9 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 5.0 5.1 INSTRUCTIONS NOTE In the event of an emergency, the Emergency Coordinator or Recovery Manager has the authority to assign personnel to positions for which they have not received the required Emergency Plan training, if that action is prudent in order to protect the health and safety of the public and plant personnel.
The training requirements listed in this procedure are for the purpose of emergency preparedness and are in addition to other training required to hold a position, e.g., Nuclear Plant Supervisor (NPS).
Personnel filling the position of Emergency Coordinator, TSC OPS Coordinator, or EOF RM OPS Advisor/Logkeeper should have SRO level knowledge (i.e., current or previous SRO license or SRO equivalent training such as Engineering Management Operations Trainina (EMOT)).
Initial Training NOTE Initial Training is intended for personnel who are new to the ERO and is designed to orient the individual to his/her function and responsibilities within the ERQ.
Certain ERO positions, as indicated in Attachment 2, ERO Initial Training Matrix, require drill participation as part of initial ERO qualification.
It may be desirable to allow persons filling the following positions to participate in and/or observe their position in a drill prior to being assigned to the ERO:
- TSC Supervisor
- St. Lucie County Technical Advisor
- Martin County Technical Advisor
- D
- 1.
§1 Initial Orientation Training (Plant Access Training - PAT) shall be PROVIDED to permanently assigned new employees.
A.
Training includes information describing:
- 1.
Actions to be taken by an individual who discovers an emergency condition.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
10 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 5.1 Initial Training (continued)
- 1.
A.
(continued)
- 2.
Location of assembly areas.
- 3.
Identification of emergency alarms.
- 4.
Action to be taken upon hearing alarms.
B.
¶4 PAT Training is CONDUCTED in accordance with ADM-18.06, General Employee Training.
- 2.
§313 Personnel shall COMPLETE the Initial Training requirements identified in Attachment 2, ERO Initial Training Matrix, prior to being assigned to the ERO.
- 3.
To become a member of the ERO, an individual should FILL OUT, Emergency Response Organization Change Request.
A.
COMPLETE the personal information (originator section).
B.
OBTAIN Department Head approval.
C.
FORWARD the Attachment to Emergency Preparedness Supervisor.
- 4.
Emergency Preparedness (EP) should AUTHORIZE the training of personnel designated to become new members of the ERO on.
- 5.
Training Department personnel should DOCUMENT completion of required training on Attachment 1 and forward to the Emergency Preparedness Supervisor when new members complete the training requirements as identified in Attachment 2, ERO Initial Training Matrix.
- 6.
EP should MAKE changes to the Emergency Recall System (ERS) and the Emergency Response Directory (ERD) upon receipt of Attachment 1 from Technical Training.
END OF SECTION 5.1
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
11 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT NOTE Retraining is intended to ensure that ERO personnel maintain the level of skill and knowledge necessary to accomplish their emergency duties.
Retraining may be accomplished through a combination of programmed instruction and/or participation in drills or exercises.
5.2 Annual Retraining
- 1.
§,
Annual retraining shall be PROVIDED at least once per calendar year.
- 2.
Annual retraining may be ACCOMPLISHED by classroom training, drill /
exercise participation option or other training method.
A.
13 Classroom training shall INCLUDE topics identified in, ERO Annual Retraining Matrix.
- 1.
The drill / exercise participation option is NOT an acceptable alternate for the following topics:
- a.
Emergency classification
- b.
Protective Action Recommendations (PARs)
- c.
Accident assessment / corrective actions
- d.
Core melt scenario
- e.
Core damage assessment
- f.
ERDADS operations
- g.
Off-site Dose Calculation (OSDC)
- h.
Recovery Manager training
- i.
Sever Accident Management Guidelines (SAMGs)
- 2.
Individuals may challenge annual retraining examinations for topics not accounted for in the drill / exercise participation option.
- 3.
Personnel who teach a class should receive credit for completion of that class at the discretion of the Site Training Manager.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
12 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 5.2 Annual Retraining (continued)
- 2.
(continued)
B.
Drill exercise participation option shall include:
- 1.
T3 A review of significant changes in the scope or content of the Emergency Plan and / or applicable Emergency Plan Implementing Procedures.
- 2.
Additional annual retraining topics identified by the EP Training Review Committee, which may include:
Review of selected initial training topics Industry operating experience A review of past drill / exercise performance problems
- 3.
Attendance at a pre-drill / exercise facility specific briefing.
- 4.
Participation in the drill / exercise as a player, controller or mentor (drills only).
- 5.
Participation in the post drill / exercise facility critique or controller critique.
C.
Other training methodologies may be USED on an as needed basis when approved by the EP Training Review Committee and the Site Training Manager and which are consistent with the training requirements of the Emergency Plan.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
13 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
5.2 Annual Retraining (continued) 1-
~~~NOTEl Deviation from this schedule requires the approval of the Chief Nuclear Officer.l
- 3.
§2 Emergency Response Facility (ERF) drills shall be conducted at least four times per calendar year and should be conducted approximately once each quarter.
NOTE It is the intent of the drill and exercise program that each ERO member have an opportunity to function in his/her position annually.
A.
Participation in drills and exercises should be TRACKED by Emergency Preparedness Supervisor and forwarded to Technical Training.
- 1.
Drill rosters should be REVIEWED and USED to record participants in all Emergency Response Facilities (ERFs) including the Emergency News Center (ENC).
- 2.
Drill critiques should LIST Players, Controllers, Evaluators, Mentors and Observers for each facility.
- 3.
Drill participation should be RECORDED in the training database.
B.
Personnel should be ROTATED through drills and exercises with the goal of having as many as feasible participate in at least one drill or exercise per year. This applies to all ERO members, including those who are NOT in the Nuclear Division.
- 1.
Participation in a drill or exercise shall be RECOGNIZED if an ERO member functions as a player, controller or mentor (drills only).
- 2.
Failure to participate in an ERF drill annually may RESULT in remedial training as determined by the Site Training Manager and Plant Services Manager.
END OF SECTION 5.2
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
14 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 5.3
¶3 Loss of ERO Qualifications
- 1.
If an individual FAILS an initial training topic, Then that individual shall NOT BE ASSIGNED to the ERO until he/she has successfully met requirements.
- 2.
If an individual FAILS Plant Access Training (PAT), Radiation Controlled Area Training (RCAT), or FAILS TO MAINTAIN qualifications for use of respiratory protection (as specified in Attachment 3), Then he/she shall promptly be REMOVED from the ERO.
- 3.
If an individual FAILS an annual retraining evaluation, Then the Site Training Manager or designee shall NOTIFY the Emergency Preparedness Supervisor or designee of the results.
A.
The individual shall not respond to an emergency until such time as remediation has been successfully completed.
B.
The individual should be REMOVED from the ERS and ERD until appropriate remedial training, as recommended by the Site Training Manager and approved by the Emergency Preparedness Supervisor, has been completed.
- 4.
The individual should COMPLETE remedial training at the earliest opportunity.
END OF SECTION 5.3
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
15 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
5.4 Training for Security Personnel
- 1.
Security personnel shall RECEIVE initial training and annual retraining for emergency response in accordance with this procedure.
- 2.
Security personnel shall RECEIVE First Aid Team training in accordance with Security procedures.
END OF SECTION 5.4
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
16 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT I
5.5 Fire Brigade
- 1.
Fire Brigade training is COVERED by the Fire Protection Plan, AP 1800022.
END OF SECTION 5.5
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
17 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY EPIP-12 ST. LUCIE PLANT 5.6 Training Exemptions and Substitutions
- 1.
No specific Emergency Plan Training is REQUIRED for ERO positions whose emergency job functions are similar to normal job functions.
Examples of these positions include:
A.
Emergency News Center / Corporate Communications Staff B.
Governmental Affairs Staff C.
Risk Manager D.
Regulatory Affairs
- 2.
The Nuclear Division Duty Officer (NDDO) is not required to participate in a drill / exercise as the emergency duties associated with the position do not differ from normal duties.
- n END OF SECTION 5.6
REVISION NO.:
PROCEDURE TITLE:
PAGE:
11A MAINTAINING EMERGENCY PREPAREDNESS -
18 of 36 PROCEDURE NO.:
RADIOLOGICAL EMERGENCY I
EPIP-12 ST. LUCIE PLANT I
ATTACHMENT I EMERGENCY RESPONSE ORGANIZATION CHANGE REQUEST I
NOTE Personnel will not be assigned to an emergency response organization position until required training for that position is completed.
0 R
l G
l N
A T
0 R
Originator:
Dept.
0 Add 0 Remove O Change (Circle new info)
- Name:
Soc. Sec. No.:
- Position number:
- Position:
Work Phone:
Home Phone:
Pager.
Other:
DEPT Non-bargaining unit personnel will not be assigned to a position f they do not have a HEAD pager.
Department Head/Supv. Signature:
Date:
/
E Authorization for ERO training P
EP Supervisor Date:
I I
T R
A
¶50 The individual listed above meets the training/qualification requirements of EPIP-12 for the position(s) indicated per the Personnel Qualification Database (PQD).
N I
Signature:
Date I
N G
7 0 Pager correctly programmed:
Date:
/
/
Init.:
0 Emergency Recall System database updated:
Date:
I /I Init.:
E 0
Emergency Response Directory (draft) updated: Date:
I
/
Init.:
P 0
Notifications to ERO:
Date:
I Init.:-
¶5 0 Notification of Personnel Qualification Database (PQD) Administrator Date:
I Init.:-
END OF ATTACHMENT i
REVISION Nt..
(
(
TI`
U~t~r-IJUrUEt II Lrt PAGL.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 19 of 36 I
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 1 of 9) 0 0
-~~~~~~~~~~
(D 0
C E
C In l~~
~~~~
Li en e
E Cl l
l l
l G
l G
In:~~~~~~~~~0 V
~~~~~~~~~~~~~~~~~0 NLO~~~2 X
=
n X)
Z l0 In l
Z 00 O
100~~~~~~~~~~~~~~~~~0 DCS X
G Xn 0
101 EmrgencyCoordiator X
=
X
=
=
X X
X X
X X
=
=
==
=
=
=
X
=EX 102 T0 G
=
X 0
E 0
0 0
W 030 ERO#
POSITION W
0 COU W
W W
Q.
>0
<U.
Wt i
U 0
13 LicensedEC P
G G'
XiX X
X X
X STA X
G X
X X
NLO X
X G
G__G
___PS/SEC/First Aid Responder 100 DS XG XG w
XI 101 Emergency Coordinator X
X GX X
X X
X
__X
__X 102 TSC Supervisor X
-X
-G
__X X
104 TSC Chem. Supervisor X
X G
X X
X X
X X
105 TSC Reactor Engineer X
X G
I I
XX X
-L X
= Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam 2
- Simulator practice session with E-Plan events
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSUPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring
REVISION NU..
f K
I PROCEDURE TITLE:
PAGE.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 20 of 36 I
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 2 of 9)
C T 00 108 TSC MM PST Rep.
X _
X G
X
~
0 0~~~~~~~~~~~~~~~~~~~~~~
11~~~~~~~~~0 TS OP C
o riar X
X S 112~~~~~
TSC HPomniao XS
=
C 1
0 S
P X
X 0
X 114 T=
E 0
0~~~~~0.0 0
0
~ ~
~
~
~
~
~
~
~
~
C E
~ ~
E E ~
~
8 o
0 0
2 ~
a
- 0) 8E E
E R O #P O S T I O NW W
I -
0 (k ~ C O W
W W
0a C
C.)2C.)
W L L 0
L W
CLC 1
0 7
T S
C E M P S T ~ ~ e p.
X C_
G
~I e
1 1
1 T
S C ~ o s e ~ s s e s s2r X
X GX-112 TSCHCommunicto r
X X
GX 113 l TSC Dse Asealor X
X G
x X
G I-X = Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSUPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring
REVISION Nt..
(
(
PROCEDURE TITLE:
PAG..
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 21 of 36 A
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 3 of 9)
EROtl POSITION 0
8
.2 I
R i
X X
G X
120 TSC Coord.
with~C o'
OSC X
0 L
L O ~ ~ 3 r
n o ~ ~
2 2
0 2
0 Co W
0 0
2 2~ ~ Ck 0~c
~ ~
11 TSCERdAnSteff X
aX G_
1 1 8 T S C S R O P S T ~ ~ ~ e p.
X X
G X'6 M
124 TSCEC AssistILog.
X X
G X
X X
X
=
X G
G
=
=
X
=
==
==
X
= Required C
= Respirator Only I
= Included In ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSLPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring
REVISION NU..
(
(
U -
PROCEDURE TITLE:
PAGL.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 22 of 36 A
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 4 of 9) 0~~~~~~~~~~~
C ID 0
0
-~
~~~~
~~
o0 153~~~~~~~~~
~
OS.&
eEty u v 05 O
co 0
M
.0~~~
EE c
0 0~~~~~~~~~~~~~~~~wL C
X 0
0 C
8 0
8
=
157 OSC Supervisor
/0 Manager X
X G
_X C
0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Mc
)
i~~~~
i MQ r
E 0 U) ~~~~~c U.
- 0)
E E
CC E
w
)
aIL ERO #
POSITION LU LU 1-0 U
C)
LU U
LU a-
<8 i
o u.L w
c 0: )
X XGG 153 OSC I&C Re-Entry Supv.
