ML19325C897

From kanterella
Revision as of 17:41, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises of Util Review & Approval of Cycle 11 Reload & Forwards Core Operating Limits Rept (COLR) for Upcoming Cycle Per Generic Ltr 86-16.Tech Spec Changes to Incorporate COLR Submitted
ML19325C897
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/11/1989
From: Silady J
COMMONWEALTH EDISON CO.
To: Murely T
Office of Nuclear Reactor Regulation
Shared Package
ML19325C898 List:
References
0318T:1, 318T:1, GL-88-16, NUDOCS 8910180056
Download: ML19325C897 (2)


Text

m;; -

'E g

1

._.t.

~ }<i Q 4 :

y39 e

p ic

./

N Commonweehh Edison y, g ;b l,- '

gar i

_ d 72 West Adams Street Chicago, Illinois b,'

jy'

\\ ' / Address Reply to: Pc.t Offica Box 767 ---

A4 Chicago, Illinois 60690 0767 4,

jy Qi,' <

c_,

t.-

p,g

October 11, 1989:

y

, 1

[

Dr; Thomas E..Murley. Director?

' Office of Nuclear Reactor Regulation 4

U.SL Nuclear Regulatory Commission

-l Hashington, DC 20555 4

^

Subject:

Quad Cities Nuclear Power Station Unitel l

Cycle 11 Reload

,o JiRC Docket No. 50-254

~

Reference:

J. A.;Silady to T.E. Murley, " Quad Cities Nuclear-

.t Power Station Units 1:and 2, Proposed Amendment m

- to Remove Cycle-Specific Core Limits from the-.

- Technical Specification", dated July' 11,:1989/

.n tv s

A

=

.Dr. Murley:'

\\r 1.

g-E[] -

' Quad Cities Station Unit 1,:which has completed its tenth cycle of

~

u 3

L, operation,=is currently preparing for. Cycle-11 startup.

The purpose of this

. letter is twofold:.'(1) -to advise you of: Commonwealth, Edison's review and

- approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2).

C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming l

~

- cycle 7as required by Generic-Letter 88-16.

Note that Edison has submitted the-

- necess'ary Technical Specification changes-(See Reference) to incorporate:the

/

- COLR.. Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment prior to unit startup.

y s

- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design q

parameters, Technical Specifications and related bases such that:

{

W

' 1 )-. Core operating characteristics will be less limiting than those ll-}

previously reviewed and accepted; or

2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.

Of f 1 0318T:1 891018o056 891011 i

PDR ADOCK 0500o254 m

p PDC

5. k- -

3

[

.c.

3, i

b Dr. T.E. Nurley October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant licensing documents, the bases, and references.

Based on the review..a safety j

evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to On-Site and Off-Site Review. As in the past, the. reload licensing documents j

.were prepared using previously approved methodologies as reported in the FSAR NEDE-24011 (GESTAR), and other generically approved documents.

i

.: Edison has reviewed the cycle-specific licensing results and concluded j

that additional Technical-Specification changes are not required for Cycle 11-operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval.

Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.

.)

1

\\

'Therefore, application for an amendment to the Quad Cities Unit 1 1

operating license is not required for resumption of operation with the Cycle 11 reload core.

The estimated startup is November 20, 1989.

l L

'If-there are any further questions regarding this matter, please j

contact this office.

i Very truly yours, l

g J. A. S11ady Nuclear Licensing Administrator im Attachment.

.cc:

T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2

-