ML051940154

From kanterella
Revision as of 17:27, 15 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Technical Specifications, Revise Containment Air Lock Leak Rate Test Acceptance Criteria
ML051940154
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/12/2005
From:
NRC/NRR/DLPM
To:
Vaidya BK, DLPM/LPDIV-1, 301-415-3308
Shared Package
ML051960574 List:
References
TAC MC5539
Download: ML051940154 (1)


Text

Primary Containment Air Locks 3.6.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 4

SR 3.6.1.2.1


NOTES------------------

1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria of SR 3.6.1.1.1 in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.

Perform required primary containment air lock leakage rate testing in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.

The acceptance criteria for air lock testing are:

a. Overall air lock leakage rate is
  • 0.05 La when tested at 2 Pa.
b. For each door, leakage rate is s 0.01 La when the gap between the door seals is pressurized to 2 Pa.

In accordance with 10 CFR 50, Appendix J, Testing Program SR 3.6.1.2.2 Verify primary containment air lock seal 7 days air flask pressure is 2 90 psig.

(continued) 168 Amendment No. 413 GRAND GULF 3.6-7