(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Other |
|---|
|
Results
Other: L-2012-385, Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2013-084, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2013-192, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049), L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), L-2014-063, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049), L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, L-2015-214, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049), L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan, ML15071A265
|
MONTHYEARL-2012-385, Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2012-10-25025 October 2012 Florida Power & Light (Fpl)S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2013-084, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2013-192, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)2013-06-18018 June 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) Project stage: Other L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-28028 August 2013 First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other L-2014-008, Environmental Protection Plan Report, December 27, 2013, Unusual or Important Environmental Event - Turtle Mortality2014-01-0808 January 2014 Environmental Protection Plan Report, December 27, 2013, Unusual or Important Environmental Event - Turtle Mortality Project stage: Request L-2014-063, Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2014-02-26026 February 2014 Second Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) Project stage: Other L-2014-274, Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2014-08-27027 August 2014 Third Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other ML15071A2652015-02-23023 February 2015 Fourth Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML15083A2642015-03-10010 March 2015 Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report Project stage: Request L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2015-08-20020 August 2015 Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other L-2015-214, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-25025 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 12015-11-12012 November 2015 St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-663, Rev. 10, Sheet 1 Project stage: Request L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan Project stage: Other ML16096A3382016-03-21021 March 2016 Revised FLEX Final Integrated Plan Project stage: Request ML16167A4732016-07-0505 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-11-12
[Table View] |
Text
October 25, 2012 L-2012-385 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Florida Power & Li-ght (FPL)'s Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitiqation Strate-gies for Beyond-Design-Basis External Events (Order Number EA-1 2-049)
References:
- 1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ML12054A736)
- 2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 30, 2012 (ML12229A174)
- 3. Nuclear Energy Institute (NEI) Letter to NRC, Industry Initiative on Procurement of Equipment for the Diverse and Flexible Coping Strategy (FLEX), dated February 24, 2012 (ML12061A023)
- 4. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, dated August 2012 On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to FPL. Reference 1 was immediately effective and directs FPL to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 30, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2.
This report confirms FPL has received Reference 2 and is in the process of evaluating the guidance for the purpose of establishing mitigation strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event as described in Attachment 2 of Reference 1.
Major activities completed during this reporting period:
- Additional portable equipment was ordered prior to the issuance of Reference 2, as described in an NEI letter to the NRC (Reference 3).
Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 41L(IQ
St. Lucie Units 1 and 2 L-2012-385 Docket Nos. 50-335 and 50-389 Page 2
" A site-specific evaluation is in progress to establish the coping capabilities as defined in NEI 12-06 (Reference 4).
" Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.
Planned activities for the next six months:
0 Development and submittal of the overall integrated plan.
Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:
None at this time.
Project milestones schedule through completion of installation and testing:
A project milestones schedule will be provided with the overall integrated plan.
" Implementation of the order will be completed for St. Lucie Unit 1 prior to startup from Refueling Outage (RFO) SL1-26 Spring 2015.
" Implementation of the order will be completed for St. Lucie Unit 2 prior to startup from Refueling Outage (RFO) SL2-22 Fall 2015.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Eric S. Katzman, Licensing Manager at (772) 467-7748.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October,ý:", 2012.
Respectfull ',submitted, Site Vice President St. Lucie Plant cc:
Eric J. Leeds, Director, Office of Nuclear Reactor Regulation Victor McCree, NRC Regional Administrator Tim Hoeg, NRC Resident Inspector Trace Orf, NRC Licensing Project Manager Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. Eric E. Bowman, NRR/DPR/PGCB, NRC or Ms. Eileen M. Mckenna, NRO/DSRA/BPTS, NRC