L-04-123, (Bvps), Unit No. 1 and No. 2, Revision to Draft BVPS Physical Security Plan Submitted April 28, 2004
| ML042590529 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/09/2004 |
| From: | Pearce L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-04-123 | |
| Download: ML042590529 (2) | |
Text
F8NOC SAFEGUARDS INFORMATION Beaver Valley Power Station Route 168 RO. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077-0004 L. William Pearce 724-682-5234 Site Vice President Fax: 724-643-8069 September 9, 2004 L-04-123 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station (BVPS), Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Revision to Draft BVPS Physical Security Plan submitted April 28, 2004 The NRC issued an Order dated April 29, 2003, Requiring Compliance with Revised Design Basis Threat ("Order EA-03-086" or "Order") and other security related Orders for Beaver Valley Power Station (BVPS), Units 1 and 2.
On April 28, 2004, the FirstEnergy Nuclear Operating Company (FENOC) provided a supplement (L-04-043) to the previously submitted responses to Order EA-03-086 for BVPS.
Included in that submittal was a proposed draft revision to the BVPS Physical Security Plan (PSP) as required by the Order.
The review of the draft BVPS PSP by the NRC staff resulted in several Requests for Additional Information (RAIs). The proposed revision to the BVPS Physical Security Plan has now been modified to incorporate changes based on the resolution of the RAI issues and is enclosed with this letter.
In accordance with 10 CFR 73.21, the enclosure to this document has been determined to contain Safeguards Information, and is thereby exempt from public disclosure.
There are no regulatory commitments contained in this letter. If there are any questions concerning this matter, please contact Mr. Kenneth E. Halliday, Manager Site Protection at 724-682-5072.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 9, 2004.
Sincerely, d.W.
C 6t
. William Pearce SAFEGUARDS INFORMATION ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED.
Beaver Valley Power Station, Unit No. I and No. 2 Revision to Draft BVPS Physical Security Plan Submitted April 28, 2004 L-04-123 Page 2 SAFEGUARDS INFORMATION Enclosure c:
Mr. T. G. Colburn, NRR Senior Project Manager (w/o enclosure)
Mr. P. C. Cataldo, NRC Sr. Resident Inspector (w/o enclosure)
Mr. S. J. Collins, NRC Region I Administrator Ms. D. W. Spaulding, NRC Project Manager, Security Plan Review Team (2 copies)
SAFEGUARDS INFORMATION ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLED.