Preparation and Scheduling of Operator Licensing Examinations
ML16188A196
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 06/30/2016
From: Mark D. Sartain
Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation, NRC Region 1, NRC/RGN-II
References
16-256
Download: ML16188A196 (6)


Text

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 June 30, 2016 Serial No.:

16-256 NLOS/vlh Docket Nos.: 50-336/423 50-338/339 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1AND2 NRC REGULATORY ISSUE

SUMMARY

2016-09 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2016-09, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.

Very truly yours,

~-

Mark D. Sartain Vice President - Nuclear Engineering Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company

Enclosures:

NRC Form 536 for Millstone, North Anna and Surry Power Stations cc:

U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U.S. Nuclear Regulatory Commission Region II (Zc,..µo I

((.,(ril Ol->

Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200

,J;e-4~

J Atlanta, Georgia 30303-1257 Ji/ l'lfJ- / (<l:rU - I

~ (l&IJ,,,/}

'w Mr. Richard Guzman U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Karen Cotton Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station SN 16-256 Scheduling of Operator Licensing Examinations Page 2 of 2

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~p.'f"AEO&(

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~Ci information collection is used to plan budgets and resources for operator examinations.

Send tc.:f OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5

~

~

~

EXAMINATION DATA F53}, U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to c

lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~

~

~+"')

-+o~

NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Millstone Power Station Unit 2 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 NUMBER OF REACTOR 7

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 5

0

'3 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 09110118 NIA 09114120 NIA ALTERNATE DATE 09/17/18 NIA 09121120 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 12 0

0 0

CANDIDATES NRC FORM 536 (05-2016)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: !'-JO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~Jt.RAEo11(

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~~<:i

">o OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send (Q

.,.~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5

!1 g

~

EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~

~

lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~"

~

NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information colleetion.

FACILITY NRC REGION Millstone Power Station Unit 3 I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-UPGRADE NUMBER Of SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA 09109119 NIA 09/13121 ALTERNATE DATE NIA 09/16119 NIA 09120121

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0

0 9

0 CANDIDATES NRC FORM 536 (05-2016)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~~fl.AEO&c Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.::,V

'I>

information collection is used to plan budgets and resources for operator examinations.

Send o,,.

OPERA TOR LICENSING

~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 0

F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~

r:/:

EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

""'~

d'~

NEOB-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503.

If a means

"......... ~

used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION North Anna Power Station Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 I

0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 NUMBER OF REACTOR 10 0

10 0

OPERATORS NUMBER OF SENIOR REACTOR 5

0 3

0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 6111/18-6122118 NIA 618120-6119120 NIA ALTERNATE DATE 6118118-6129118 NIA 6115120-6126120 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 15 0

0 0

CANDIDATES NRC FORM 536 (05-2016)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

~"'RREo&(

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.:,(j Information collection is used to plan budgets and resources for operator examinations.

Send

l-*

OPERA TOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5

~

, c EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington. DC2055!"r000t. or by e-mail to

~

~

lnfocollects.Resource@nrc.gov, and to the Desk Officer. Office of Information and Regulatory Affairs,

~""'..,

~o~

NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number. the NRG may not conduct or sponsor. and a person is not required to respond to. the information collection.

FACILITY NRC REGION Surry Power Station Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 NUMBER OF REACTOR 0

12 0

12 OPERATORS NUMBER OF SENIOR REACTOR 0

5 0

5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA 4/22/19 NIA 3122121 ALTERNATE DATE NIA 4129/19 NIA 3/30121

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0

17 0

0 CANDIDATES NRG FORM 536 (05-2016)