ML17325B089
| ML17325B089 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/31/1988 |
| From: | Giles H, Will Smith INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8901180040 | |
| Download: ML17325B089 (7) | |
Text
A.CCKMRA.TED DlSTRIBUTION DEMONSTRATION SYSTEM t
t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901180040 DOC.DATE: 88/05/31 NOTARIZED: NO DOCKET I FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana 6
05000316 AUTH.NAME AUTHOR AFFILIATION GILES,H.B.
(formerly Indiana
& Michigan Ele SMITH,W.G.
(formerly Indiana S Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for May 1988 for DC Cook Unit 2.W/
880603 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES RECIPIENT ID CODE/NAME PD3-1 LA STANG,J COPIES LTTR ENCL 1
0 1
0 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 5
5
/
h INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN3 1
AEOD/DSP/TPAB 2
NRR/DLPQ/PEB 11 1
~
P/RPB 10 1 ~gG~
01 1
1 1
1 1
1 1
1 1
EXTERNAL EGGG S IMPSON I F LPDR NSIC 1
1 1
1 1
1 EGGG WILLIAMS,S NRC PDR 1
1 1
1.
NOTE 'ZO ALL "RIDS" RECIPIENIS'LEASE HELP US TO REDUCE WASTE.'OÃZACZ %HE DOCUMEtG'ONZROL DESK, RXIM Pl-37 (EXT. 20079)
KO EZZMZNATE YOUR NME FMH DISTEKMXXON LISTS H)R DOCUMENIS YOU DGNIT NEEDI D
S TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 20
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 1 JUNE 88 COMPLETED BY H.B. GILES TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period MAY 1988
,'notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1100 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six to Date 3647.0 2715.5 0.0 2715.1 0.0 7410980 2419600 2323265 74 '
74.4
- 60. 1 57 '
0 '
Date,and This Mo.
Yr.
744.0 0.0 0.0 0.0 0.0 0
0 0
0.0 0 '0.0 0.0 ERR Months (Type, Cumm.
91295. 0 63595.1 0.0 62210.0 0.0 189566377 61896220 59584665 70.0 70.0 63.3 61.7 14.5 Duration)-
- 25. If Shut Down At End of Report Period, Estimated Date of Startup-Estimated date of startu is Februar of 1989.
- 26. Units in Test Status (Prior to Commercial Operation)-
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved 8901180040 880531 PDR ADOCK 05000316 R
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE 50-316 TWO JUNE 88 COMPLETED BY H. B.
GILES TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL MAY 1988 DAY AVERAGE DAILY POWER LEVEL 1
2 3
4 5
6 7
8 9
10 11 12 13 14
. 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
. 30 31
l)NITSill)TI)(l)VNSANI)P())VI!R kEl)ll('1)ONS I)OCKE1'O.
UNITNAME l)ATE (T)MFI.ETEI)I)Y TELO'((ONE 50-316 2
l)ale cn ~
gSj 1.)ccnsce I:vc Ill l(ep<)ll 4 6
rL D P.v0 O
( anse 8< Collcclivc Ac<i<)n lo Pr even) ((ccnrrcnce 189 880423 S
744.0 88C ZZ ZZZZZZ n 4-23-88 the unit was removed from service for the steam generator replacement/refueling outage.
The reporting period. ended with the reactor core unloaded.
The expected ate for return to service is Feb.
1989.
I:: I'o<cc<)
S:
Schc<h<)c<)
('II77)
)
lleas<nl:
A Ii<(w)p<ncnl I'alhne (Explahl)
I) Mal<i)el<ance oil'es)
C Rcfnclh<g I) Hc),o)al<ny Reslriclion I'. Ope<alol I'<alnlni)k I)cense I'.Xan<)wallow I'.A<hl<)nlsr<alivc (1 ()i)c<alhnlal I:Ilol(I:xpian<)
ll()If<el (('.Xp)ah) I Melhod:
I Manwal 2'Manna) Scrawl.
.).Aw)on<ark!)<:raw<.
4 Olhcl (Exp)ah'I) 4 Exhibil C< - hlslrncli<)os fnt Prq)ala)1<x< of l)ala I!wilybhec)s fn< licensee I'.v<nll Hcp<<<I (I.I:R) I<ilc(N) )Rl'.(I<
- 0) (111
'I xhlhil I Sa<nc Soo<<e
'L
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit 2 R. Cessna (616) 465-5901 June 3,
1988 lof1 MONTHLY OPERATING ACTIVITIES -
MAY 1988 HIGHLIGHTS The reporting period began with RCS in Mode 5 draining to half Loop.
The RCS entered mode 6 on 05-06-88.
On 05-22-88 the reactor vessel head was removed.
The control rod drives were unlatched and removed on 5-24-88.
The upper internals of the reactor vessel were removed and fuel unloading began on 5-25-88.
The reporting period ended with the completion of fuel unloading on 5-29-88.
Gross electrical generation for the month of May was 0
MWH.
DETAILS 05-06-88 1652 05-09-88 1152 05-18-88 0228 05-22-88 1957 05-25-88 0147 1332 05-29-88 0747 RCS enters mode 6.
Reactor vessel head removed to repair stud k'll.
Reactor vessel head was replaced.
Reactor vessel head was removed for fuel unload.
Upper internals removed.
Started fuel unloading.
fuel unloading completed.
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook-Unit No.
2 June 3, 1988 R. Cessna 616 465-5901 1 of 1
MAJOR SAFETY-RELATED MAINTENANCE MAY 1988 CVCS letdown safety valve, 2-SV-51 suspected of leaking by at normal operating letdown pressure.
Replaced nozzle, disc, and gaskets.
Valve tested satisfactorily.
The East Centrifugal Charging Pump outboard mechanical seal was leaking.
The mechanical seal was replaced which stopped the seal leakage.
Indiana Michi Power Compa CooK Nuclear i,1 PO. Box 458 Bndgman.'l 49106 616 465 5901 iNDMMA NICHIGAN POWER U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 June 3,
1988 Gentlemen:
Pursuant to the requirements of Donald C,
Cook Nuclear Plant Unit 2 Technical Specification 6.9. 1. 10, the attached Monthly Operating Report for the month of May 1988 is submitted.
Sincerely, W.
G. Smith, Jr.
Plant Manager WGS/jd cc:
D.
H. Williams, Jr.
M. P. Alexich R.
W. Jurgensen R.
C. Callen C. A. Erikson D.
W. Paul D.
R.
Hahn J. J.
Markowsky E. A. Morse PNSRC File INPO Records Center ANI Nuclear Engineering Department T.
R. Stephens NRC Region III B. L. Jorgensen S.
L'. Hall D. A. Timberlake EPRI--Nuclear Safety Analysis Center