PY-CEI-NRR-1085, Forwards Inservice Insp Summary Rept NP0059-0001, Results for Outage 1 (1989),First Period,First Interval, Vols I & Ii,Covering Insp Period 871118-890805
| ML19332C832 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/21/1989 |
| From: | Kaplan A CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19332C833 | List: |
| References | |
| PY-CEI-NRR-1085, NUDOCS 8911290057 | |
| Download: ML19332C832 (1) | |
Text
y 1
N?
&.a a
THE. CLEVELAND ELECTRIC ILLUMINATING COMPANY.
b P.O. BOX 97 '
B' PERRY, OHIO 44001 S
TELEPHONE (216) 25Ek3737 5
ADDRESS 10 CENTER ROAD FROM CLEVELAND: 479-1200 W
TELEX: 241690 ANSWERBACK: CEIPRYO Af Kaplan Serving The Best location in the Nation PERRY NUCLEAR POWER PLANT
' VICE PRESIDENT NUCLE Att GMOUP November 21,:1989 PY-CEI/NRR-1085 L
-j 4
L U.S. Nuclear Regulatory Commission Document Control Desk l1 Washington,,D. C.
20555 l.
Perry Nuclear Power Plant Docket No. 50-440 l
In-Service Inspection Summary Report Gentlement.
l L-The Cleveland Electric Illuminating Company (CEI), in accordance with the American ' Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel
.(B&PV)' Code,Section XI, " Inservice Inspection," 1983 Edition, Summer 1983 Addenda, Article IWA-6000, hereby submits our Inservice Inspection Summary Report for the Perry Nuclear Power Plant (PNPP) Unit I covering the first
-inspection period,beginning November 18, 1987 through our.first refueling
. outage completed August 5, 1989.
If you have any questions, please feel free to call.
t e
H 3
Ver trul ou s, i
M Al Kaplan Vice President Nuclear Group p
AK:njc Attachment ces: -T. Colburn
.P. Hiland
-, u -a
?'USNRC Region III Q
J. Harris _(State of Ohio)
W.'Zimmerman (ANI)
% \\
f l
DO s.
a
,,.