Houston j }
Lighting
& Power Company Electric Tower February 14, 1979 RQ Box 1700 Houston. Texas 77001 ST-IIL-AE-324 SFN: C-0570 b!r. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 SUBJEC'I : ADDITIONAL INFOR>lATION FOR NRC INSPECTION REPORT 50-498/78-16 AND 50-499/78-16 FOR THE SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
Dear b!r. Seidle:
Your letter of January 17, 1979, requested additional information for recurrence control for the three items of noncompliance identified during IE Inspection No. 78-16 at the South Texas Project. The following actions have been implemented to preclude recurrence:
A.
Training sessions have been conducted in the use of procedures for housekeeping inspection, the development of inspection acceptance criteria for megger testing, and implementation of the h'arehouse >!aintenance Card system.
B.
Regularly scheduled surveillance of these specific activities is performed to verify adherence to procedures.
These actions have been implemented since February 9, 1979.
Very truly yours, DI E. A. Turner, Vice President Power Plant Construction 6 Technical Services EAT /cas cc: Stessrs. G.
h'. Oprea, Jr.
R. L. Ilancock (COA)
- 51. L. Borchelt (CPL)
- 11. L. Peterson (COA)
J. W. Bloo re (CPL)
R. A. Frazar J. B. Poston (CPS)
D. G. Barker R. C. h!ecke (CPS)
C. W. Vincent (BSR)
STP R5!S