ND-18-0001, (VCSNS) Units 2 and 3, Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VI 11 Departures

From kanterella
Revision as of 02:27, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
(VCSNS) Units 2 and 3, Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VI 11 Departures
ML18032A305
Person / Time
Site: Summer  
Issue date: 02/01/2018
From: Archie J
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk
References
NND-18-0001
Download: ML18032A305 (1)


Text

< sCE&G@

A SCANA COMPANY U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Jeffrey B. Archie Senior Vice President, SCANA Senior Vice President & CNO, SCE&G February 1, 2018 NND-18-0001 10 CFR 50.59( d)(2)

Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Nos. NPF-93 and NPF-94 Docket Numbers52-027 and 52-028

Subject:

Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VI 11 Departures In accordance with 10 CFR 50.59(d)(2), VCSNS Units 2 and 3 is required to submit a report to the NRC containing a brief description of any changes, tests or experiments made pursuant to 10 CFR 50.59(c), including a summary of the evaluation of each. This 10 CFR 50.59 report is for the period beginning August 1, 2017 and ending January 31, 2018. During that period there were no changes, tests or experiments made pursuant to paragraph (c) of 10 CFR 50.59.

Additionally, as required by paragraphs X.B.1 and X.B.3.b of Appendix D to 10 CFR Part 52, VCSNS Units 2 and 3 is required to submit a report of all plant-specific departures made in this reporting period. There were no plant-specific departures for the reporting period beginning August 1, 2017 and ending January 31, 2018.

This letter contains no regulatory commitments.

Should you have any questions regarding this letter, please contact Mr. Justin R. Bouknight by telephone at (803) 941-9828, or by email at justin.bouknight@scana.com.

JRB/JBA cc:

Frederick Brown Vanna Ordaz Cathy Haney Billy Gleaves Shawn Williams Tomy Nazario Jim Reece Jeffrey B. Archie Sincerely, // L

~=:;

Alvis J. Bynum Kyle M. Young Justin R. Bouknight Susan E. Jenkins William M. Cherry Jason W. Williams DCRM-EDMS@SCANA. COM VCSNNDCorrespondence@scana.com SCE&G I New Nuclear Deployment* P. 0. Box 88

  • www.sceg.com