ML17193A028
| ML17193A028 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/02/1980 |
| From: | Abel J COMMONWEALTH EDISON CO. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009120453 | |
| Download: ML17193A028 (1) | |
Text
~;-
e eo Commonwealth Edison 72 West Adams Street, Chicago, Illinois
- Address Reply to: Post Office Box 767 Chicago, Illinois 60690 September 2, 1980 Mr. Dennis M. Crutchfield Chief,. Operating Reactors Branch #5 Division of Licensing U..
- S. Nuclear Regulatory Commission Washington, :-rr~-- C. -20555
Reference:
J. S. Abel letter to D. M.. Crutchfield dated 8/22/80.
Dear Mr. Crutchfield:
The referenced letter described the additional review which Commonwealth Edison Company (CECo.. ) desired concerning an impending study of people related problems in nuclear safeguards.
The study is to be conducted by Mr. Frank Brittell.. CECo. has received further inform-ation from Mr. Brittell addressing the areas of interest.
At the present time, CECo. is in the process of implementing the new security requirements. of 10 CFR 73.55 at Dresden Station.
The changes from prior practice are extensive and the guard force is totally.occupied with the problems*of change as well as the normal routine, much of which is new.
As a result, CECo. does not wish: to participate in the proposed study at. this* time.
Until CECo. management a.ni the contractor guard force have gained experience with the new system, r~sponses to the*
study's questions would be misleading, reflecting inexperience and short term problems.
Participation in such a study would be more meaningful at a future date when the system is more mature.
cc:
Byron Lee, Jr.
C. Reed F. A. Palmer D. P. Galle D.
Scott
- B. Saunders D. Smith F. Brittell
.8009120- 't~ 3 Nuclear Licensing