L-88-336, Special Rept:On 880701,one Surveillance Tendon of Horizontal Tendon Group Found to Have Measured lift-off Force Below Predicted value.Lift-off Forces in Tendons 13H49,13H50 & 13H51 Have Been Restored to Predicted Lower Values

From kanterella
Revision as of 11:45, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept:On 880701,one Surveillance Tendon of Horizontal Tendon Group Found to Have Measured lift-off Force Below Predicted value.Lift-off Forces in Tendons 13H49,13H50 & 13H51 Have Been Restored to Predicted Lower Values
ML17345A303
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/04/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-336, NUDOCS 8808110046
Download: ML17345A303 (6)


Text

ACCELERATED IhIIBUTION DEMONS1LTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8808110046 DOC.DATE: 88/08/04 NOTARIZED: NO DOCKET g FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 880701,hoop tendons measured lift-offforce below value required by Reg Guide 1.35.1.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR Q ENCL $

SIZE:

TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

D,'ECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRR~DRIS/SIB 9A

~G FIL@

02

%ES/DSTR DEPY RES/DSR DEPY EXTERNAL: EG&G WILLIAMS,S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1

1 1

1 1

1 1

1 2

2 1

1 1

0 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 4

4 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD ACRS MOELLER AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7

NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORD,J RES/DSIR/EIB RGN2 FILE 01 FORD BLDG HOY P A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1.

1 S

A D

A 8

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 46 ENCL 45

. SPECIAL REPORT LOW LIFT-OFF VALUES OF HOOP TENDONS DESCRIPTION On July 1, 1988, during the performance of the fifteenth year tendon surveillance of the Turkey Point Unit 4 containment post-tensioning

system, one surveillance
tendon, 13H51, of the horizontal tendon group, was found to have a measured lift-offforce 0.3 percent below the lower bound predicted value calculated in accordance with the requirements of Regulatory Guide 1.35.1

~

Consequently, additional lift-offmeasurements on a tendon located below (13H50) and a tendon located above (13H52) were taken.

As the measured lift-offforce in tendon 13H51 was below the predicted lower bound value, the plant entered a

15 day action statement requiring restoration of the tendons to the required level of integrity within 15 days, performance of an engineering evaluation of the containment, and the submission of a Special Report to the Commission within 30 days.

This action statement is part of procedure O-ADM-021, "Technical Specification Implementation Procedure,"

and not a part of the current Technical Specifications to which Turkey Point is licensed.

As this report is not required by Turkey Point s current Technical Specifications, it is being submitted as a voluntary Special Report in accordance with O-ADM-021.

The Turkey Point Unit 4 reactor containment structure consists of a flat reinforced concrete base

mat, an upright prestressed concrete cylinder and a

shallow prestressed concrete dome.

The prestressing force is provided by an unbonded post-tensioning system.

The system consists of 180 vertical, 489 horizontal, and 165 dome tendons.

Each tendon consists of 90 1/4 inch diameter wires.

The tendons are inserted inside sheathing ducts embedded in the concrete, and anchored on both ends by means of steel anchor blocks.

The wires are anchored to the anchor blocks by cold formed button heads.

The tendon ducts are filled with a corrosion inhibiting grease, and the end anchorages are covered with tightly bolted caps.

The post-tensioning system for the Turkey Point Unit 4 containment has been in service since 1972.

Periodic inspections have been performed previously on the tendon system in accordance with Technical Specification requirements.

Except for horizontal tendon 13H51, the lift-offforces measured in all vertical, horizontal and dome surveillance tendons were above the predicted lower limits.

The lift-offforce for tendon 13H51 was measured as 584.2 kips, while the lower bound predicted value is 585.7 kips.

This is less than a 0.3 percent variation from the lower bound requirement.

In accordance with O-ADM-021, lift-offforces in the tendons below (13H50) and above (13H52) tendon 13H51 were measured.

Tendon 13H52 recorded a measured lift-offvalue of 607.1 kips, which is above its lower bound predicted value of 585.7 kips The measured lift-offforce in tendon 13H50 was 581.6 kips, or 0.55 percent below the lower bound predicted value of 584.8 kips Since the lift-offforce in tendon 13H50 was also below its predicted lower bound value, the lift-offforce in the next adjacent tendon (13H49) was measured.

