ML080940673

From kanterella
Revision as of 17:22, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
No Comments on NRC Written Examination
ML080940673
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/03/2008
From: Langley D
Tennessee Valley Authority
To: Mccree V
Region 2 Administrator
References
NUREG-1021
Download: ML080940673 (3)


Text

April 3, 2008 Mr. Victor M. McCree Regional Administrator Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931

Dear Sir:

In the Matter of )

Docket Nos. 50-259 Tennessee Valley Authority )

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - Units 1, 2, AND 3 - NO COMMENTS ON NRC WRITTEN EXAMINATION This letter is submitted in accordance with the NRC Operator Licensing Examiner Standards (NUREG-1021), Examiner Standard (ES)-402, Attachment 3, Step 4. That step states that the Licensee submit any formal comments within 5 working days after the administration of the examination.

Based on our review and the grading of the written examination administered on March 25, 2008, TVA does not have any comments.

If you have any questions, please telephone Mr. Bob Scillian at (256) 729-3439.

Sincerely, Original signed by:

D. T. Langley Manager of Site Licensing and Industry Affairs cc: Page 2

Mr. Victor M. McCree Page 2 April 3, 2008

Enclosure:

Cc (Enclosure):

(Via NRC Electronic Distribution)

Ms. Nancy L. Salgado, Chief, Operator Licensing Branch Mail Stop: OWFN 6D-17 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Chief Operator Licensing and Human Performance Branch U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Chief Operator Licensing and Human Performance Branch Division of Reactor Safety, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Ms. Rebecca L. Nease, Branch Chief, U.S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street S.W., Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739

Mr. Victor M. McCree Page 3 April 3, 2008 JEE:JWD:BAB cc: R. L. Coleman, BFT 3A-BFN T. D. Elms, POB 2E-BFN E. R. Scillian, BFT 1A-BFN EDMS-WT CA-K S:lic/submit/operator/no comments on exam 0308.doc.