ML17341A064

From kanterella
Revision as of 12:36, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNS-III-80-022:on 801215,bomb Threat Received in Control Room.Bomb Threat Procedure Implemented W/Negative Results. Guard Force Put on Security Alert.No Press Release Planned
ML17341A064
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/16/1980
From: Christoffer G, Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNS-III-80-022, PNS-III-80-22, NUDOCS 8102120392
Download: ML17341A064 (1)


Text

. 'PRELIMINARY NOTIFICATION Da'ze: December 16, 1980 PRELIMIHARY NOTIFICAT ION OF SAFE GUARDS E~ti

- 1tlS-XXI-80-22 This preliminar notification consti.utes EARLY notice of events of POSSiBLE safet or ublic interest sionificance.

The information resented m.as initiall received without verification or evaluation and is basi q

all that is known bv IE s.taf=

as of this date.

~Faoilit Commonrrealth Edison Company Quad-Cities, Unit 1 and 2

(DN 50-254 and 50-265)

Cordova, Illinois

SUBJECT:

B01prB THREAT At approximately 8:36 p.m.

on December 15,

1980, the control room received a

Bomb Threat from a male caller who stated:

"There'3.1 be a TNT blast in your place within ii an hour The Bomb Threat procedure was implemented and a thorough search of the plant revealed nothing.

The guard force was put on security alert.

The Plant Superintendent, Security Administrator,and two Assistant Superintendents were called onsite and monitored the activities.

The Sheriff, State Police, FBI were notified by the licensee.

went to the site.

No press release is planned by and an Army Explosive Ordinance Disposal (EOD) Unit The Resident Inspectors were 'also notifiedf-and the licensee or RIII.

RIII received notification of this event by telephone from the NRC Duty Officer at approximately 9:15 p.m.

(CST) on December 15, 1980.

This information is current as of 7:30 a.m.(CST),

December 16, 1980.

Contact:

G.

iM. Christoffer, RIII 384-637 J.

A. Hind, RIll 384-2642 H St.Z~'

Commissioner Hendrie Commissioner 8rad ford ACRS Di s tribution:

Tran smi tted Chairman Ahearne Commissioner Gilinsky

'S. J. Chilk, SECY C.

C.

Karrrnerer, CA (For Distribution)

IE:XOOS T! 4D (IE:HO Dist.)

Transmitted:

HNBB 1 > 6 I!. J.

Oircks, EOO C. Michelson, AEOD J. J.
Fouchard, PA H.

M. Hailer, MPA G. 1'. Kerr, OSP H.

K. Shapar, ELO P. Bldg.

H.

R. Denton, HRR R.

H. Yol lmer, HRR R. J. Mattson, HRR D. F. Ross, HRR O. Eisenhut, HRR S.

H. Hanauer 4andovr (6 min/page)

J. J.

Curt'~ings, OIA PA I L R. Minogue, SO IE.XOOS Document MIgt. Br. (For PDR/LPr'egional Offices P- /4-d')

S. Ebbin, Executive Director Nuclear Safety Oversight Coi".reit:

1133 15th Street

'..".ht, Suite 307

'n'ashington, DC 20005 POrL IMIs' ray

~ sOT I ~ I C!s>> IOsi 8102120 Qi~

rail 1 ste BI dg.~/!;'!..

J

~

G. Davis, 11MSS T. E. Hurley, RES