Responds to 910909,20 & 25 Ltrs Re Scheduled Completion of All Committed Actions as Documented in Confirmatory Action Ltr.Corrective Action Sufficient for Restart of Facility
ML17286B054
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/25/1991
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
CAL-RV-91-01, CAL-RV-91-1, NUDOCS 9110010088
Download: ML17286B054 (3)


Text

~ ~~o.

(4 Mp0 Cy C1O

+r+~

~O

++*>>>>

t UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1460 MARIALANE, SUITE 210 WALNUTCREEK, CALIFORNIA94696-6368 September 25, 1991 Docket No. 50-397 Washington Public Power Supply System 3000 George Washington Way Nail Drop 1023 Richland, Washington 99352 Attention:

Hr. A. L. Oxsen Deputy t~anaging Director SUBJFCT:

RESTART OF WASHINGTON NUCLEAR PROJECT UNIT 2 It is our understanding, based on your letters dated September 9, 1991, September 20,

1991, and September 25, 1991, that you have completed, or have scheduled to complete, all nf your committed actions as documented in our Confirmatory Action Letter (CAL) V-91-01, Revision 3, dated June 14, 1991.

Therefore, the NRC concludes that, regarding the matters discussed in the CAL, your corrective actions to resolve those matters are sufficiently complete to war rant resumption of power operations at WNP-2.

As noted in the referenced CAL, the WNP-2 Licensed Operator Requalification Program will not be assigned a provisionally satisfactory status until a

determination has been made by the NRC that your short and intermediate term corrective actions have been substantially completed in an effective manner, and have been verified by the NRC.

The NRC will notify you in writino when this determination has been made.

Further, it is our understanding that in the event that you decide to alter the composition of any of your operating

crews, you will notify the NRC Regional Office of the changes until such time that your requalification program is found satisfactory or provisionally satisfactory.

In addition, it is our understanding that the Supply System committed, at the August 28, 1991 meeting with the NRC in Rockvi lie, Nd., to provide a detailed action plan for emergency operating procedure improvements, as well as detail any EOP changes made as a result of these improvements, within 30 days of our inspection report to you on this subject.

If your understanding differs from this, please contact me immediately.

Thank you for your cooperation.

inc rely, J.

B.

Viartin Regional Administrator 911001 00BB 910925 PDR ADOCK 05000397 P'DR

CC:

Mr. J.

W. Baker, WNP-2 Plant Manager Mr. A. G. Hosier, WNP-2 Licensing Manager Mr. G.

D. Bouchey, Director, Asssurance 8 Licensing Mr. G.

E. Doupe, Esq.,

WPPSS Mr. A. Lee Oxsen, Deputy Managing Director State of WA Mr. M. H. Phi lips, Esq.

bcc:

T. Murley, NRR W. Russell, NRR J. Partlow, NRR J.

Roe, NRR J.
Dyer, NRR R. Gallo, NRR B. Boger, NRR M. Virgilio, NRR P.
Eng, NRR G. West, OEDO J. Martin, RV B. Faulkenberry, RV R. Zimmerman, RV K. Perkins, RV A. Johnson, RV D. Kirsch, RV L. Miiller, RV P. Johnson, RV T.
Sundsmo, RV C. Sorenson, SRI R. Cross, RV G.
Cook, RV.

M. Smith, RV J. Zollicoffer, RV Docket File RV/jk REQUESl COPY YFS /

NO REQUEST COPY REQUEST COPY YES /

NO YES /

NO KIRSCM 9/

/91 BLUME 9/

/91 PERKINS 9/

/91 EST COPY E

/

NO REQUEST COPY RE T

OPY YES

/

NO YE /

N

~ph P GALLO yoke +

FAULKENBERRY MAR P~

9~91 9/

/91 9/g/91 REQUEST COPY EST COPY E

/

NO YE

/

NO ZIMMERMAM~PR DYER ~PZ P 7: @Pu 9/s J /91 9/gS/91 Rp'5 ph, P

[

COPY TO DCS M NO ]

COPY TO PDR YE NO