X X
G G
154 OSC MM Re-Entry Supy.
X X
G G
X X
G G
X X
156 OSCEle~cilChief X
X G
G 157 OSC Supervisor/I Manager X
X G
X G
X~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
X GX
160 OSC Chemist X
X GGG 3D X
= Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSUPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFd Pool D = Included in Emerg. Rad. Monitoring
(
(
REVISION NO..
Y PROCEDURE TITLE:
PAGE.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 23 of 36
- 0 ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 5 of 9)
C
~~~~~~~~~0 o
C~~~~~C U~~~~~~~~~~~~~~~~~~~~~U ERO
.0 Pe 162 OSC Mechanic X
X G
G
_~~~~~~C C
163 OSC l&C Spec.
X X
GG 0D 0
CC.
.9
~~~~
0 0
0~~~~~~~~~~~~~~
-c 168 OSC MM Foreman X
X G
G
__~
M 169 0SC.-MM Staff Rep.
XXG 0_
170 OSC Safety Rep.
X
==
X E)
(L z
0~~~~~~~~~~~
0 C~
0 co Co.2.
2 C O O C.
2 E
O
.2 82 0o o
E 0
05 0 E
E 0:
e 00 0
EE 0
ERO#
POSITION W
W I-0 It Uo W
W W
Q.
W I-UC) 8 iz Lu U C 0
161 OSC Electnician x
X G
x X
GG G
165 OSC On-Shift Security Spec.
X
_x GX 166 OSC Dos!. Tech.
X X
G 168 OSC MM Foreman X
-X G
x XG 170 OSC Safety Rep.
x XGG G
X = Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSUPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring
- ?EVISION Nu..
11A
(
(
7 PROCEDURE TITLE:
PAG,.
PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 24 of 36 ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 6 of 9)
.2 C
.9 E
Lu t
Cu V-0O a)
- 0 CL 0) 0.
C.)
I--
E Cu C
o Cn 0
I 0.
C.)
C 0
C.)
Cu E
Lu cQ 0z oCu 122 a)E LU 0
Lu C2 09 CO)
C 00 o
Cu a) 1=
Cu 8
Cu U) 0
.Co 0
V) 0 8
C (D
E 0
cm Eo cu 0
0 0
02
.C
'C 0
0Cu 2
Cu2 Lu U)
C 0
CU 0
C' 0
LU 9
ID iti La LL U)E
.o C
Cu 0
cc)0 coC0 8
E2 Cu C.)
U 0
- 0 co 02 m
I '
C 0co Cu Cu0 w
Cu M
1z I
o
.Y C
CO 0.aIo l D 11 I _
ERO #
POSITION 171 OSCAdminTech/Log.
X X
G 172 lAssemblyArea Supv.
X
=X G
lX X
G G
174 OSC Prot and Control Rep X
X G
X X
GG G
176 Field Mon Team Diver X
X G
G/C 177 OSC Info Services Rep.
X x
G 200 Recovery Manager X
X H
X X
X X
205 Govt. Affairs Mgr.
E E
I E l==
- 0 X
= Required C
= Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam 2
- Simulator practice session with E-Plan events
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSL/PTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included In Emerg. Rad. Monitoring
REVISION NU..
(
(
- -
PROCEDURE I ITLE:
PAGL.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 25 of 36 L
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 7 of 9) 0~~~~~~~~~~~
0)~~~~~
21 E
S 0
2 CD CA 0
E C1 8
0 0
232~~~~~~~~~~~~~1 EO Meh Enine X
=
H=
=
=
=
=
=
0 0
E 0
2L U
2 2
M
.0 ea 0 IL
()
a
!3 M30 0
0 0C CO0 g,~
C) 0 E
E n
E E
C0
(
8 E
R O#
POSITION W~~~2 W:
Of 0<
WM WM WU 0
C.)
CD>
I
>U IL 209 EOF RMOPS Ad/Log.
X X
H X
X X
XX H
==
X
==
216 EOF Status Board Keeper X
X
=
=
H
230 EOF Eme Tchia Mar X I H
_X 231 EOF Project Engineer X I H
X 232 EOF Mech. Engineer X
XH
233 EOF Nuclear Engineer X
X H
X 235 EOF Nuc Fuels Eng.
XX HX x
x
236 EOF Civil Engineer XX H
X = Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSL/PTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring
'i REVISION NO..
(
(
Y PROCEDURE TITLE:
PAGL.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 26 of 36
.5 ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 8 of 9) 0 237 EOF l&CcEngneer C~~~~~~~~~~~~~~~~~~~~~~~~~~~~C 238 E
E EX 2450C EOFto ss s
rMXHX 0
0 X 250~~~~~~~~~~~~~~~~~~~~a EOF Nuc Lic Mgr X
XE 255 EOF Com XX 0
=
I3 260 0
0 E
C
=
Requird c~~~~~
0
~~~~~~~~
H 0C C
co0cm0
-M I
o El
.2c d
LL co 0
0 ID ID 0
0o 0
0 C
8 V
0 EC 0
CU)U 4
ERO#
POSITION LU LU H
0 w
Un LU LuW
- 0.
H C.
C.
LU LUiL 0
IL LU it~
X HX 238 EOF Electrical Engineer X
X H
X__
X HX X
X XX 245 EOF Dos AssessorFMT X
X H
X
-X X
X H
X X
X 247 EOF RadStat Bds Keeper X
X 250 EOF Nuc. Lic. Mgr.
X XHXX 255 EOF Communicator X
X H
__X 260 Emerg. Security Mgr.
X XH X
= Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSUPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included In Emerg. Rad. Monitoring
REVISION NU..
11A
(.
(
7 PROCEDURE TITLE:
PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 27 of 36 5.
ATTACHMENT 2 ERO INITIAL TRAINING MATRIX (Page 9 of 9) 0.
0
'30 0
E w
0V LL LLw 0
Q 0
L 0
0 E
0 0
i-o 0:
0 08 C.
9 rn C
0 is 0
0 0'
0Ew 0
0 z
a(2 (D
LE C
C0 toD O~~~~~~~4 0
'D C
0 0
0 Lii 0.99 8
Cn co P)C 0
.C,o 8m2 D)
B E
0E 0
o 0
00 0
8 CD
.C 0
0 0M 12 0
SD E
0C 0
000 U) a 0
w E0 I-E C
C 0
c a
C) 0 0
0 E
.D 1i 8
E a
(D 0
0)
.a LL
.0 LL.
(2 C
I '
2 V)
,0
POSITION 0~~~~~~
270 EOF Emerg Info Mgr E
E H
E 271 NDDO E
EH E
E E
273 EIM/ENC Tech Advisor X
X H
280 EOF Admin Supervisor X
X H
281 EOFAdminStaff X
X H
291 Govemor's Advisor 294 St. Lucie Co Tech Adv X
X H
295 Martin Co Tech Adv X
X H
300 Emer Control Officer E
E H I E
E E
X = Required C = Respirator Only
= Included in ERO Activation training for DCS only:
- Autodialer JPM
- Written exam
- Simulator practice session with E-Plan events 2
= If qualified to hold shift position, Then position meets ERO qualification criteria E = PSLtPTN Common Responder Version G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool D = Included in Emerg. Rad. Monitoring END OF ATTACHMENT 2
REVISION NU..
