ML19325C897
| ML19325C897 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/11/1989 |
| From: | Silady J COMMONWEALTH EDISON CO. |
| To: | Murely T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19325C898 | List: |
| References | |
| 0318T:1, 318T:1, GL-88-16, NUDOCS 8910180056 | |
| Download: ML19325C897 (2) | |
Text
m;; -
'E g
1
._.t.
~ }<i Q 4 :
y39 e
p ic
- ./
N Commonweehh Edison y, g ;b l,- '
gar i
_ d 72 West Adams Street Chicago, Illinois b,'
jy'
\\ ' / Address Reply to: Pc.t Offica Box 767 ---
A4 Chicago, Illinois 60690 0767 4,
jy Qi,' <
c_,
t.-
p,g
- October 11, 1989:
y
, 1
- [
Dr; Thomas E..Murley. Director?
' Office of Nuclear Reactor Regulation 4
U.SL Nuclear Regulatory Commission
-l Hashington, DC 20555 4
^
Subject:
Quad Cities Nuclear Power Station Unitel l
Cycle 11 Reload
,o JiRC Docket No. 50-254
~
Reference:
J. A.;Silady to T.E. Murley, " Quad Cities Nuclear-
.t Power Station Units 1:and 2, Proposed Amendment m
- to Remove Cycle-Specific Core Limits from the-.
- Technical Specification", dated July' 11,:1989/
.n tv s
A
=
.Dr. Murley:'
\\r 1.
g-E[] -
' Quad Cities Station Unit 1,:which has completed its tenth cycle of
~
u 3
L, operation,=is currently preparing for. Cycle-11 startup.
The purpose of this
. letter is twofold:.'(1) -to advise you of: Commonwealth, Edison's review and
- approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2).
C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming l
~
- cycle 7as required by Generic-Letter 88-16.
Note that Edison has submitted the-
- necess'ary Technical Specification changes-(See Reference) to incorporate:the
/
- COLR.. Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment prior to unit startup.
y s
- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design q
parameters, Technical Specifications and related bases such that:
{
W
' 1 )-. Core operating characteristics will be less limiting than those ll-}
previously reviewed and accepted; or
- 2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.
Of f 1 0318T:1 891018o056 891011 i
PDR ADOCK 0500o254 m
p PDC
- 5. k- -
3
[
.c.
3, i
b Dr. T.E. Nurley October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant licensing documents, the bases, and references.
Based on the review..a safety j
evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to On-Site and Off-Site Review. As in the past, the. reload licensing documents j
.were prepared using previously approved methodologies as reported in the FSAR NEDE-24011 (GESTAR), and other generically approved documents.
i
.: Edison has reviewed the cycle-specific licensing results and concluded j
that additional Technical-Specification changes are not required for Cycle 11-operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval.
Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.
.)
1
\\
'Therefore, application for an amendment to the Quad Cities Unit 1 1
operating license is not required for resumption of operation with the Cycle 11 reload core.
The estimated startup is November 20, 1989.
l L
'If-there are any further questions regarding this matter, please j
contact this office.
i Very truly yours, l
g J. A. S11ady Nuclear Licensing Administrator im Attachment.
.cc:
T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2
-