Forwards Insp Rept 50-244/93-23 on 931115-19.No Violations Noted
ML17263A500
Person / Time
Site: Ginna 
Issue date: 12/16/1993
From: Durr J
Office of Nuclear Reactor Regulation
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17263A501 List:
References
NUDOCS 9312270223
Download: ML17263A500 (4)


See also: IR 05000244/1993023

Text

Docket No. 50-244

Dr. Robert C. Mecredy

Vice President,

Ginna Nuclear Production

Rochester

Gas and Electric Corporation

89 East Avenue

Rochester,

New York 14649

Dear Dr. Mecredy:

SUBJECT:

INSPECTION REPORT NO. 50-244/93-23

This letter refers to the inspection conducted by Mr, J. Carr isco of this office on

November 15-19, 1993, at the Rochester office in New York. The inspector discussed

the

results of the inspection with Mr. J. F. Smith and other members of your staff at the

conclusion of the inspection.

This inspection focused on activities important to the public health and safety and was

directed towards engineering activities to determine whether the design and modification of

your safety-related piping and pipe supports were performed in accordance with regulatory

requirements,

engineering specifications and properly documented.

This inspection included

the review of the steam generator replacement project's current status, organization, design

features,

and project schedule.

This inspection also included a review of the steam generator (SG) "B" hydraulic snubber's

operability evaluation.

During the course of the inspection, the plant shutdown to repair a

steam leak.

Details on the areas examined during the inspection are described in the NRC Region I

inspection report, which is enclosed with this letter.

Within these areas,

the inspection

consisted of selected examinations of procedures

and representative

records, interviews with

personnel,

and observations by the inspector.

Within the scope of this inspection, no violations were observed.

However, at the time of

the exit meeting the inspector had not received supportive documentation on the root cause

for the leak of blowdown line S/G "B".

2300';:6

9312270gpg

ppgpg6

PDR

ADOCK 05000244

Q

PDR

lg0

OEC

I 6 iS93

Rochester

Gas and Electric

Corporation

No reply to this letter is required.

Your cooperation in this matter is appreciated.

Sincerely,

QL'< .<<XQ5>> S$ 5

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Region I Inspection Report No. 50-244/93-23

cc w/encl:

R. Smith, Senior Vice President, Production and Engineering

Central Records (5 copies)

Director, Energy and Water Division

State of New York, Department of Law

N. Reynolds, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

State of New York, SLO Designee

Rochester

Gas and Electric

Corporation

bcc w/encl:

Region I Docket Room (with concurrences)

W. Lazarus, DRP.

D. Lew, DRP

bcc w/encl (VIAE4RKIL):

A. Johnson, PM, NRR

W. Dean, OEDO

W. Butler, NRR

M. Campion, ORA

RI:DRS

Carrasco

11/

/93

RI:DRS

Modes

12/'7 /93

RI:DRS

Durr

12/i&93

OFFICIALRECORD COPY

A:GIN9323.INS