L-10-146, Physical Security Plan (Revision 8)

From kanterella
Revision as of 04:42, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Physical Security Plan (Revision 8)
ML101530566
Person / Time
Site: Beaver Valley
Issue date: 05/27/2010
From: Harden P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-10-146
Download: ML101530566 (2)


Text

FENOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Paul A. Harden Site Vice President 724-682-5234 Fax: 724-643-8069 May 27, 2010 L-10-146 10 CFR 50.54(p)(2)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station Physical Security Plan (Revision 8)

This letter forwards Revision 8 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) to reflect implementation of the revised requirements in 10 CFR Part 73.55, which were effective on March 31, 2010. The PSP was issued in its entirety and is consistent, except as noted in Attachment A, with the guidance provided in NEI 03-12, Revision 6, "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program]" which was endorsed by NRC letter dated April 9, 2009.

The changes were reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2).

The enclosed revision of the BVPS Physical Security Plan is Safeguards Information and must be withheld from disclosure under the provisions of 10 CFR 73.21.

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled

<ýý 0c) ý Ua

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled Beaver Valley Power Station, Unit Nos. 1 and 2 L-10-146 Page 2 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel L. Craine, Manager -

Site Protection, at (724) 682-7812.

Sil Paul A.

Attachment:

Summary of Differences from-NEI 03-12, Revision 6

Enclosure:

BVPS Physical Security Plan, Revision 8, cc:

NRC Region I Administrator NRC Resident Inspector (w/o enclosure)

NRR Project Manager (w/o enclosure)

Director BRP/DEP (w/o enclosure)

Site BRP/DEP Representative (w/o enclosure)

SAFEGUARDS INFORMATION When Separated From Enclosure, Handle This Document As Decontrolled