ML17265A348

From kanterella
Revision as of 09:32, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discusses 980623 Telcon Between Tj Kenny & F Maciuska Re Arrangements Made for Administration of Licensing Exams at Plant During Wk of 981019.Exam Outlines Must Be Furnished by Licensee in Order to Meet Schedule
ML17265A348
Person / Time
Site: Ginna 
Issue date: 06/24/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
References
NUDOCS 9807020040
Download: ML17265A348 (6)


Text

CATEGORY REGULATORY ZNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9807020040 DOC.DATE: 98/06/24 NOTARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION CONTE,R.J.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION

'ECREDY,R.C.

Rochester Gas

& Electric Corp.

SUBJECT:

Discusses 980623 telcon between TJ Kenny

&. F Maciuska,where arrangements were made for administration of licensing exams at Ginna facility during wk of 981019.Exam outlines must be furnished by licensee in order to meet schedule.

DXSTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Operator Licensing Examination Reports NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 0500024 G

RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL F

E ENT FILE 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAME VISSING, G.

NRR/DRCH/HOHB COPIES LTTR ENCL R

EXTERNAL: NOAC NRC PDR D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 7

ENCL t

June 24, 1998 Dr. Robert C. Mecredy Vice President, Ginna Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649

SUBJECT:

SENIOR REACTOR OPERATOR AND REACTOR OPERATOR LICENSING EXAMINATIONS-GINNA

Dear Dr. Mecredy:

In a telephone conversation on June 23, 1998, between Mr. Thomas J. Kenny and Mr. F. Maciuska, arrangements were made for the administration of licensing examinations at the Ginna facility during the week of October 19, 1998.

As agreed during the telephone conversation, your staff willprepare the examinations based on the guidelines in Interim Revision 8, if NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."

The NRC regional office willdiscuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 19, 1998. The written examinations and operating tests will be due by September 19, 1998. Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.

In accordance with ES-302, your staff should retain the original simulator performance data

(.e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [Office of Management and budget (OMB) approval number 3150-0090], medical certifications (OMB approval number 3150-0024), and waiver request (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

9807020040 980624 PDR ADOCK 05000244 V

PDR Q. g U <> u '>>

Dr. Robert C. Mecredy This letter contains information collections that subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response,,including the time for reviewing Instructions; gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101),Office of Management and Budget, Washington, DC 20503.

Thank you for your cooperation in this matter.

Mr. Maciuska has been advised of the policies and guidelines referenced in this letter.

If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. T. Kenny at (610) 337-5287 or me at (610) 337-5183.

Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.

50-244 CC:

R. Smith, Senior Vice President, Energy Operations Central Records (7 copies)

P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority

Dr. Robert C. Mecredy Distribution:

Region I Docket Room (with concurrences)

PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)

L. Doerflein, DRP B. Cook, DRP R. Junod, DRP T. Kenny, DRS R. Conte, DRS B. McCabe, Rl EDO Coordinator S. Bajwa, NRR G. Vissing, NRR M. Campion, ORA Inspection Program Branch, NRR (IPAS)

DOCDESK OL Facility (V. Curley)

DRS File DOCUMENT NAME: G tOLHP>KENNY>SROROEXM.GIN To receive a copy of this document, Indicate In the box: "C" ~ Copy without attachment/enciosure "E" = Copy with attachmentrenciosure N ~ No OFFICE Rl/DRS NAME TKenny DATE 06/23/98 RI/DRS RConte 06/

06/

/98 OFFICIAL RECORD COPY

,06/

/98 06/

/98