(
rrKUtUUKrt I I I Lt:
PAG.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 28 of 36
£ ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 1 of 9) 2 a,w C,
U, co
'a C
C 0
0'a Cu CL D
0w to0 ZD w
'C 0CA a0 a,
S co 8
a, E
w fi a,
t0 P
LLI 0
e-
'o C
.2
'C 0
O c)
- 9 O
.a 02C 0'c (D
8
.2 ci v
a,E 2
0) 01cm E
0 0C-)
C 0
M 3
a, 2' CD~~~~C E
LU 0'0 W
a:
0 1!
w
.o 0Q tO) aa
'C LU S
2I CL 0aCO 0
a
'a Cu 0I cnm 2,
M=
.E LO 0
LI FRO #
POSITION uw~ ~
~
~~'
Licensed EC X
=
G X
X X
X STA X
G
_X X
NLO X
-=
G G
==
G PS/Sec/First Aid Responder G
101 Emergency Coordinator X
G X
X X
X X
F 102 TSC Supervisor X
G X
G 104 TSC Chem. Supervisor X
=
=
G
=
=
=
=X 105 TSC Reactor Engineering X
=
G X
F 106 TSC Communicator X
G X
X = Required C = Respirator Only 2 = If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSL/PTN Common Responder Version F = SAMG Requal Frequency IAW ADM-1 1.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool
REVISION Nu..
1(
l I.
PROCEDURE TITLE:
PAGL.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 29 of 36 I.-
L ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 2 of 9) 0 0 ~
~
C C o
T O
CD 0 G
G X
114~~~~~~
~~~
X a
=
G =-
116 8io T
E T
0a ILL
~
0 0
C LD 0
o E0EE f.
ERO#0 POSITION 1-0 w
CO Il U
Ow 8
8 iw irL 0
i r
X G
-F 108 TSC MM PST Rep.
XG F
G F-111 TSC Dose Assessor G
G X
113 TSC SP Phonetalker XGX 114 TSCERDADS Op.
X G
X 115 TSC PST Leader XG
GG X = Required C = Respirator Only 2 = f qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSLIPTN Common Responder Version F = SAMG Requal Frequency IAW ADM-1 1.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool
REVISION NO..
f
(
I-
-nnn
-ID TIT tKU%,rLJU~r II1 Lt:-
PAGE.
11A PROCEDURE NO.:
EPIP-12 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 30 of 36 ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 3 of 9) a, I-C.,
U, 0
S M
R
=D U-0w 8
U cc m
C.
U)
C-0 2'
Ewu Ca C
0=
0z 2)
E w
0.
0 Q
0
.a o
a, A0 2
LD C
E a,
0a,E CZ CD 0
0' C
E 0
C 0
0 U) a w
I'n a)
I; I-*0I C.
aco 0
- 0 0I 21 co CZ I
I O l r to ERO #
X G
G 121 TSC Admin Staff X
G 124 TSC EC AssistILog.
X G
X X
X G
G X
X G
X
=
G G
X = Required C = Respirator Only 2
= If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSLJPTN Common Responder Version F = SAMG Requal Frequency IAW ADM-1 1.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool
REVISION Nu..
(
(
I. '
PROCEDURE TITLE:
PAG".
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 31 of 36
- 1.
ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 4 of 9)
C 0co a
M ZD C
C U)0 0
C C
U-0w a:
C.)
U C.)
C)
C' C
._o (1) a E
w C
0 8
z u
w 11 co C
0
.E a,
08a 7o a)
'a 8
0
.r 2
aC a) aEto w
a) 0)
0) 0 8
0
.a C
'C C
0
-D 2
a,E w
a a
006 0
0 LU w
E w
a, a,
- i-
- 0 I,
C.)
a en 0
.m co I!
0) 01
.E a
0.
a2 80 tD U)
EROn #
POlITIlN 154 OSC MM Re-Entry Supv.
X G
X G
G 156 OSC Electrical Chief X
G G
157 OSC Supervisor / Manager X
G 158 OSC Coord.
th TSC X
X
_G X
160 OSC Chemist X
G G
161 OSC Electrician X
G 162 OSC Mechanic X
G G
X = Required C = Respirator Only 2 = f qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSUPTN Common Responder Version F = SAMG Requal Frequency IAW ADM-11.11 G = TraininglRequal Frequency IAW other Plant Procedures H = FFD Pool
a
REVISION NU..
(
(
I IrKU%,rUUKrt II L:
PAc.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 32 of 36 ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 5 of 9)
.0 I-a, 0
0 Ico uu0w 0)V)
UU)
C 0.2 a
2' A
U 8!S w
U) 0 a.oS w
.e Z
ID EU (2
0 C0 0COD c)
-A 0.o C
aC U
U) 0 C.
ca,SE to (0
0) 0)CD SE M
a P2 0
'cm C
0 a,wE6 lU Co C
0 Cs 0
0 U)
Ix'C jL 0C U)0 0)
Li:
a,(1 IZ wi e7 CO ERO #
X G
G 165 OSC On-Shift Security (Spec.)
X G
166 OSC Dosi. Tech.
X G
168 OSC MM Foreman X
G G
X G
170 OSC Safety Rep.
X G
G 171 OSC Admin Tech/Log.
X G
172 AssemblyArea Supy.
X
=
G
=
X = Required C = Respirator Only 2 = If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSUPTN Common Responder Version F = SAMG Requal Frequency IAW ADM-11.11 G = TraininglRequal Frequency IAW other Plant Procedures H = FFD Pool 30
t1 REVISION NO.:
(
(
PROCEDURE TITLE:
PAGi.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 33 of 36 ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 6 of 9) 0 Q1 C
,)
0
'a CL C,
0 in 6
0 15 C
C I-0w
.1 C.
C.
C 0
0 0
U.)
0 w
Q e
E w
0C 0
- 0
..a z
0 0E uJ 0D
<,:~~~~
0Q 0
.)0 c
Q 0.C a
0 0
0 U)
C/)
0I3 8o t0E 0)cm EE 0
0 o
cm C
.o 0
M iiW E
C, 0
0 aUU E
I-L g 0 0
0U,)
o8 cm
.C-2 a,
R ERO #
POSITION 173 OSC OPS Re-Entry Supv.
X G
G-174 OSC Prot and Control Rep
=
X
=
G G
178 Field Mon Team Driver X
G G/C 177 OSC Info Services Rep.
