++*a~
Docket No. 50-397
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CALIFORNIA94596-5368
November 9,
1992
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Nr.
G.
C. Sorensen
Manager,
Regulatory
Programs
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-397/92-31
This refers to the inspection
conducted
by Messrs.
R.
C. Sorensen,
D. L.
Proulx,
W. P. Ang, D. F. Kirsch, and
R.
C. Barr of this office on August 24
through October 4,
1992 of activities authorized
by
NRC Operating
License
No.
and to the discussions
of findings held by the inspectors with Hr. J.
Baker and other members of the Supply System staff at the conclusion of the
inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
Our review of your completed local leak rate test
(LLRT) procedure
records
identified several
procedure
documentation
discrepancies
(paragraph
8 of the
enclosed report) similar to those identified in Inspection
Report
No. 50-397/
92-01,
and addressed
by the corrective actions described
in your letter dated
July 10,
1992.
While these discrepancies
occurred prior to your implementa-
tion of these corrective actions
and did not appear to challenge
the validity
of the test results
obtained,
they further indicate the need for senior
management
attention to procedure
adherence
concerns at WNP-2.
No violations or deviations
were identified.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely
S. A. Richards,
Acting Chief
Reactor Projects
Branch
92i201015i 92ii09
ADOCK 05000397
8
1
~
i
Enclosure:
Inspection
Report No. 50-397/92-31
cc:
A. L. Oxsen, Acting Managing Director
J.
V. Parrish, Assistant
Managing Director for Operations
J.
C. Gearhart,
equality Assurance Director
J.
W. Baker,
WNP-2 Plant Manager
A. G. Hosier,
WNP-2 Licensing Manager
G. E. Doupe,
Esq.
Winston
8 Strawn
State of Washington
H
r~
l
I'
-3-
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
- B. Faulkenberry
J. Hartin
R. Huey
P. Johnson
J. Clifford, NRR
G.
Cook
bcc w/o enclosure:
H. Smith
J. Bianchi
J. Zollicoffer
REGIO
V
C.'rOPro
11/
/92
~
11/P
92
~11/(, /92
11/$
92
Pll/
ns
n
2
YES
NO
Y
S
NO
CO
Q
0
NO
YES
NO
YES
NO
Q
NO
NO
~
'