Inspection Manual Change Notice 19-033,

From kanterella
Revision as of 23:50, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection Manual Change Notice 19-033
ML19282A303
Person / Time
Issue date: 10/09/2019
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML19262A004 List:
References
CN 19-033
Download: ML19282A303 (2)


Text

Issue Date: 10/09/19 1

19-033 NRC INSPECTION MANUAL DIRS Change Notice 19-033 DELETED:

TRANSMITTED:

Number Date Number Date

1.

IMC 0612 Exh 4 07/26/16 IMC 0611 Exh 4 10/09/19

2.

IMC 2600 App C 09/24/15 IMC 2600 App C 10/09/19

3.

IP 69022 12/14/15 IP 69022 10/09/19

4.

IP 87104 07/29/02 IP 87104 10/09/19

5.

IP 88104 07/03/02 IP 88104 10/09/19 TRAINING:

No special training is required for any documents issued with this Change Notice.

REMARKS:

IMC 0611 Exhibit 4, Inspection Report Cover Letter Templates, has been revised to reflect the splitting of IMC 0612 into IMC 0611 for documentation and IMC 0612 for issue screening.

IMC 2600 Appendix C, Fuel Cycle Resident Inspection Program, has been revised to provide clarification on Category 1 senior resident inspector turnovers to include a typical turnover period and Regional Administrator permission to exceed that time period. Also included is guidance for charging hours during the turnover to prevent excessive direct hours being billed due to the double-encumbered situation.

IP 69022, Inspection of Operational Readiness During Construction of Non-Power Production and Utilization Facilities, has been revised to provide additional guidance on inspecting Moly-99 licensee readiness to transition to operations.

IP 87104, Decommissioning Inspection Procedure for Materials Licensees, has been revised to clarify confirmatory survey requirements and provide consistency with IP 83890, Closeout Inspection and Survey. Changes made in Section 3, General, and Section 3.2.c., Inspections after Remediation, bullet 3.

IP 88104, Decommissioning Inspection Procedure for Fuel Cycle Facilities, has been revised to clarify confirmatory survey requirements and provide consistency with IP 83890, Closeout Inspection and Survey. Changes made in Section 3, General, and Section 3.2.c., Inspections after Remediation, bullet 3.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

Issue Date: 10/09/19 2

19-033 DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END