ML12072A033

From kanterella
Revision as of 03:31, 12 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
3/28/2012 - Notice of Meeting with Boiling Water Reactor (BWR) Owners Group (Bwrog) Regarding BWR Emergency Core Cooling System (ECCS) Suction Strainer Issues
ML12072A033
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 03/14/2012
From: Joe Golla
Licensing Processes Branch (DPR)
To: John Jolicoeur
Licensing Processes Branch (DPR)
Golla J
References
ML12072A033
Download: ML12072A033 (6)


Text

March 14, 2012 MEMORANDUM TO:

John R. Jolicoeur, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Joseph A. Golla, Project Manager

/RA/

Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH BOILING WATER REACTOR (BWR) OWNERS GROUP (BWROG) REGARDING BWR EMERGENCY CORE COOLING SYSTEM (ECCS) SUCTION STRAINER ISSUES DATE & TIME:

Wednesday, March 28, 2012 9:00 a.m. - 5:00 p.m.

LOCATION:

Hilton Rockville Hotel (Roosevelt Room) 1750 Rockville Pike (Adjacent to the Twinbrook Metro stop)

Rockville, MD 20852 PURPOSE:

The purpose of this meeting is for the BWROG and U.S. Nuclear Regulatory Commission (NRC) staff to discuss ongoing BWR ECCS suction strainer issues.

CATEGORY 2*:

This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

MEETING CONTACT:

Joseph A. Golla (301) 415-1002 Joe.Golla@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), May 28, 2002

J. Jolicoeur NOTE:

Seating may be limited and will be available on a first-come basis.

Inform the NRCs meeting contact of your intention to attend by March 26, 2012. This step will ensure that sufficient copies of meeting materials are available. If you need a reasonable accommodation to participate in this meeting (e.g., a translator, handicapped accessibility) or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print, a language other than English), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodations will be made on a case-by-case basis. Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances such as severe weather, confirm the meeting schedule with the meeting contact.

REFERENCE DOCUMENTS:

1. BWROG ECCS Suction Strainer BWR Downstream Effects Bypass Test Plan (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11335A262)
2. Feedback on BWROG-11060, BWROG [Boiling Water Reactor (BWR) Owners Group] ECCS [emergency core cooling system]

Suction Strainers Bypass Test Plan (ADAMS Accession No. ML12017A158)

3. BWROG ECCS Suction Strainer Chemical Effects Resolution Strategy Plan and Flowchart (ADAMS Accession No. ML11335A264)
4. Feedback on BWROG-11061, BWROG [Boiling Water Reactor (BWR) Owners Group] [emergency core cooling system] Suction Strainers Chemical Effects Strategy Outline (ADAMS Accession No. ML12013A159)

The above documents will be the subject of much of the meeting discussions.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC BWROG Steward Bailey Steve Scammon (Energy NW)

Stephen Smith Tony Borger (PPL)

Paul Klein Dan Fouts (Entergy)

Matt Yoder Larry Fleischer (GEH)

Ervin Geiger Ed Asbury (GEH), et al.

Joseph Golla, et al.

Project No. 691

Enclosure:

Agenda

ML12072A033 NRC-001 OFFICE PLPB/PM PLPB/LA PLPB/BC NAME JGolla DBaxley JJolicoeur DATE 03/14/2012 03/13/2012 03/14/2012 cc w/encl:

BWROG Chairman BWROG ECCS Suction Strainers Frederick P. Schiffley Committee Chairman Exelon Generation Co., LLC Steve Scammon Cornerstone II at Cantera slscammon@energy-northwest.com 4300 Winfield Road Warrenville, IL 60555 frederick.schiffley@exeloncorp.com BWROG Vice Chairman Michael H. Crowthers PPL Susquehanna, LLC 2 North Ninth Street Allentown, PA 18101-1179 mhcrowthers@pplweb.com BWROG Project Manager Ed Asbury GE-Hitachi Nuclear Energy PO Box 780 M/C F-12 3901 Castle Hayne Road Wilmington, NC 28402 Ed.Asbury@ge.com BWROG Program Manager Craig J. Nichols GE-Hitachi Nuclear Energy PO Box 780 M/C F-12 3901 Castle Hayne Road Wilmington, NC 28402 craig.nichols@ge.com GEH Senior Vice President Jerald G. Head Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy PO Box 780 M/C A-18 Wilmington, NC 28401 jerald.head@ge.com

ENCLOSURE AGENDA UNITED STATES NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH THE BOILING WATER REACTOR (BWR) OWNERS GROUP (BWROG)

REGARDING BOILING WATER REACTOR EMERGENCY CORE COOLING SYSTEM (ECCS) SUCTION STRAINER ISSUES MARCH 28, 2012 Time Topics Lead 9:00 a.m.

Introductions and Opening Remarks NRC/BWROG 9:15 a.m.

Overall Project Schedule Update BWROG 9:45 a.m.

Discussion of Reduction of Insulation NRC/BWROG Damage Pressure Issue 10:15 a.m.

Break 10:30 a.m.

Discussion of Staff Feedback on ECCS NRC/BWROG Suction Strainers Bypass Test Plan 11:50 a.m.

Opportunity for Public Comment NRC 12:00 p.m.

Lunch 1:00 p.m.

Discussion of Staff Feedback on ECCS NRC/BWROG Suction Strainers Bypass Test Plan 2:00 p.m.

Discussion of Staff Feedback on ECCS NRC/BWROG Suction Strainers Chemical Effects Strategy Outline 2:45 p.m.

Break 3:00 p.m.

Discussion of Staff Feedback on ECCS NRC/BWROG Suction Strainers Chemical Effects Strategy Outline 4:40 p.m.

Wrap Up NRC/BWROG 4:50 p.m.

Opportunity for Public Comment NRC 5:00 p.m.

Adjourn