NLS2010071, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Revision as of 03:37, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML102150539
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/28/2010
From: Vanderkamp D
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2010071
Download: ML102150539 (3)


Text

N Nebraska Public Power District Always there when you need us NLS2010071 July 28, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Preparation and Scheduling of Operator Licensing Examinations Cooper Nuclear Station, Docket No. 50-298, DPR-46 Nuclear Regulatory Commission Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

Dear Sir or Madam:

The purpose of this letter is to transmit to the U.S. Nuclear Regulatory Commission (NRC) a completed NRC Form 536 for Cooper Nuclear Station as requested in the reference above.

Should you have any questions or require additional information, please contact me at (402) 825-2904 or David Werner, Operations Training Superintendent, at (402) 825-5751.

Sincerely, David W. Van Der Kamp Licensing Manager

/jo Attachment cc:

Regional Administrator w/attachment USNRC - Region IV Operations Training Superintendent w/attachment Cooper Nuclear Station Training Manager w/o attachment Cooper Nuclear Station CNS Records w/attachment COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com V005 KAR4

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©4 Correspondence Number:

NLS2010071 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None

4.

4 4-4

4.

4 1-4 PROCEDURE 0.42 REVISION 24 PAGE 18 OF 25

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T_-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Cooper Nuclear Station IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2 0 13 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 20 13 Cy 2014 Cy 2015 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 6

0 3

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 10/22/2012 07/28/2014 ALTERNATE DATE 10/29/2012 08/04/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 12 0

0 0

CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER