SECY-18-0093, SRM-SECY-18-0093: Recommended Change to Verification of the Design Reliability Assurance Program

From kanterella
Revision as of 19:34, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
SRM-SECY-18-0093: Recommended Change to Verification of the Design Reliability Assurance Program
ML19219A944
Person / Time
Issue date: 08/07/2019
From: Annette Vietti-Cook
NRC/SECY
To:
References
SECY-18-0093
Download: ML19219A944 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SECRETARY MEMORANDUM TO:

FROM:

SUBJECT:

August 7, 2019 Margaret M. Doane Executive Director for Operations Annette L. Vietti-Cook, Secretary STAFF REQUIREMENTS - SECY-18-0093-RECOMMENDED CHANGE TO VERIFICATION OF THE DESIGN RELIABILITY ASSURANCE PROGRAM The Commission has approved the staff's recommendation to discontinue the use of inspections, tests, analysis, and acceptance criteria (ITAAC) to verify the effectiveness of the design reliability assurance program (D-RAP). The staff should assess whether there are additional efficiencies to be gained in the D-RAP.

cc: Chairman Svinicki Commissioner Baran Commissioner Caputo Commissioner Wright OGC CFO OCA OPA ODs, RAs, ACRS, ASLBP (via E-Mail)

PDR