Forwards Insp Rept 50-397/94-08 on 940131-0204.No Violations Noted
ML17290B017
Person / Time
Site: Columbia 
Issue date: 03/01/1994
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17290B018 List:
References
NUDOCS 9403160019
Download: ML17290B017 (7)


See also: IR 05000397/1994008

Text

FORD I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9403160019

DOC.DATE: 94/03/01

NOTARIZED:

NO

DOCKET

CIL:50-397

WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

. UTH. NAME

AUTHOR AFFILIATION

RICHARDS,S.A.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

=orwards insp rept 50-397/94-08

on 940131-0204.No violations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR J

ENCL

1

BISE:

+ 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

lD CODE/NAME

PDV PD

COPIES

RECIPIENT

LTTR ENCL

ID CODE/NAME

1

1

CLIFFORD,J

COPIES

LTTR ENCL

1

1

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

ERNAL: EG&G/BRYCEgJ.H.

NSIC

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE

D

'C2KGWKL

0 2

RGN5

FILE

01

NRC PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

L STS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

~pg 4E0y,

Fp

~4

0~i

+o

++*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CALIFORNIA94596-5368

iv,AR g gg

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

3000 George

Washington

Way

Richland,

Washington

99352

Attention:

Hr. J.

V. Parrish,

Assistant

Hanaging Director for Operations

SUBJECT:

NRC

INSPECTION

OF WASHINGTON NUCLEAR PROJECT,

UNIT 2,

INSPECTION

REPORT 50-397/94-08

This refers to

a routine

announced

inspection

conducted

by Hr. D. Acker during

the period of January

31 through February 4,

1994, of activities authorized

by

NRC License

No. NPF-21,

and to the discussion of his findings held with you

and other members of your staff on February 4,

1994.

Areas

examined during this inspection

are described

in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the

inspector.

This inspection

reviewed actions

you have initiated to address

questions

raised

in

NRC Inspection

Report 50-397/93-51,

regarding the adequacy of fire

barrier penetration

seals.

This inspection identified additional potential

omissions

in your design basis for fire barrier penetration

seals.

We have

reviewed your initial actions to resolve these

items

and consider your staff's

actions to be directed towards resolving the concerns

raised.

We encourage

you to continue with your corrective actions to ensure that

WNP-2 fire barrier

penetration

seals

meet design requirements.

Although no violations or deviations of NRC requirements

were identified

within the scope of this inspection,

two additional

issues

regarding fire

barrier penetration

seals

were identified as unresolved

items pending the

completion of your evaluation of the issues.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

94031b0019

940301

PDR

ADOCK 05000397

8

PDR

2

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Enclosure:

Inspection

Report

No. 50-397/94-08

Stuart A. Richards,

Acting Director,

Division of Reactor Safety

and Projects

CC:

D. Coleman,

Acting Hanager,

Regulatory

Programs,

WPPSS

J.

W. Swailes,

WNP-2 Plant Hanager,

WPPSS

Hr. H.

E. Kook, Jr., Acting Hanager,

Licensing,

WPPSS

G.

E. Doupe,

Esq.,

WPPSS

Chairman,

Benton County Board of Commissioners

H.

H. Phillips, Esq.,

Winston

E Strawn

Warren A. Bishop,

Energy Facility Site Evaluation Council

bcc w/enclosure:

P. Johnson

D. Kirsch

Project Inspector

Resident

Inspector

G.

Cook

K. Perkins

Docket File

.

y, 9- Nba ('eat -" c.)5+

bcc w/o enclosure:

M. Smith

J. Zollicoffer

J.

Bianch'Acke

PJp

~ /i4 /94

> /I'

MAng

94

w/+/94

[

T COPY]

E VEST COPY]

[REQUEST

Y]

ES /

NO

]

YES /

NO

] [YES /

NO

]

S Richards

g/ K /94

EST COPY]

[RE(VEST COPY]

[RE(VEST COPY]

YES) /

NO

]

[YES /

NO

]

[YES /

NO

]

TO

PDR ]

YES /

NO

]

'alJ O~

File G:~rsbgengr~wn-94-08.dye

~

~ /