ML17335A311
| ML17335A311 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/23/1998 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Powers R AMERICAN ELECTRIC POWER CO., INC. |
| References | |
| NUDOCS 9811030179 | |
| Download: ML17335A311 (6) | |
Text
~
CATEGORY 2 REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9811030179 DOC.DATE: 98/10/23 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Xndiana M
05000315 50-316 Donald.C.
Cook Nuclear Power Plant, Unit 2, Xndiana M
05000316 AUTH.NAME AUTHOR AFFILIATION GROBE,J.A.
Region 3
(Post 820201)
RECIP.NAME RECXPXENT AFFILIATION POWERS,R.P.
American Electric Power Co.,
Xnc.
SUBJECT:
Summarizes 980929 meeting between NRC
& DCP in Washington,DC to discuss issues re restart strategy
&, plant performance indicators. List of attendees encl.
DISTRXBUTION CODE:
IE45D COPIES RECEIVED:LTR ENCL SXZE:
TITLE: Summary of Significant Meeting with Licensee (Part 50)
NOTES:
RECIPIENT ZD CODE/NAME PD3-3 PD INTERNAL: DEDRO NRR/DRPM/PERB RES/DET/EIB EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME STANG, J Baa8 OGC/ROED RGN3 FILE 01 NRC PDR COPIES LTTR ENCL 1
1.
1 1
1 1
1 1
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST OR REDUCE THE NUMBER OF. COPIL'S RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
. ~gS REcy Cit 4
~o 4y
~i nO I
Ol0 Y/~
~O
+a*++
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION III 801 WARRENVILLEROAD LISLE. ILLINOIS60532-4351 October 23, 1998 Mr. R. P. Powers Senior Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395
SUBJECT:
SUMMARY
OF THE SEPTEMBER 29, 1998, PUBLIC MEETING TO DISCUSS DONALDC. COOK NUCLEAR PLANT RESTART ACTIVITIES
Dear Mr. Powers:
This letter summarizes the meeting held on September 29 1998 between staff m mb f th
~
I e
erso e
he Donald C. Gook Nuclear Plant to discuss issues related to restart strategy and plant performance indicators. This meeting was held at NRC Headquarters in Washington, D. C., and was conducted from 1:00-4:30 p.m. This meeting was open for public observation.
Enclosure 1 provides a list of meeting attendees.
The NRC provided a brief introduction to the meeting, which included a presentation of the meeting agenda, a timeline of major regulatory activities during the extended shutdown, a summary of items on the Manual Chapter (MC) 0350 restart checklist, and a presentation of planned NRC inspection activity related to restart efforts. The handout with this information, provided by the NRC during this meeting, is contained in Enclosure 2. The NRC noted that the recent licensee schedule revisions to the Donald G. Cook Restart Plan invalidated the dates associated with the inspection schedule provided in Enclosure 2. The NRC indicated that, inspection dates would be revised to be consistent with the licensee's latest schedule for the completion of restart activities.
The licensee presented. information related to the schedules, strategies, and performance fa
'I'ndicators that plant management was implementing to bound generic safety con em d
aci itate the creation of an environment which fosters continuous performance improve t
thr u o gh the restart effort and transition into power operations.
The licensee discussed their n
improvemen efforts to address generic design basis concerns including their reviews of safety significant systems.
The licensee indicated that the auxiliary feedwater (AFW}safety system functional inspection (SSFI) is a critical activity which is intended to validate the effectiveness of the licensee's ability to identify and resolve safety concerns.
The AFW SSFI is a vertical slice inspection effort that will be implemented by the licensee with NRG oversight.
The handout with this information, provided by the licensee during this meeting, is contained in Enclosure 3.
The status of licensing activities in preparation by the licensee and under review by the NRG staff was included as an agenda topic. Time limitations required the completion of this item in a meeting separate from the formal MC 0350 Restart Panel process.
The NRC staff and licensee agreed to conduct monthly licensing meetings in conjunction with the MC 0350 Restart Panel meeting as a means of facilitating the restart process.
Highlights from the licensing meetings will be reported to the Restart Panel on a monthly basis.
98iiOMi79 98i023 PDR ADQCK 050003i5 P
R. Powers The NRC staff asked questions regarding the basis and adequacy of the licensee's performance indicators to provide a representative picture of plant performance.
Additionally, the NRC staff asked the licensee to describe the measures that plant management had taken to prepare for the unique challenges associated with the planned transitional period in which Unit 1 would be operating at power while Unit 2 remained shut down resolving restart issues.
ln accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures willbe placed in NRC's Public
.Document Room.
Sincerely, J. A. Grobe John A. Grobe, Director Division of Reactor Safety Docket Nos.: 50-315; 50-316 License Nos.; DPR-58; DPR-74
Enclosures:
- 1. List of Meeting Attendees
- 2. NRC Slide Presentation
J. Sampson, Site Vice President R. Eckstein, Chief Nuclear Engineer D. Cooper, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division Ml Department of State Police D. Lochbaum, Union of Concerned Scientists DOCUMENT NAME: G:iCOOKiDCC09298.SUM To receive a co of this document, indicate in the box: "C" = Co w/o attachment/enctosure "E" < Co with attachmen enctosure "N"~ No co OFFICE RI NAME B
P III-1 E
RIII Gavula RII B
ss Rill Gro DATE 1
0/ /8 10/
/9 10/ 0'98 OFFICIAL,RECORD COPY 10/lh 8
R. Powers Distribution:
RRB1 (E-Meit)
RPC (E-Mail)
Project Mgr., NRR w/encl J. Caldwell, Rill w/encl C. Pederson, Rill w/encl B. Clayton, Rill w/encl SRI DC Cook w/encl DRP w/encl TSS w/encl DRS (2) w/encl Rill 'PRR w/encl PUBLICJ&tta%v/encl~~
Docket File w/encl GREENS IEO (E-Mail)
DOCDESK (E-Mail)
-s.nr
,~,
s
4