X G
200 Recovery Manager X
H x
x X
205 Govt. Affairs Mgr.
X H
X H
X X = Required C = Respirator Only 2
= If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSUPTN Common Responder Version F = SAMG Requal Frequency IAW ADM-1 1.1 1 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool
REVISION Ni..
(
(
I.-,
PROCEDURE TITLE:
PAGL..
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 34 of 36 L
a.
ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 7 of 9)
E o
a,~~~
t r
030 EOF E
a, a,
u o
o 2~~~~~0 231 EOF Project Engineer 0
X
- 232a, a
0 a)
E 236 EOFE a
aX 237 EOF l&C Engineer X
H a
238~<
E E
Ege
=
0 X
H=
C) 0
)0 E
E
.(
B a,1 ERO #
POSITION 0
w Cw CO U
UJ Q.
C)
C.)
LU LU L
0 I
co) 216 EOF Status Board Keeper X
H 230 EOF EmeE9 Technical Mgr X
H 231 EOF Project Engineer X
H 232 EOF Mech. Engineer X
H
__X 233 EOF Nuclear Engineer X
H X
235 EOF Nuc Fuels Eng.
XHXXx X
F__
236 EOF ivil Engineer X
__XH 238 EOF Electrical Engineer X
H X = Required C = Respirator Only 2
= If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSL/PTN Common Responder Version F = SAMG Requal Frequency IAW ADM-11.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool
j
vl REVISION NO.;
(
(
9 Y '
PROCEDURE TITLE:
PAGIc.
11A PROCEDURE NO.:
EPIP-1 2 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 35 of 36 ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 8 of 9) tD M
0)I S
M.
0 a
I U-0LU 000 6cr_
U)
C-0 0
0 0
21 LU I
0 z
U CD 2
EU Q
.S 0
0 C)0 0
.0
.M C
0 U) 0)
M A
0E W
9.20 E
M 8
0 C
.c 0
- oC 0
2 LU rM w
E u]
eC0 0
0)a a
It cm C.9 fi-Im I
I-LA.
C.
0Cl) 0 0
0)E jL a
C, ci ERO #
H l X
245 EOF Dose Assessor/FMT
=
XH X
=
=
=
H X
X 247 EOF Rad Stat Bds Keeper X
H
=
250 EOF Nuc. Lic. Mgr.
X H
X 255 EOF Communicator X
H X
260 Emerg. Security Mgr.
X H
270 EOF Emerg Info Mgr.
E H
271 NDDO E
H E
E X = Required C = Respirator Only 2
=
qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSL/PTN Common Responder Version F = SAMG Requal Frequency IAW ADM-11.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool X
REVISION NO..
(-
(
PROCEDURE TITLE:
PAGt.
11A PROCEDURE NO.:
EPIP-12 MAINTAINING EMERGENCY PREPAREDNESS -
RADIOLOGICAL EMERGENCY ST. LUCIE PLANT 36 of 36 L
ATTACHMENT 3 ERO ANNUAL REQUALIFICATION MATRIX (Page 9 of 9)
.~~
~ ~
a, I-a, w
0
,a IL 0° w-0 C)
M m) oM
',C M
0=
a)
C)
U E
w w
C 0
z E
E w
'D C
0 a,
t 0
C t
0c 8
.5 C
E t
a, Q
0' EM 8
0' 0
C 0
2' a,
E w
0C 0
0 a
uu E
a LL j_
C-0 U)0 0
'co a,
A-C 0
a 8
it 2
CD FRO #
POSITION 273 EIM/ENC Tech Advisor X
H 280 EOF Admin Supervisor X
H I
=
281 EOF Admin Staff X
H
=
291 Govemors Advisor 294 St. Lucie Co Tech Advisor X
H 295 IMartin Co Tech Advisor
=
X H
=
==
=
300 Emergency Control Officer I
E H IE E
X = Required C = Respirator Only 2 = If qualified to hold shift position, Then position meets ERO qualification criteria:
E = PSL/PTN Common Responder Version F = SAMG Requal Frequency IAW ADM-11.11 G = Training/Requal Frequency IAW other Plant Procedures H = FFD Pool END OF ATTACHMENT 3
Procedure No.
ST. LUCIE PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE SAFETY RELATED EPIP-1 3 Current Revision No.
7A Effective Date 07/14103 FPL I.
Title:
MAINTAINING EMERGENCY PREPAREDNESS -
EMERGENCY EXERCISES, DRILLS, TESTS AND EVALUATIONS PSL II I
Responsible Department: EMERGENCY PLANNING ING
(
8 REVISION
SUMMARY
Revision 7A - Incorporated PCR 03-1890 to delete references to pro (Margaret DiMarco, 06/06/03) 5 I,_
I
'9&l4iR.DUCTION W
Revision 7 - Added step to forward critique items to TRNG MGR via PMAI, added steps to ensure drill exercise scope and duration adequate to meet each participating agency objectives and made editorial / administrative changes. (J. R. Walker, 06/28/02)
Revision 6 - THIS PROCEDURE HAS BEEN COMPLETELY REWRITTEN. Reformatted program maintenance checklists. Changed frequency of facility surveillances. Made administrative/editorial changes. (R. Walker, 09/27/01)
Revision 5 - Added quarterly test for ERDS link and reference to Generic Letter #GL 93-01.
(J. R. Walker, 12/07/00)
AND Deleted reference to PSL policy PSL-1 10, revised FRG review of EPIPs, changed the symbol of response to CROO-0544 from regulatory commitment to mgmt directive and added EPIP-08 to the list of EPIPs. (J. R. Walker, 10/13/00)
Revision 4 - Added staff augmentation program maintenance items and NRC performance indicator tracker. (D. Calabrese, 04/27/00)
Revision 0
FRG Review Date 12/15/97 Approved By J. Scarola Plant General Manager Approval Date 12115/97 Revision 7A FRG Review Date 06/27/02 Approved By Dick Rose Plant General Manager N/A Designated Approver D. Calabrese Designated Approver (Minor Correction)
Approval Date 06/28/02 DATE DOC' DOCI SYS COM ITM S_OPS r
PROCEDURE q
EPIP-13 COMPLETED 7A 06/06/03
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 2 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE.................................
3
2.0 REFERENCES
/ RECORDS REQUIRED / COMMITMENT DOCUMENTS.. 3 3.0 RESPONSIBILITIES.................................
4 4.0 DEFINITIONS................................
6 5.0 INSTRUCTIONS.................................
9 5.1 Plant Services Manager Instructions...........
..................... 9 5.2 Emergency Preparedness Supervisor................................
11 ATTACHMENTS ATTACHMENT I EP PROGRAM MAINTENANCE CHECKLIST.13 DATA SHEETS DATA SHEET 1 DATA SHEET 2 DATA SHEET 3 DATA SHEET 4 QUARTERLY EP MAINTENANCE CHECKLIST....................... 16 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION. 18 EPIP BIENNIAL REVIEW..................................
19 EP EXERCISE CHECKLIST............
...................... 21
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 3 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 1.0 PURPOSE 1.1 This procedure provides instructions for:
- 1.
Periodic exercises and drills conducted in order to test the state of emergency preparedness by FPL personnel, support organizations and off-site governmental agencies.
- 2.
Periodic tests and reviews of components of the Emergency Planning Program (e.g. facilities, equipment, Emergency Plan and Emergency Plan Implementing Procedures, etc.) conducted to ensure availability, operability and reliability.
2.0 REFERENCES
/ RECORDS REQUIRED I COMMITMENT DOCUMENTS NOTE One or more of the following symbols may be used in this procedure:
§ Indicates a Regulatory commitment made by Technical Specifications, Condition of License, Audit, LER, Bulletin, Operating Experience, License Renewal, etc. and shall NOT be revised without Facility Review Group review and Plant General Manager approval.
1 Indicates a management directive, vendor recommendation, plant practice or other non-regulatory commitment that should NOT be revised without consultation with the plant staff.
T Indicates a step that requires a sign off on an attachment.
2.1 References
§,
St. Lucie Plant Radiological Emergency Plan (E-Plan) 11 QI 1-PR/PSL-1, Site Organization
¶12 QI-1-PSL-15, Security Organization 3
QI-5-PSL-1, Preparation, Revision, Review/Approval of Procedures
¶4 Ql-1 7-PSL-1, Quality Assurance Records NBS-NPS-EP-WP-001, Public Alert and Notification System Testing, Maintenance and Engineering ADM-25.02, NRC Performance Indicators
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 4 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 2.2 Records Required
¶4 The following records are maintained in accordance with QI-17-PSL-1, Quality Assurance Records:
Data Sheet 1, Quarterly EP Maintenance Checklist Data Sheet 2, Emergency Plan 6 Year Element Demonstration Data Sheet 3, EPIP Biennial Review Data Sheet 4, EP Annual Exercise Checklist
- , EP Program Maintenance Checklist 2.3 Commitment Documents
§2 10 CFR 50, Domestic Licensing of Production and Utilization Facilities
§5 Generic Letter #GL 93-01, Emergency Response Data System Test Program 5
PMAI #96-02-237, Evaluation of Continuous Emergency Response
§3 NOV Response L-97-20, Violation II. A, Part 4.D.
¶6 CR 00-0544, QA Audit (Ineffective Corrective Actions) QSL-EP-00-02
¶7 Quality Assurance Audit Report, QSL-EP-02-02, Improvement Item (Forward Critique Reports to Site Training Manager) 3
¶8 PMAI PM02-03-001 (Adequacy of Drill / Exercise Scope and Duration) 3.0 RESPONSIBILITIES 3.1
§,
The Plant Services Manager is responsible for:
- D
- 1.
Planning, scheduling, and coordinating emergency exercises involving off-site agencies.
- 2.
Reviewing Attachment 1, EP Program Maintenance Checklist, upon completion.
- 3.
Reviewing results of exercises and major drills.
i- -
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 5 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 3.2
§,
The Plant Services Manager, in conjunction with plant management, is responsible for ensuring that adequate resources are made available to support and conduct emergency preparedness activities including:
- 1.
Exercise and drill scenario development and control
- 2.
Exercise and drill participation
- 3.
Support for maintenance of emergency facilities and equipment 3.3
§1 The Facility Review Group (FRG) is responsible to review the following:
- 1.
Revisions to the St. Lucie Plant Radiological Emergency Plan.
- 2.
Revisions to Emergency Plan Implementing Procedures (EPIPs) other than minor changes.
- 3.
Biennial Exercise Critique Report.
3.4 The Emergency Preparedness (EP) Supervisor is responsible for:
- 1.
Maintaining awareness of EP activities.
- 2.
Ensuring coordination of EP drills and exercises in accordance with this procedure.
- 3.
Ensuring documentation of EP program maintenance in Attachment 1, EP Maintenance Checklist.
- 4.
Ensuring documentation of major element demonstration as indicated on Data Sheet 2, Emergency Plan 6 Year Element Demonstration.
- 5.
Ensuring critiques of exercises, drills, and actual events are conducted, documented, and that deficiencies are addressed in accordance with plant corrective action practices.
A.
¶7 Drill and exercise critiques should be forwarded, via PMAI, for review by the Site Training Manager for needed changes to training courses or materials.
B.
Drill and exercise critiques should be forwarded to the applicable Emergency Response Facility (ERF) managers and I or supervisors for possible correction to open performance discrepancies, if deemed appropriate by the EP Supervisor.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 6 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 3.4 The Emergency Preparedness (EP) Supervisor is responsible for: (continued)
- 6.
Ensuring that EPIPs are reviewed through feedback from the following sources:
A.
Daily use B.
Drills and exercises C.
Actual events D.
Training E.
Biennial EPIP review as indicated on Data Sheet 3, EPIP Biennial Review
- 7.
Ensuring biennial review of the Recovery Plan.
4.0 DEFINITIONS 4.1 Annual - Annual is defined as once per calendar year (January 1 through December 31).
4.2 Biennial - Biennial is defined as once per two calendar years.
4.3 Drill
- 1.
Communications Tests and Drills - Communications tests involve the use of emergency communications equipment to verify operability.
Communications drills involve use of emergency communications equipment to notify and transfer simulated emergency information to off-site governmental agencies.
- 2.
Health Physics Drills - Health Physics drills test various tasks employed by that department during an emergency condition. Health Physics drills are conducted semi-annually and one of the semi-annual drills may be incorporated into the radiological monitoring drill.
- 3.
Medical Emergency Drill - A medical emergency drill involves a simulated contaminated individual, with provisions for activation of the plant First Aid/Personnel Decontamination Team. Participation by local support services (i.e., ambulance and off-site medical treatment facility) is tested separately once per year or as part of the annual medical drill. Medical Emergency Drills are conducted at least once every calendar year.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 7 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 4.3 Drill (continued)
- 4.
Radiological Monitoring Drill - Radiological monitoring drills include collection and analysis of air samples, testing of communications, and understanding of messages between Health Physics supervision and the off-site monitoring teams. A radiological monitoring drill will be conducted at least once every calendar year.
- 5.
Emergency Response Facility (ERF) Drill - An ERF Drill demonstrates various emergency response capabilities including management and coordination of emergency response, accident assessment, protective action decision-making, and plant system repair and corrective action involving all or certain Emergency Response Facilities [Control Room, Technical Support Center (TSC), Operational Support Center (OSC),
Emergency Operations Facility (EOF), and/or Emergency News Center (ENC)]. These drills are conducted at least four (4) times per calendar year and should be conducted approximately once each calendar quarter. One of these drills is designed to satisfy the requirements of an exercise as defined below.
