NRC-89-0224, Forwards Addl Info to 890721 Response to Generic Ltr 89-08, Confirming That long-term Erosion/Corrosion Program Implemented at Facility Meets or Exceeds NUMARC Working Group Recommendations,Per App a of NUREG-1344

From kanterella
Revision as of 08:23, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info to 890721 Response to Generic Ltr 89-08, Confirming That long-term Erosion/Corrosion Program Implemented at Facility Meets or Exceeds NUMARC Working Group Recommendations,Per App a of NUREG-1344
ML19327C104
Person / Time
Site: Fermi 
Issue date: 11/09/1989
From: Sylvia B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-0224, CON-NRC-89-224, RTR-NUREG-1344 GL-89-08, GL-89-8, NUDOCS 8911150280
Download: ML19327C104 (2)


Text

p n

s. neiph sr me

(

wn,v.c.e,n.ani r

y

.I wo uo,in o,.

u.o.n..y j

g

~(3,3) M6 4i60

,... im,,.... a t

r Novenber 9, 1989 NIC-89-0224 l-r U. S. Ibclear Regulatory Ccroission Attn Docunent Con +.rol Desk Washington, D. C.

20555

References:

1)

Fermi 2 t

NIC Docket Ib. 50-341 l

l '.

NIC Licence No. IFF-43 l.

2)

NIC Generic Letter 69-08, i

"Erocion Corrossion-Irduced Pipe Wall hinning", datei May 2, 1989 3)

Detroit Fdison letter to N10, "Iesponse to NIC Goncric letter 09-08",

NIC-09-0164, datcd July 21, 1989

-i

Subject:

Additional Inforretion on Detroit Fdicon Resronte to N!C Generic Letter 89-08 Reference 3 provided Detroit IBison's rocponte to NIC Generic letter 89-08 (Reference 2). We responce describ(d that Detroit Fdison has

[

inplemented a long term Erosion / Corrosion Prograrn that provides i

assurance that the structural integrity of all high energy (single phase and two-phase) carbon steci cystme is n.aintained.

This letter is to provide the aciditional infornation that the long tern Erosion / Corrosion Program inplerented at Fermi 2 nects or excecdc the !OmfC working group roccmendations ac described in Appendix A of i

NURIE-1344. This information was retposted by Mr. John Starg, NIC Project Manager.

If you have any questions, plecce contcet Mr. Girija Shukla at (313) i'

'586-4270.

j L

Sincerely, Y

cc:

A. B. Davis R. C. Knop W. G. Rogers g

[

J. F. Stang i

giikhh I

P w

f.

J t

USNIC 4

Novcmter 9,1909 NIC-89-0224 l

Page 2 I

I, B. WJPil SYLVIA, do hertby affinn that the fotogoing statments are based on facts and citetu:ctances which are trtie and acetirato to the best of my knowicdge ard telief, h a/2,e/-

(b B. WJP)(SYLyJfi Senior Vice President On this day of ANu (I s, 1989, before ne personally appeared B. Ralph Sylvia, being first duly sworn and says that he executo5 the forogoing an his froo tct ord decd.

ga/m ().[dt W E L totary Public ROSAlf! A ARMElfA Notoy Pube Mona gy i

% 4 kw Jort11.1993

!