On-Shift Staffing Analysis Supplement
ML13037A052
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/05/2013
From: Pierce C
Southern Nuclear Operating Co, Southern Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-13-0187
Download: ML13037A052 (2)


Text

Charles R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Pos t Offic e Box 1295 Birm ingham. Ala bama 3520 1 Tel 205.992.7872 Fax 205.992.7601 February 5, 2013 Docket Nos.: 50-321 50-366 SOUTHERN'\\

COMPANY NL-13-0187 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant On-Shift Staffing Analysis Supplement

Reference:

1. Southern Nuclear Operating Company letter to the NRC, Edwin I. Hatch Nuclear Plant On-Shift Staffing Analysis, dated January 18, 2013 (NL-13-0065)

Ladies and Gentlemen:

By letter dated January 18, 2013, Southern Nuclear Operating Company (SNC) submitted Reference 1 to the Nuclear Regulatory Commission (NRC). After submitting, it was discovered that Reference 1 contained inaccurate information.

As part of the on-shift staffing analysis summary, Reference 1 stated that compensatory measures had been put in place to address a conflict with performance of NRC and other site event notifications by the Shift Manager. As discussed in a phone conversation on January 24, 2013, between Mr. Ken McElroy of SNC and Mr. Robert E. Martin of the NRC, SNC determined that the compensatory measures were not in place until January 22, 2013.

A review of the on-shift staff between the dates required for compensatory measures to be in place (January 19, 2013) and when compensatory measures were actually put in place (January 22, 2013) show that Edwin I. Hatch Nuclear Plant had adequate staffing to meet the intent of the compensatory action with the exception of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> total.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, Cli. fL-C. R. Pierce Regulatory Affairs Director CRP/CLNllac

U.

Nuclear Regulatory Commission NL-13-01 Page 2 cc: Southern Nuclear Operating Company Mr.

Kuczynski, Chairman, President &

Mr.

G.

President & Chief Nuclear Officer Mr.

R. Madison, Vice President - Hatch Mr. B. L. lvey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President Fleet Operations CHA02.004 Mr. V. M. McCree, Regional Administrator Mr. R.

Martin, NRR Senior Project Manager - Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch