L-09-094, Transmittal of Perry Nuclear Power Plant, Annual Environmental and Effluent Release Report for Period of January 1, 2008 Through December 31, 2008

From kanterella
Revision as of 12:01, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Perry Nuclear Power Plant, Annual Environmental and Effluent Release Report for Period of January 1, 2008 Through December 31, 2008
ML091260217
Person / Time
Site: Perry 
Issue date: 04/24/2009
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-09-094
Download: ML091260217 (1)


Text

FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Mark B. Bezilla Vice President 440-280-5382 Fax: 440-280-8029 10 CFR 50.36a(a)(2)

April 24, 2009 L-09-094 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440 Annual Environmental and Effluent Release Report Enclosed is the Annual Environmental and Effluent Release Report for the Perry Nuclear Power Plant (PNPP) for the period of January 1, 2008 through December 31, 2008. This document includes the radiological environmental operating report, radioactive effluent release report, and the non-radiological environmental operating report which satisfies the requirements of the PNPP Technical Specifications (TS), the PNPP Offsite Dose Calculation Manual (ODCM), and the Environmental Protection Plan, Appendix B of the PNPP Operating License. Revision 17 of the ODCM is also enclosed in accordance with TS 5.5.1.c.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas Veitch, Manager-Chemistry at (440) 280-5174.

Sincerely, Mark B. Bezilla

/

Enclosures:

A. PNPP 2008 Annual Environmental and Effluent Release Report B. Offsite Dose Calculation Manual, Revision 17 cc:

NRC Region III Administrator NRC Resident Inspector NRR Project Manager