Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1)
ML033030561
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/27/2003
From: Sumner H
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-2237
Download: ML033030561 (2)


Text

H. L Sumner, Jr.

Vice President Hatch Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7279 October 27, 2003 4

SOUTHERNAE COMPANY Energy to Serve Your World' NL-03-2237 Docket Nos.:

50-321 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))

Ladies and Gentlemen:

Pursuant to 10 CFR 50.75(0(1), each power reactor licensee is required to report to the NRC the status of its decommissioning funding for each reactor or part of each reactor it owns on a calendar year basis, beginning March 31, 1999, and every two years thereafter.

Accordingly, Southern Nuclear Operating Company (Southern Nuclear) holds operating licenses DPR-7 and NPF-5 for the Edwin 1. Hatch Nuclear Plant and submitted the required information on behalf of the licensed owners (Georgia Power Company; Oglethorpe Powver Corporation; the Municipal Electric Authority of Georgia; and the City of Dalton, Georgia) by letter dated March 26, 2003. Subsequently, Southern Nuclear received a request for additional information from the NRC on September 10, 2003.

The enclosed letter from each of the licensed owners restates the NRC request for additional information and provides the requested information for the Edwin l. Hatch Nuclear Plant. This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely,

11. L. Sumner, Jr.

HLS/FWS/sdl

Enclosures:

1. Georgia Power Company letter dated October 15, 2003
2. Municipal Electric Authority of Georgia letter dated October 3, 2003
3. Oglethorpe Power Corporation letter dated October 8, 2003
4. City of Dalton, Georgia letter dated October 16, 2003

,4oo)

U. S. Nuclear Regulatory Commission NL-03-2237 Page 2 cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Ms. K. S. King, Vice President and CFO Mr. G. R. Frederick, General Manager - Plant Hatch Document Services RTYPE: CHAO2.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. S. D. Bloom, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch Georgia Power Company Mr. C. B. Harreld, Executive Vice President and CFO Municipal Electric Authority of Georgia Mr. J. E. Fuller, Senior Vice President and CFO Oglethorpe Power Corporation Ms. A. F. Appleby, Vice President - Finance City of Dalton. Georgia Mr. D. Cope, President and CEO