05000334/LER-1980-005-03, During Decontamination, Waste Water Tank SW-TK-1 Was Filled & Operator Asked to Do Valving.Failure to Observe Tech Spec Re Valving in Hot Spots Resulted in Contamination of Auxiliary Bldg
From kanterella
Revision as of 07:51, 2 January 2025 by StriderTol(talk | contribs)(StriderTol Bot change)