ML18100A823

From kanterella
Revision as of 01:45, 6 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 94-09 W/Util on 940201 to Conduct Enforcement Conference on Failure to Follow Work Procedures
ML18100A823
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/11/1994
From: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-94-003, EA-94-3, NUDOCS 9401250077
Download: ML18100A823 (2)


Text

JAN f r r994 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Public Service Electric & Gas Company Facility:

Salem Generating Station Docket No:

50-272; 50-311 Date and Time:

Tuesday, February 1, 1994 at 10:00 a.m.

Location:

U. S. NRC, Region I Office, DRP Conference Room No. 94-09 EA 94-003

Purpose:

Enforcement Conference on Failure to Follow Work Procedures

  • (Several Examples)

NRC Attendees:

R. Cooper, Division Director, Division of Reactor Projects (DRP)

E. Wenzinger, Chief, Projects Branch 2, DRP J. White, Chief, Projects Section 2A, DRP C. Marschall, Senior Resident Inspector, Salem/Hope Creek J. Stone, Project Manager, NRR P. K. Eapen, Chief, Systems Section, Engineering Branch, Division of Reactor Safety (DRS)

Licensee Attendees: S. Miltenberger, Vice President and Chief Nuclear Officer*

C. Vondra, General Manager, Salem Operations J. Hagen, Vice President, Operations F. Thomson, Supervisor - Licensing*

Note: Due to sensitive subject matter this meeting is closed to the public for observation.

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., January 31, 1994, via telephone call to John White, Region I, at (215)-337-5114.

100[0

_._._, u \\j *. J 9401250077 940111 PDR ADOCK 05000272 G

PDR Orig!r.al Signed By:

Prepared by:

John R. White, Chief RPS 2A

~istribution: (Via E-*) -

2 J.M. Taylor, Executive Director for Operations (EDO)

J.. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

T. E. Murley, Director, Office of Nuclear Reactor Regulation H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

J. Lieberman, Director, Office of Enforcement B. Grimes, Director, Division of Operating Reactor Support, NRR C. Rossi, Director, Reactor Inspection & Licensee Performance, NRR W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR L. J. Callan, Associate Director for Projects, NRR S. S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR -

W. Dean, Regional Coordinator, OEDO N. Green, Jr., Policy Development and Technical Support Branch S. Bajwa, RPEB, NRR S. Lewis, Office of the General Counsel (OGC) _

C. Miller, Director, Project Directorate 1-2, NRR P. McKee, NRR/PSGB J. Stone, Project Manager, Salem, PD I-2, NRR C. Marschall, SRI Region I Branch Chiefs Region I Section Chiefs K. Abraham, Public Affairs Officer, RI D. Screnci, Field Public Affairs Officer, RI M. Miller, State Liaison Officer, RI C. Gordon, State Agreements Officer, RI K. Smith, Regional Attorney, RI D. Holocly, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Office J. Lanning, DRP, RI P. Jefferson, DRMA, RI Distribution:

Public Document Room (PDR)

Local Public Document Room (LPDR)

Steven Miltenberger, PSE&G State of New Jersey RA Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Projects Branch No. 1, Secretary, RI -

Region I Receptionist RI~Rf

[, (;; +. r E enzinger 1!1tl94 OFFICIAL RECORD COPY