This SSOS110046 SSOS04 PDR ADOCK 05000251 S

PDC

tendon had a lift-offvalue of 583.1 kips, which is 0.3 percent below its predicted lower bound value.

In the same

manner, the lift-offforce in the next adjacent tendon (13H48) was measured A lift-offvalue of 586.8 kips, which is 0.3 percent above its predicted value of 584.8 kips, was recorded and additional testing was therefore terminated.

ANALYSIS The lift-offforces which are at variance with the predicted values occurred in one of the surveillance tendons and in two additional adjacent tendons.

The average variation relative to the lower bound acceptable limit for the adjacent tendons (13H49,

13H50, 13H51) is 0.4 percent.

Considering the lift-offforces in tendons 13H48 and 13H52, which physically bound the three tendons exhibiting low lift-offforces, the average reported lift-offfor the group of five tendons is 0.6 percent above the average acceptable lower bound predicted limit.

In both cases, the variation is extremely small and has occurred after the containment has already experienced the ma)or portion of identified losses (shrinkage, creep, relaxation.)

Additionally, in the design of the Turkey Point post-tensioning

system, losses due to concrete creep were calculated as a single conservative value of 19.2 ksi (or 11.4 percent) for all vertical, horizontal and dome groups of tendons.

The actual value obtained by test as reported in the Final Safety Analysis Report (FSAR) is 14.8 ksi (or 8.8 percent) for the hoop and dome tendons and 7.4 ksi (or 4.4 percent) for the vertical tendons.

In establishing the surveillance acceptance

criteria, the lower bound predicted value of the tendon lift-offforces was determined based on a slightly more conservative concrete creep loss value of 8.6 percent.

If the design creep loss value of 11.4 percent had been used, the lower bound predicted value of lift-offforce for tendon 13H51 would have been 569.3 kips instead of 585.7 kips.

As the measured lift-offforce in tendon 13H51 was 584.2 kips, which is well above the design lower bound predicted value of 569.3

kips, the measured lift-offforce for tendon 13H51 could have been considered acceptable without any further action.

This rationale is also valid for tendons 13H50 and 13H49, which had a slightly lower measured lift-offforce compared with the conservatively predicted lower bound lift-offforces.

Similar conservative assumptions were also made for losses due to shrinkage.

In addition to the conservative assumptions regarding material behavior and the computation of system prestress

losses, the containment post-tensioning system is designed to provide additional margins beyond the design criteria requirements.

As described in the FSAR, three 120 degree horizontal tendons comprising one complete hoop system have been provided over and above the structural requirements for the purpose of inspection and obtaining lift-offreadings.

In addition, as stated in the FSAR, any three ad)acent horizontal tendons can be lost without significantly affecting the strength of the containment structure.

This design feature considers the load redistribution capabilities of the containment shell.

The prestress level included in the design of containment poSt-tensioning systems similar to Turkey Point is typically 1.25 times the committed design pressure.

In addition, this structural system is designed to maintain this prestress level at

the end of 40 years service when the assumed losses are estimated to have occurred'herefore, at any time before the end of the 40 year service life, only part of the losses are expected to have taken place and the system would have additional capacity which exceeds 1.25 times the committed design pressure.

Recent evaluations and testing to assess the ultimate capacity of reactor building containment structures similar to the Turkey Point containment design have shown an ultimate capacity of 2.5 to 3.0 times the design pressure No abnormal conditions which could have resulted in this deviation were identified.

Based on the design margins incorporated in the post-tensioning system and the'tress levels measure in the tendons, it can be concluded that the containment post-tensioning system will maintain its integrity and is capable of continued acceptable performance.

CORRECTIVE ACTIONS 1)

The lift-offforces in tendons

13H49, 13H50, and 13H51 have been restored to their predicted lower bound lift-offvalues.

2)

The lift-offvalues for tendons

13H48, 13H49,
13H50, and 13H51 will be obtained during the next scheduled surveillance, in addition to the normally selected surveillance tendons.

)

PLORIOA POWER 5 LIGHT COMPANY AUGUST.

4 1988 L-88-336 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Unit 4 Docket No. 50-251 Special Report Low Lift-Off Values of Hoo Tendons In accordance with Turkey Point Administrative Procedures the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, W. F.

Con y

Senior Vice President Nuclear WFC/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant PEOPLE... SERVING PEOPLE