TAC:M80358
From kanterella
Revision as of 05:13, 8 January 2025 by
StriderTol
(
talk
|
contribs
)
(StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
TAC
-
M80358
, (Approved, Closed)
14 February 1992 - 21 May 1993
Request for:
Approved, Closed
Initiation
Request...
Acceptance...
Withholding Request...
Meetings...
Questions
Answers
Results
Approval
Other:
GO2-92-086, Suppls 920108 Response to NRC Safety Evaluation of Util Responses to Generic Ltr 88-01 Re Flaw in Reactor Recirculation Piping.Corrected Table 4 Re Util Positions on Leakage Detection Encl
,
GO2-92-123, Submits Rept on Flaw in Reactor Recirculation Piping,Per Generic Ltr 88-01.Indication in ISI Weld 20RRC(6)-8 Reexamined on 920421 to Determine Any Size Change.Results Listed on Encl Submitted for Approval for Restart on 920629
,
GO2-93-119, Forwards GE Rept R-R8-111 Re Flaw in Reactor Bldg Piping. Review of Program Output for Fatigue Analysis & IGSCC Fracture Mechanics Showed Current Crack Size Well within Limit of Util Evaluation.Indication Will Be Monitored
From
Columbia
|
[Open (320)]
|
[Closed (233)]
[list all from site]
MONTH
YEAR
ML17289A339
1992-02-14
0
14 February 1992
Forwards SE Concluding That Reasonable Assurance Exists That Structural Integrity of Affected Piping Will Be Maintained Exists & That Plant Can Be Safely Operated for Current 12 Month Fuel Cycle
GO2-92-086, Suppls 920108 Response to NRC Safety Evaluation of Util Responses to Generic Ltr 88-01 Re Flaw in Reactor Recirculation Piping.Corrected Table 4 Re Util Positions on Leakage Detection Encl
1992-04-10
0
10 April 1992
Suppls 920108 Response to NRC Safety Evaluation of Util Responses to Generic Ltr 88-01 Re Flaw in Reactor Recirculation Piping.Corrected Table 4 Re Util Positions on Leakage Detection Encl
GO2-92-123, Submits Rept on Flaw in Reactor Recirculation Piping,Per Generic Ltr 88-01.Indication in ISI Weld 20RRC(6)-8 Reexamined on 920421 to Determine Any Size Change.Results Listed on Encl Submitted for Approval for Restart on 920629
1992-05-14
0
14 May 1992
Submits Rept on Flaw in Reactor Recirculation Piping,Per Generic Ltr 88-01.Indication in ISI Weld 20RRC(6)-8 Reexamined on 920421 to Determine Any Size Change.Results Listed on Encl Submitted for Approval for Restart on 920629
GO2-93-119, Forwards GE Rept R-R8-111 Re Flaw in Reactor Bldg Piping. Review of Program Output for Fatigue Analysis & IGSCC Fracture Mechanics Showed Current Crack Size Well within Limit of Util Evaluation.Indication Will Be Monitored
1993-05-21
0
21 May 1993
Forwards GE Rept R-R8-111 Re Flaw in Reactor Bldg Piping. Review of Program Output for Fatigue Analysis & IGSCC Fracture Mechanics Showed Current Crack Size Well within Limit of Util Evaluation.Indication Will Be Monitored
1992-04-10
[table view]
Category
:
TAC
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View form
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties