Text
Docket No;:
50-389 NgIIt P.
1982 APPLICANT:
Florida Power and Light Company, (FP&L)
FACILITY:
St.
Lucie Plant, Unit 2
SUBJECT:
SUMMARY
OF MEETING HELD IN BETHESDA, MARYLAND ON OCTOBER 13, 1982 REGARDING ACTIONS NEEDED TO RESOLVE SQRT AND PVORT ISSUES A summary of the issues (which were identified in the SQRT and PVORT audit report published in SSER.2) discussed and the actions to be taken is given below.
1.
Airline supports for MSIV:
FP8L formally submit that supports installed.NRC staff will verify installation.
2.
Valve I MV-08 Appli'cant verified the installation of the piping supports where this valve is mounted.
3.
ICW pump:
The method =used calculated total maximum displacement for each of two modes by SRSS of model displacement and then subtracted the two resultant values.
Relative displacements between the two modes should be determined for each mode and then the SRSS procedure used on those values to be consistent with Regulatory Guide 1.92.
If contact between the impeller and case wear sur'faces is not detrimental to pump operation as stated in the 20 July 1982 letter from Byron Jackson then this can be a justification for quali'fication.
FP8L will verify this statement with
'yron Jackson.
Furthermore the wear ring loads will be reviewed for acceptable levels or a statement that the wear ring can be worn away to the maximum displacement.
FP8L to certify that bolt stresses are within elastic limits and/or that this effect of bolt stresses beyond preload is acceptable.
4.
TE-14-3A - FP8L provided justification of the support design for this thermocouple assembly.
This item is closed out.
5.
4.16-KV switchgear:
FP8L will provide a description of the verification program for transformer installation inspection.
6.
45 KVA trans - Action taken by FP8L closed out this item.
7.
Battery racks -
NRC to consult with EG&G about battery type concerns 8.
PT-1107 - Action taken by FP&L closed out.this item.
OFFICE P
~
~ ~ ~ tot ~ ~ ~
afoot
~
os
~ ~ o
~t ~ oooooootooo
~ oo
~ ~
ootoooo ~ ~ o ~ oto ~ ~ o ~ ohio SUANAME/
DATE Q 82iii00537 821102 PDR ADOCK 05000389
f A
'DR
~ ~t ~otto ~t ~tt ~t ~t ~t ~t ~t ~
NAG FOAM 318 (10-80) NACM 0240 OFFIC lAL RECORD COPY USGPO1 1981~o960
a "I III f i k
ll"
U gC 9.
Recorder No.
M226s - FP&L will submit report and justification for interim operation.
10.
Signal characterizers
- ID tag installation. PSB staff verification shall be changed to Region II verification.
11.
RPS cabinet FP&L will submit informal report on 10/15/82.
12.
HPSI pump -
FP&L provided satisfactory information so this item has been closed out.
13.
LPSI pump - (a)
FP&L will send qual report to EG&G by 10/15 (b)
FP&L to', provide statement on code verification 14.
LCV - 2110P -
FP&L provided the information needed by the staff.
This item is closed out.
15.
V-3517 - FP&L will identify the code which the valve code was verified against.
16.
G-levels - FP&L confirms that the input G levels specified for purchasing of v'alves and line-mounted instruments is larger than the actual G
values from piping stress analysis.
18.
Limit switches - Interim justification for operation will be provided for all non qualified limit switches.
19.
Interim justification The interm justification for all equipment that does not have a seismic report will be provided by 10/21/82.
20.
Rust on trestle -
FP&L will provide a descripti'on of method which is utilized to maintain the corrosion protection of safety related equip-ment.
21.
Tornado miss~iles-No further info required.
See FSAR T3.2-1.
22.
Sequential testing -
FP&L will provide Rev.
4 of the Eg report to address sequential testing to ensure seismic operability.
23.
FCV-3301 - FP&L provided the information needed by the staff.
This item is closed out.
BOP PVORT Same as SgRT NSSS PVORT OFFICEI SURNAME/
DATE 5 FCV-3301 - FP&L will provide information why, the date was voided and why it 1
be voided out.
This will be rovided b
10 21 82
'RC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1991~5.960
C',,
l
~
'0.
~
'-HV C-08-18 FP&L will prov'ide a similarity statement by 10/21/82.'his statement should conclude that based on similarity this valve should close under full f'low conditions HVC-3648 Instrument air maintenance procedure will be provided relating the air particulate purity; FP8L wi'll also provide a description of how the instrument'ir is purified.
I-V-7172 NRR expects that Region II will verify FP&L has manually cycled this valve.
V-2658 FP8 will provide a statement which will state the Pre-Op test number which will test this valve under full flow conditions, Thi's wi'll be di'scussed under generic issue.
Generic Issues All Active Safet Related valves should be included in the FP&L re-op ro ram includin check valves.
FP8L will look at the pre-op program and the actiVe valve list and determine if the valves are stated during the pre-op program.
FP8L will i'nform the NRC by 10/21/82 what this investigation revealed.
0 Haintence Verify Vendor recommended maintenance is performed;and.any.maintenan'ce'requiyed as a result of some qualification program.
Leaka e and Test Information Available in Central Fi'les This information will be available on 10/21/82.,
Completion of the Pro ram Component operability testing is completed with the beginning of commercial operations.
Wighml, Sigued Byt Distribution:
See attached Victor Nerses, Project Manager Licensing Branch No.
3 Division o'f Licensing OFFICE/
SURNAME/
DATEQ cc:
See n
~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ xt page
~ 0 ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 DL:LB¹3
~ ~ ~ ~ ~
~
~ 0 ~ OJgO ~ 0 ~ ~ 0 ~
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0
~ 0 ~ 000 ~ 0 ~ ~
11/ / /82
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ 000 ~ ~ ~ 0 ~ 0 ~ ~ ~
~
~ ~ ~
~
~
0 ~ 0 ~ ~ ~ ~ ~
on 11/
I
/82
~ ~ 0 ~ 0 ~ 0 ~ ~ 0000 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~
~
NRC FORM 318 t10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~960
0
'7 "o I,
I
ST.
LUCIE Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power
& Light Company P. 0.
Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad
& Toll 1025 Connecticut Avenue, N.W.
Washington, D. C.
20036 Norman A. Coll, Esq.
Steel Hector
& Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N.
E. 86th Street Miami, Flordia 33138 Resident Inspector St Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South.'APA Jensen Beach, Flordia 33457 Regional Adminstrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta. Georgia 30303
ATTENOANCE LIST S. Pothiraj M. Horrell R.
Sweeney S. Lockfort L. Gradin P. Carier M. Banerjee W. Wehler E. Dotson G.
Bagchi M. Haughey J.
Sheetz V. Nerses C. Fisher M. Cross E.
Zuchman J. Moulton R. Stevens J. Franklin B. Wright S
RT/PRORT MEETING Ebasco Ebasco/Licensing Ebasco Ebasco Ebasco FPEL/Licensing Ebasco/Licensing FPSL FPSL NRC NRC FOCAL NRC FPSL CE Ebasco CE FPSL FPSL NRC
MEETING SUhf)ARY ment Control (50-3Bg)
HRC POR L
POR HSIC TERA-LBi3 Reading J.
Lee G. Knighton Project t~anager V. He.ses
- Attorney, OELO E.
L. Jordon Regional Administrator, Region J.
H. Taylor PARTICIPANTS (HRC: