ML15126A199

From kanterella
Revision as of 12:12, 10 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2014 Prairie Island Nuclear Generating Plant Initial License Examination Proposed Examination Transmittal Letter
ML15126A199
Person / Time
Site: Prairie Island  
Issue date: 05/19/2014
From: Davison K
Northern States Power Co, Xcel Energy
To:
Region 3 Administrator
References
L-Pl-14-055, NUREG-1021
Download: ML15126A199 (2)


Text

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

fl Xcel Energy Regional Administrator, Region Ill U S Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 L-Pl-14-055 NUREG-1021 Prairie Island Nuclear Generating Plant (PINGP) Initial Operator Licensing Examination Materials

Reference:

1. Nuclear Regulatory Commission (NRG) letter to Mr. Kevin Davision, "Prairie Island Nuclear Generating Plant, Units 1 and 2, Confirmation of Initial License Examination," dated January 23, 2014, Accession Number ML14024A077.

In response to Reference 1, Northern States Power Company, a Minnesota Corporation (NSPM), submits the written examinations, operating tests, and supporting reference materials (Enclosure 1) for the initial operator licensing examinations to be administered at PINGP the weeks of August 4 and August 11, 2014. This information is provided in accordance with guideline ES-201 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

NUREG-1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examinations are complete.

1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388.1121 JUN - 5 2014

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Page2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

) £<,_*~*

Kev~ison Site Vice President, Prairie Island Nuclear Generating Plant Units 1 and 2 Northern States Power Company - Minnesota Enclosure cc:

Mike Bielby, US NRC Region Ill, with enclosure Hironori Peterson, US NRC Region Ill, without enclosure