Non-exercise drills provide an opportunity to consider accident management strategies. Supervised instruction can be permitted for these drills, with operating staff having the opportunity to resolve problems (success paths) rather than have controllers intervene. Additionally, non-exercise drills may focus on on-site training objectives.
4.4 Exercise - An exercise is an event that tests the integrated capability of a major portion of the basic elements existing within the St. Lucie Plant Radiological Emergency Plan. An exercise is required biennially per 10 CFR 50. Off-site agency participation is required biennially. Exercises are developed, scheduled, and conducted in a manner consistent with the regulations and guidance of 10 CFR 50 Appendix E, NUREG 0654, and other appropriate regulatory documents.
Biennial exercises involving off-site agencies shall be conducted as a Site Area Emergency and should escalate to General Emergency. The exercise scenarios are varied such that all major elements of the Plan are tested at least every six (6) years.
4.5 Letter of Agreement (LOA) - Support or assistance from outside agencies is established and maintained through Letters of Agreement or, in some instances, purchase orders/contracts.
Letters of Agreement are confirmed annually through correspondence, direct contact, or by telephone. Each agreement is renewed at least every three (3) years. Purchase orders/contracts are renewed as required.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 8 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 4.6 Monthly - Monthly is defined as at least once each calendar month, being the first day of each month until the last unless otherwise specified.
4.7 Quarterly - Quarterly is defined as once per calendar quarter, with the quarters being January through March, April through June, July through September and October through December.
4.8 Semi-annual - Semi-annual is defined as twice per calendar year, with one time from January 1 to June 30 and one from July 1 to December 31.
0
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 9 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 5.0 INSTRUCTIONS 5.1 Plant Services Manager Instructions
- 1.
REVIEW completed documentation of Attachment 1, EP Program Maintenance Schedule, on an annual basis.
- 2.
ENSURE that State and County Emergency Management officials are made aware of non-emergency events that have a potential for media interest.
A.
INFORM Emergency Preparedness (EP) of event B.
VERIFY that EP has informed appropriate Emergency Management officials.
- 3.
§,
ENSURE that State and County Emergency Management officials are made aware of the following on an annual basis:
A.
Significant changes to the Emergency Plan/EPIPs.
B.
Emergency Action Levels (EALs)
- 4.
MAINTAIN awareness of the status of the Alert and Notification System (ANS) operability.
A.
ENSURE that degradations of the ANS are promptly addressed.
- 1.
The Manager, Nuclear Plant Support Services is responsible to maintain operability of the ANS per NBS-NPS-EP-WP-001, Alert and Notification System Testing, Maintenance and Engineering.
- 5.
§,
ENSURE the following is performed in support of exercises:
A.
SCHEDULE a date for the exercise in coordination with the primary State and County emergency response agencies.
B.
PROVIDE the opportunity for State and County response agencies to participate in an exercise.
C.
¶8 ENSURE that annual exercise scenarios address the objectives of each participating agency.
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 10 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 5.1 Plant Services Manager Instructions (continued)
- 5.
(continued)
D.
COORDINATE FPL efforts with other participating personnel, organizations, and agencies.
- 1.
If the Federal Emergency Management Agency (FEMA) is evaluating State and County emergency response, Then ENSURE that the exercise scenario is developed within the timeframes specified by the regulations, as defined in Data Sheet 4, EP Annual Exercise Checklist.
E.
DISCUSS and EVALUATE annual exercise performance with plant management, FPL controller/evaluators and principal participants.
END OF SECTION 5.1
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 11 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 5.2 Emergency Preparedness Supervisor
- 1.
At the beginning of each calendar year:
A.
REVIEW the items on Attachment 1, EP Program Maintenance Checklist and ESTABLISH a working schedule.
- 2.
MAINTAIN awareness of status of completion of Attachment 1, EP Program Maintenance Checklist.
A.
Response actions performed as part of actual plant emergencies may be CREDITED as completing one or more of the following drills or tests:
integrated facility activation drill call out phone test/drill HP drill off-site agency communications medical drill B.
Activities incorporated within a multiple scope drill or exercise may be CREDITED as completing a drill or test, for example:
HP drill, medical drill, off-site communications, etc.
C.
16 Off Hours Augmentation including:
weekly tests of automated recall system quarterly off-hours phone test (at least one per year should be manual) monthly review of Emergency Response Directory quarterly verification of Emergency Response Directory data quarterly verification of Emergency Response Directory distribution list quarterly publication and distribution of Emergency Response Directory
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 12 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT 5.2 Emergency Preparedness Supervisor (continued)
- 2.
(continued)
D.
NRC Performance Indicators PREPARE and SUBMIT in accordance with ADM-25.02
- 3.
ENSURE completion of the items on Data Sheet 1, Quarterly EP Maintenance Checklist.
- 4.
ENSURE the completion of the items on Data Sheet 2, Emergency Plan 6 Year Element Demonstration.
- 5.
ENSURE the completion of the items on Data Sheet 3, EPIP Biennial Review.
- 6.
ENSURE the completion of the items on Data Sheet 4, EP Annual Exercise Checklist.
- 7.
REVIEW annual drill and exercise program with state and county representatives.
- 8.
¶8 ENSURE the scope and duration of annual exercise is adequate to meet objectives of each participating off-site agency.
X.
END OF SECTION 5.2
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 13 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT ATTACHMENT I EP PROGRAM MAINTENANCE CHECKLIST (Page 1 of 3)
Semi-Annual/Annual/Biennial EP Maintenance Items:
§,
- 1.
HP Drill (Semi-Annual)
A.
(Jan-Jun) Date I
B.
(Jul-Dec) Date
/_/__
§,
- 2.
Radiological Monitoring Drill (Annual)
A.
Date
/
I
§1,2 3.
Biennial Exercise (Include Data Sheet 4, EP Exercise A.
Date I
B. FEMA Evaluated (Even Years Only)
Yes / No
§,
- 4.
Annual Offsite Agencies Communications Drill A.
Date
/
§,
- 5.
Annual Unannounced Communications Drill A.
Date___
__/__
§,
- 6.
Annual Medical Drill A.
Date
/___
/
(YEAR)___
INITIAL / DATE Checklist)
Checklist)
I_-____
SOPS DATE_
DOCT CHECKLIST DOCN EPIP-13 SYS COMP COMPLETED ITM REV
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 14 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT ATTACHMENT I EP PROGRAM MAINTENANCE CHECKLIST (Page 2 of 3)
Semi-Annual/Annual/Biennial EP Maintenance Items (continued):
§1
§1
§1
- 7.
Emergency Plan Review:
A.
Emergency Plan Review (Annual)
B. Letters of Agreement Certification (Annual Confirmation/Triennial Renewal)
C. EPIP Review (Even years only)
(Include Data Sheet 3, EPIP Biennial Review)
- 8.
Media Day (Annual)
- 9.
Public Information Brochure (Annual)
- 10.
Review and update Six Year Plan (Annual)
(Include Data Sheet 2, Emergency Plan 6 Year Element Demonstration)
- 11.
Significant Emergency Plan/EPIP Changes, Emergency Action Levels (EALs) Meeting with State/County Emergency Management (Annual)
- 12.
Hospital Training (Annual)
- 13. Off-site Training (Annual)
- 14.
Recovery Plan Review (Biennial)
(YEAR)
INITIAL / DATE
___I______
I__
_______I
-___I I
§1
§1
§1
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 15 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT ATTACHMENT I EP PROGRAM MAINTENANCE CHECKLIST (Page 3 of 3)
(YEAR)__
Semi-Annual/Annual/Biennial EP Maintenance Items (continued):
INITIAL / DATE
- 15. Annual training review of ERO A.
Solicit verification of annual ERO training completion from the Training Department.
B. Review training completion feedback and remove any ERO members not qualified.
Quarterly EP Maintenance Items (complete Data Sheet 1 Quarterly EP Maintenance Checklist for each of the following):
________I____________
____________I____________
- 1.
Quarter 1
/
- 2.
Quarter 2
- 3.
Quarter 3
- 4.
Quarter 4 Completed by Reviewed by_
Emergency Preparedness Supervisor Plant Services Manager END OF ATTACHMENT I
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 16 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET I QUARTERLY EP MAINTENANCE CHECKLIST (Page 1 of 2)
QUARTER (YEAR_
INITIAL / DATE
- 1.
Emergency Response Facility Surveillance:
Date A.
§1 I
- 1. Monthly Communications Survey Dates: ____
B.
OSC C.
- 2.
%6 Off-Hours Augmentation Methodologies:
A.
Weekly test of automated emergency recall system (Autodialer).
Dates: _
B.
Monthly review of Emergency Response Directory.
Dates:__
I I______
C.
Quarterly verification of Emergency Response Directory Data.
D.
Quarterly verification of Distribution List for Emergency Response Directory.
E.
Quarterly publication of Emergency Response Directory.
Quarterly Integrated Facility Activation Drill Drill Date _
____I-3.
_____________I_____________
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 17 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET I QUARTERLY EP MAINTENANCE CHECKLIST (Page 2 of 2)
QUARTER
- 4.
Quarterly Off-Hours Call-Out Phone Test Drill Date
- 5.
Quarterly Self-Assessment
- 6.
Quarterly submittal of EP Performance Indicators A.
Participation B.
Drill & Exercise Performance C.
Alert & Notification System
- 7.
§5 Quarterly test of the NRC Emergency Response Data System (ERDS) link.
(YEAR)
INITIAL / DATE I____
______I_____
NOTES:
END OF DATA SHEET I
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 18 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET 2 EMERGENCY PLAN 6 YEAR ELEMENT DEMONSTRATION (Page 1 of 1)
YEAR__
Element Year Last Year Next Date Completedl Performed Scheduled Initial Off hours staffing (6 P.M. - 4 A.M.)
l Activation of Emergency News Center Use of fire control teams Use of medical support personnel Use of Security personnel for prompt access to emergency equipment or support Use of one or more portions of backup communications for notification Field monitoring Capability for determining the magnitude and impact of the particular components of a release Capability for post-accident coolant sampling and analysis Assembly and accountability Initial recovery planning activities END OF DATA SHEET 2
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 19 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET 3 EPIP BIENNIAL REVIEW (Page 1 of 2)
(YEAR)
I.
Emergency Plan Implementing Procedures (Biennial)
ReviionNo.
Date PCR lRevision No.
Reviewed Y/ N EPIP-00 Discovery and Identification of an Emergency Condition (including Chemical, Fire and Natural Emergencies)
EPIP-O Classification of Emergencies EPIP-02 Duties and Responsibilities of the Emergency Coordinator EPIP-03 Emergency Response Organization Notification/Staff Augmentation EPIP-04 Activation and Operation of the Technical Support Center EPIP-05 Activation and Operation of the Operational Support Center EPIP-06 Activation and Operation of the Emergency Operations Facility EPIP-07 Conduct of Evacuations/Assembly EPIP-08 Off-site Notifications and Protective Action Recommendations EPIP-09 Offsite Dose Calculations EPIP-10 Off-Site Radiological Monitoring EPIP-11 Core Damage Assessment EPIP-12 Maintaining Emergency Preparedness -
Radiological Emergency Plan Training EPIP-13 Maintaining Emergency Preparedness -
Emergency Exercises, Drills, Tests and Evaluations HP-90 Emergency Equipment HP-200 HP Emergency Organization HP-201 Emergency Personnel Exposure Control
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 20 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET 3 EPIP BIENNIAL REVIEW (Page 2 of 2)
(YEAR)____
Emergency Plan Implementing Procedures (Biennial) (continued) 1.
Revision No.
Date Reviewed PCR Y/N HP-202 Environmental Monitoring During Emergencies HP-203 Personnel Access Control During Emergencies HP-204 In Plant Radiation and Contamination Surveys during Emergencies HP-205 Emergency Inplant Air Sampling HP-206 Analysis of Emergency Inplant Air Samples HP-207 Monitoring Evacuated Personnel During Emergencies HP-208 Personnel Decontamination During Emergencies COP-06.06 Guidelines for Collecting Post Accident Samples COP-06.11 Establishing Remote Laboratory for Analysis of Accident Samples END OF DATA SHEET 3
REVISION NO.:
PROCEDURE TITLE:
PAGE:
7A MAINTAINING EMERGENCY PREPAREDNESS -
PROCEDURE NO.:
EMERGENCY EXERCISES, DRILLS, 21 of 21 EPIP-13 TESTS AND EVALUATIONS ST. LUCIE PLANT DATA SHEET 4 EP EXERCISE CHECKLIST (Page 1 of 1)
Exercise Items:
- 1.
Exercise Date Selection:
A.
Evaluated Date __
/
- 2.
ERO Participant Notification
- 3.
Scenario Development Personnel Assigned
- 4.
Controllers/Evaluators Assigned
- 5.
Exercise Objectives A. Plant Services Manager Approval B. Submitted to Licensing (75 Day NRC Submittal, Even years only)
- 6.
Exercise Scenario A. Provided to Florida DEM (60 Day FEMA Submittal, Even years only)
B. Submitted to Licensing (45 Day NRC Submittal, Even years only)
- 7.
Post Exercise Critique Date:-
/-/__
- 8.
Facility Review Group (FRG) Critique Report Review YEAR_
INITIAL / DATE I
______I______
_______I_____
I______
§1 END OF DATA SHEET 4