05000280/LER-1999-004, Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed
ML18152B378
ML18152B380
ML18152B365
ML18152B368
ML18152B366
ML16342A881
ML18152B361
ML18152B381
ML18152B385
ML18152B369
05000280/LER-1999-005, Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed
05000280/LER-1999-002, Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr
ML18152A280
ML18151A585
ML18152B649
ML18152B656
ML18152B410
ML18152B412
ML18152A370
ML18152B417
ML18152B421
ML18152B423
ML18152B422
ML18152B426
ML18152B430
ML18152B436
ML18152B437
ML18152B440
ML18152B393
ML18151A628
ML18152B396
ML18152B399
ML18152B397
ML18152B398
ML18152B400
ML18152B409
ML20210Q766
ML18152B408
ML18152B378
05000280/LER-1999-004, Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed
ML18152B380
ML18152B365
ML18152B366
ML18152B368
ML18152B385
05000280/LER-1999-005, Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed
s VInoINIA E1.ECTRIC AND Pownu CoxrAxy Ricu xoxn.Va not xr A caust March 28, 1980 Mr. Harold R. Denton, Director Serial No. 048A Office of Nuclear Reactor Regulation PSESC/CMRjr:bcm U. S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-280 License No. DPR-32 SHOW CAUSE ORDER REANALYSIS REPORT ERRATA INSERT TRANSMITTAL SURRY POWER STATION UNIT 1
Dear Mr. Denton:
The Virginia Electric and Power Company letter of January 15, 1980, Serial 048, included a report that concluded our detailed submittals on the Design Basis Earthquake for Unit 1.
The assembly and categorization of data for this submittal resulted in some minor errors which we seek to rectify.
Enclosed are instructions and replacement pages for that submittal.
The subject changes noted in the margins, ar.> minor, generally typographical in nature, and do not impact our previous letters which stated that the Design Basis Earthquake Analysis and installation of "Show Cause" modifications is complete.
We regret the inconvenience.
If you have any quest b, please contact us.
Very ruly yours, k ! ;m s I
l l
W.
. Spencer Vice President - Power Station Engineering and Construction Services Attachment cc:
Mr. Victor Stallo, Director Office of Ir pection & Enforcement Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region iI gooW3oO6