ML15301A094

From kanterella
Revision as of 06:50, 10 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request
ML15301A094
Person / Time
Site: Monticello 
Issue date: 12/07/2015
From: Beltz T
Plant Licensing Branch III
To: Gardner P
Northern States Power Co, Xcel Energy
Beltz T
References
CAC MF5002
Download: ML15301A094 (4)


Text

Mr. Peter A. Gardner Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 7, 2015 Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (CAC NO. MF5002)

Dear Mr. Gardner:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated September 29, 2015 (Agencywide Documents Access and Management System (ADAMS) Package Accession No ML15274A484), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, submitted a license amendment request (LAR) application to revise the technical specifications and approve certain analytical methods to support operation in the expanded power-flow operating domain described as the Extended Flow Window (EFW) at the Monticello Nuclear Generating Plant (MNGP). (located at ADAMS Accession No. ML15274A476) of the September 29, 2015, submittal, included two AREVA affidavits executed by Alan B. Meginnis, Manager of Product Licensing, for AREVA Inc., requesting that information designated proprietary in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.

  • provides a proprietary version of AREVA report ANP-3435P, Revision 0, "AREVA Responses to RAl-8 and RAl-32 from SRXB and SNPB on MNGP EFW LAR,"

dated August 2015. The associated affidavit was executed on August 31, 2015.

  • provides a proprietary version of AREVA report ANP-3424P, Revision 1, "AREVA Responses to RAI from SCVB on MNGP EFW LAR," dated August 2015. The associated affidavit was executed on August 20, 2015.

The affidavits state that the information submitted in Enclosures 5 and 7 should be considered exempt from mandatory public disclosure for the following reasons:

a. Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
b. The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
c. The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA.

We have reviewed the AREVA affidavits in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal contains proprietary commercial information and should be withheld from public disclosure. Therefore, Enclosures 5 and 7, which are marked as proprietary, will be withheld from public disclosure pursuant to 1 O CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Enclosures 6 and 8 contain non-proprietary versions of Enclosure 5 and 7, respectively, and have been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession Nos. ML15274A475 and ML15274A476.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-3049.

Docket No. 50-263 cc:

Mr. Alan B. Meginnis, Manager Product Licensing AREVA Inc.

2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv Sincerely, Aw ;Y..il for Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

ML15301A094 OFFICE DORL/LPLlll-1/PM DORL/LPLlll-1/LA DSS/SRXB/BC NAME TBeltz MHenderson CJackson DATE 10/28/2015 10/29/2015 11/30/2015 OFFICE DSS/SCVB/BC DORL/LPLlll-1/BC DORL/LPLlll-1/PM NAME RDennig DPelton (ADietrich for) TBeltz DATE 12/03/2015 12/07/2015 12/07/2015