Forwards Insp Repts 50-237/98-13 & 50-249/98-13 on 980318 & NOV Re Failure to Ensure That Design Basis Was Correctly Translated Into Procedures,Such That Procedures Allow Simultaneous Opening of Torus Ventilation Valves
ML17191A617
Person / Time
Site: Dresden  
Issue date: 04/16/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML17191A618 List:
References
50-237-98-13, 50-249-98-13, EA-97-546, NUDOCS 9804270385
Download: ML17191A617 (4)


See also: IR 05000237/1998013

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West 111

1400 Opus Place, Suite 500

Downers Grove, IL 60515

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

April 16, 1998

SUBJECT:

NRC INSPECTION REPORT NO. 50-237/98013(DRP);

50-249/98013(DRP) AND NOTICE OF VIOLATION

Dear Mr. Kingsley:

On March 18, 1998, the NRC and Commonwealth Edison staffs met in a pre-decisional

enforcement conference about simultaneously inerting or deinerting the drywell and torus spaces

at the Dresden Nuclear Power Station. These activities were discussed in Inspection Reports

No. 50-237/97006; 50-249/97006; and 50-237/98006; 50-249/98006.

Based on the discussions at this meeting, the NRC determined that violations of NRC

requirements occurred. The violations are cited in the enclosed Notice of Violation (Notice), and

the circumstances surrounding the violations are described in the subject inspection report. Due

to the limited safety significance, these violations have been classified as Severity Level IV in

accordance with Nureg 1600, "General Statement of Policy and Proced1.i"res for NRC

Enforcement Action (Enforcement Policy)." These violations are a concern because NRC

involvement was necessary to obtain prompt and thorough resolution of the issue. The first

violation involved a failure to ensure that the design basis was correctly translated into

procedures, such that procedures allowed simultaneous opening of drywall and torus ventilation

valves. This resulted in bypassing the pressure suppression function of the containment system.

Because your corrective actions, as delineated in Licensee Event Report 50-237/97-011 1

eliminated the use of this practice, no response to this violation is required.

The second violation involved the failure to promptly identify and correct the conditions which

allowed bypass of the pressure suppression function following notification of the issue by the

LaSalle Station and by NRC inspectors. Failing to correct this condition resulted in a situation

where plant operators would have bypassed the pressure suppression function if NRC inspectors

had not intervened. You are requested to respond to this violation with the actions taken to

prevent recurrence.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

9804270385 980416

PDR

ADOCK 05000237

G

PDR

0. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Docket Nos.: 50-237; 50-249

License Nos.: DPR-19; DPR".'25

Enclosures:

1.

2.

Notice of Violation

Inspection Report

ivision of Reactor Projects

No. 50-237/98013(DRP)';

50-249/98013(DRP)

cc w/encls:

M. Wallace, Senior Vice President

D. *Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President

P. Swafford, Station Manager

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss,* Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

0. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos.: 50-237; 50-249

License Nos.: DPR-19; DPR-25

Enclosures:

1.

Notice of Violation

Inspection Report

2.

Nos. 50-237/98013(DRP);

50-249/98013(DRP)

cc w/encls:

M. Wallace, Senior Vice President

D. Helwig, Senior Vice *President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President

P. Swafford, Station Manager

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

  • State Liaison Officer

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:\\dres\\dre98013.drp

To receive a copy of thla document, Indicate In the box *c* = Copy without attachment/ancloaura "E" = Copy with attachment/enclosure

"N" =No co .

OFFICE

l

Riii

NAME

Rlerch:nmo

DATE.

04/IG/98

0. Kingsley

Distribution

  • J. Lieberman, OE w/encls

J. Goldberg, OGC w/encls

B. Boger, NRR w/encls

SAR (E-Mail)

Project Mgr., NRR w/encls

A. Beach w/encls

J. Caldwell w/encls

B. Clayton w/encls

SRI Dresden w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Riii PRR w/encls

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

-3-