GO2-82-265, Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR

From kanterella
Revision as of 08:04, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR
ML17276B131
Person / Time
Site: Columbia 
Issue date: 03/01/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17276B132 List:
References
GO2-82-265, NUDOCS 8203090767
Download: ML17276B131 (8)


Text

REGULATORY RMATION DISTRIBUTION 'SYS (RIDS)

ACCESSION NBR:8203090767 DOC.DATE: '82/03/01 NOTARIZED:

NO DOCKET ¹

, FACIL:50-397 liPPSS Nuclear Pro.lect'nit

'2P washington 'Public Powe 05000397 AUTH~ NAME, AUTHOR AFF ILIA/ION BOUCHEYPG.DE

'Hashingtan Public Power Supply 'System REC IP ~ NAME REC IP IENT AFFILIATION SCH'NENCERPA ~

Licensing Branch 2

~&

SUBJECT:

Forwards, addi info re control. room chillens Eone oversize drawing of diesel generator exhaust line con(i'gurafion, showing tornado missile protectionPper NRC 820219 requests Aperture card is available in PORE DISTRIBUTION CODE:

BOOIS COPIES iRECEIVED:LTR,, $',ENCL Q SIZE: Q TITLE: PSAR/FSAR AMDTS and /elated Correspondence NOTES:2 copies all matl!PM'5000397 RECIPIENT ID CODE/NAME ACTION:

A/D LICENSNG LIC BR ¹2'A COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME LIC BR ¹g BC AULUCKPR ~

01

'COPIES LTTR ENCL 0

1 1

INTERNAL: ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 N

/DS I/RSB 23 04 1

0 1

1 1

0 3

3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/IiCSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 3

1 2

1 1

1 1

1 1

1 1

1 3

3 1

2 1

1 1

1 1

1 1

1 1

1 EXTERNAL: ACRS 41 FEMA REP DI V 39 NRC PDR 02 NTIS 16 16 1

1 1

1 1

1 BNL(AMDTS ONLY)

LPDR 03 NSIC 05 1

1 1

1

+~ega Ce~k.~'+

TOTAL NURSER OF COPIES REQUIRED:

LTATR P4 ENCL P5

M IV 1

~

f hh VVI 1f fh I

F,I l

~

~

! ~

I t

hk k

F VI I

ll xf I! IJh J

I J I

I,

,m, IF, I, P )

~

fl'

8203090767 82030i

~

PDR ADOCK 05000397 A

PDR Washington Public Power Supply System P.O. Box968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 March l, l982 G02-82-265 SS-L-02-PLP-82-009 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 HRepeg

'OIIN-

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 SER ISSUES As requested during a phone conversation between Supply System represen-tatives and Mr. R. Auluck and Mr. J. Ridgley of your staff on February 19, 1982, attachments providing additional information on WNP-2 Control Room Chillers and a drawing of the diesel generator exhaust line configuration showing tornado missile protection are submitted.

If you have any further questions, please contact Mr. P.L. Powell, (509) 377-2501 Extension 2909.

Very truly yours, G.

D. Bouchey Deputy Director, Safety and Security PLP/jca Attachments cc:

R Auluck NRC WS Chin

- BPA R

Feil NRC Site J

Ridgley -

NRC

,0

~

CBV>BQHR

~ Q

~ggge( gQ %Alibi

@%5$ ~~<~@

g rf<

~

t

ATTACHMENT I The new control room chillers will be located in the enclosed HVAC rooms I and 2 in the Radwaste Building, elevation 525'.

There is no high energy piping located in these rooms.

The chillers and their installation will conform to Seismic Category I Criteria and the associated documentation will be available for NRC review during the normal review period.

The power supplies for these chillers will come from Class IE power supplies.

k

ATTACHYiENT I I

~Dw S856 The diesel generator exhaust runs vertically t)rough the muffler and goes through a

90 elbow and then through a 45 elbow and terminates flush to the exterior of the penthouse.

The 45 exhaust line con-0 stitutes missile protection for the diesel generator exhaust.

0

~,

g j

C P