ML102590207

From kanterella
Revision as of 02:54, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals
ML102590207
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/16/2010
From: Justin Poole
Watts Bar Special Projects Branch
To: Shawn Campbell
Watts Bar Special Projects Branch
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
Download: ML102590207 (4)


Text

September 16, 2010 MEMORANDUM TO:

Stephen J. Campbell, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing FROM:

Justin C. Poole, Project Manager /RA/

Watts Bar Special Projects Branch Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)

DATE & TIME:

Tuesday, September 28, 2010 9:00 a.m. - 3:30 p.m.

PURPOSE:

To discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

One White Flint North Room O8-B06 11555 Rockville Pike, Rockville, Maryland CATEGORY 1:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Proprietary information may be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). TVA licensing staff will be participating.

NRC TVA S. Campbell, NRR J. Poole, NRR W. Crouch et al.

L. Raghavan, NRR et al.

J. Wiebe, NRR P. Milano, NRR Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@ (67 FR 36920), May 28, 2002.

S. Campbell Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before September 24, 2010, 2:30 p.m. (Eastern Daylight Time) to get the telephone number and the pass code.

MEETING CONTACTS:

Justin Poole, NRR Patrick Milano, NRR 301-415-2048 301-415-1457 Justin.Poole@nrc.gov Patrick.Milano@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket No. 50-391

Enclosure:

Agenda cc w/encl: Distribution via Listserv

ML102590207 via email OFFICE DORL/LPWB/PM DORL/LPWB/LA DORL/LPWB/BC NAME JPoole BClayton SCampbell DATE 9/ 16 /10 9/ 16 /10 9/ 16 /10

AGENDA U.S. NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH TENNESSEE VALLEY AUTHORITY WATTS BAR UNIT 2 FINAL SAFETY ANALYSIS REPORT SUBMITTALS September 28, 2010 9:00 a.m. - 9:30 a.m.

Introductions (NRC) 9:30 a.m. - 12:00 p.m.

Discussions on the Final Safety Analysis Report Submittals 12:00 p.m. - 1:00 p.m.

Break for Lunch 1:00 p.m. - 3:00 p.m.

Discussions on the Final Safety Analysis Report Submittals 3:00 p.m. - 3:30 p.m.

Public Comments Enclosure