ML19320D496

From kanterella
Revision as of 03:02, 1 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Third Technical 900515-16 Meeting in Bethesda,Md to Discuss Task Action Plan A-11 Progress & Future Plans
ML19320D496
Person / Time
Issue date: 05/06/1980
From: Rachel Johnson
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19320D489 List:
References
REF-GTECI-A-11, REF-GTECI-RV, TASK-A-11, TASK-OR NUDOCS 8007210430
Download: ML19320D496 (4)


Text

_ _ _ _ _

\\

g mamecq UNITED STATES

/

'o, NUCLEAR REGULATORY COMMisslON WASHINGTON. D. C. 20555

) f, q,

MAY 6 1980 Generic Task No. A MEMORANDUM FOR: Karl Kniel, Chief Generic Issues Branch, DST

'FROM:

Richard E. Johnson, TAP A-11.'ianager, Generic Issues Branch, DST

SUBJECT:

MEETING NOTICE: REVIEW 0F A-ll PROGRESS Date/ Time:

Thursday, May 15,1980 - 11:00 a.m.

Friday, May 16,1980 - 9:00 a.m.

Location:

Room P-110 Phillips Building Bethesda, Maryland

Purpose:

Convene the third working meeting of the A-ll review team to discuss progress and establish future plans and action items.

Participants:

HRC, Review Team and visitors.

W W

A s.t Richard E. Johnson TAP A-ll Manager Generic Issues Branch Division of Safety Technology cc: See next page 8067210 q3 o

Y t

L(Meeting Notice is Seing Distributed by NRC)

AGENDA 4

THIRD TECHNICAL PLANNING SESSION OF TAP A-11:

REACTOR PRESSURE VESSEL TOUGHNESS Thursday and Friday, May 15-16, 1980 May 15, 1980

-11:00 AM Introduction G. M. Slaughter (ORNL)

Review of Pertinent Points R. E. Johnson (NRC) from May 15-16 Meeting Elastic-Plastic Analyses Applicable P. C. Paris (Wash. U.)

to Reactor Pressure Vessels J. G. Merkle (ORNL)

Clastic-Plastic Fracture Toughness F. J. Loss (NRL)

Results/ Correlations R. G. Berggren (ORNL)

Other Considerations All Participants (a). Comparison of Tearing Instability Method with other Methods (b) Data Compilation (c) Safety Margin (d) Other Planning and Assignments All Participants Summary.

R. E. Johnson G. M. Slaughter May 16, 1980.

2:00 DM

. Adjournment i

5/6/80dk-O 4

3 A-11 MEETING --REVIEW 0F PROGRESS MAY 15 - 16 1980 NAME ORGANIZATION Richard E. Johnson NRC/ DST /GIB Gerald M. Slaughter ORNL

'W. E. Cooper TES R. G. Berggren ORNL Paul C. Paris Washington University John G. Merkle ORNL M. F. Kanninen Battelle G. R. Irwin University of Maryland Jack Strosnider NRC/ DST /GIB J. R. Hawthorne NRL P. N. Randall NRC/SD F. J. Loss NRC C. Z. Serpan NRC/RSR T. U. Marston EPRI P. C. Riccardella NUTECH H. T. Corten University of Illinois E

f:

L

p DISTRIBUTION Central Files Generic Issues Branch R/F R. Mattson K. Kniel F. Schroeder D. Eisenhut V. tbonan L. Shao J. Strosnider R. E. Johnson P. Kapo R. Gamble R. Klecker W. Hazelton J. Knight.

S. Pawlicki P. Randall, SD C. Serpan, RES W. Bosnak, RES

==dWMP90R ACRS (5)

Accessions Unit Mr. R. G. Berggren, ORNL Dr. D. A. Canonico, ORNL Dr. W. E. Cooper, Teledyne Eng. Services Prof. H. T. Corten, U. of Ill.

Mr. J. R. Hawthorne, U.S. Naval Research Lab.

Prof. G. R. Irwin, U. of Maryland j

F. J. Loss, U.S. Naval Research Lab.

J. G. Merkle, ORNL Prof. P. C. Paris, Washington U.

Dr. P. C. Riccardella, NUTECH Mr. G. M. Slaughter, ORNL-Dr. Theodore U. Marston, EPRI

. Dr.' M. F. Kanninen, BCL -

Mr. John P. Gudas, DTNS R&D Center

_