Clarification of 60-Day Response to Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors
ML043210174
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/09/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-04-001
Download: ML043210174 (2)


Text

NM C Palisades Nuclear Plant Committed to Nuclear Excellence Operated by Nuclear Management Company, LLC November 9, 2004 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852 Palisades Nuclear Power Plant Docket 50-255 License No. DPR-20 Clarification of 60-Day Response to Bulletin 2004-01. "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors" By letter dated July 26, 2004, Nuclear Management Company, LLC (NMC) provided the 60-day response to Bulletin 2004-01. By teleconference on October 18, 2004, the NRC staff requested a clarification to the following commitment:

NMC will perform bare metal visual inspections of all Alloy 82/182/600 primary system pressure boundary locations normally operated at greater than or equal to 350'F within the next two refueling outages for the Palisades Nuclear Plant.

NMC is providing the following clarification to the above commitment:

NVNMC will perform bare metal visual inspections of all Alloy 82/182/600 primary system pressure boundary locations normally operated at greater than or equal to 350F within the next two refueling outages for the Palisades Nuclear Plant. NMC will then reevaluate the inspection program for the Palisades Nuclear Plant to determine the appropriate frequency for each Alloy 8211821600 location.

27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000

Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and one revised commitment.

  • NMC will perform bare metal visual inspections of all Alloy 82/182/600 primary system pressure boundary locations normally operated at greater than or equal to 350'F within the next two refueling outages for the Palisades Nuclear Plant. NMC will then reevaluate the inspection program for the Palisades Nuclear Plant to determine the appropriate frequency for each Alloy 82/182/600 location.

I declare under penalty of perjury that the foregoing is true and correct. Executed on November 9, 2004.

74; Daniel J.

alone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC