f'
, ;ii[_ _
s 0 --
, n;,-
ewy
?
y"; ' lL7 '
- p' " Alabana Powe' Company.
r
' 40 inverness Cent:r Parkw:yl
~,, py Post Office Box 1295.
r Birmingham, Alabama 35201.
~ Telephone 205 868-$581 -
W. G. Nel ston, Ill -
(
- Senior Vu,e President,
1; Nuclear Operations -
gghg g,
the southem electic system.
1 November 14, 1989 Docket No.' 50- 348
- !'t l
J{ ;
- U. S. ' Nuclear Regulatory Commission 4;
'ATIN: Document Control Desk:
i
! Washington, D.'C.
20555
.]
Joseph M. Farley Nuclear Plant
- F1 Unit 1' Monthly operating Data Report
~j
-i j
Attached:is the October 1989 Monthly Operating Report for Joseph M. Farley l
Nuclear Plant Ocdt 1,. required by Section 6.9.1.10 of the Technical Specifications.
If'you have any ques'. ions, please advise.-
j Respectfully submitted,
]
l G.
airston, III
'j g
i JGS:sme/1.6 j
-Attachment
.cc: Mr. S. D. Ebneter j
Mr. E. A. Reeves-Mr. G. F.' Maxwell-
-i l
- l I
/
\\\\
s91129o163 e91031
/
PDR ADDCK 05000348 te FgdU)
^
g ;gg.;; -
- 3 7 m*
c u"%
j.y l
2 "i '
.I j t
.i
- :t1 JOSEPH.M.~ FARLEY NUCLEAR PIANT 4 <
- UNIT 1 '
NARRATIVE St1 NARY-OF OPERATIONS-October,.1989 i.
i The Cycle 9.- 10 refueling outage continued through the month'of October..
.a
. t U
The' following major safety-related maintenance was perfonned in the month'.
of October:
1.
ne. reactor was de-fueled and' visual inspections'of the reactor'
. vessel were completed. Visual inspections of the fuel revealed'no c,
defects. W e fuel, including 61 fresh assemblies, was placed.back into:the reactor' vessel.
3n
- 2. -Eddy. current examinations were performed on tubes in all'three steam generators.. As a result of. this inspection program, six tubes were:
plugged:' one in the:1A steam generator and five in the 1C steam generator. -In addition, the eddy current indications for 18 tubes -
'l
-were not quantifiable and these tubes were plugged as a precautionary
- measure." These'18 tubes included three tubes in the 1A steam
. generator, two tubes in the 1B steam generator, and'13 tubes in the f
I
.1C steam generator.
- 3.-. The. program for refurbishing the safety-related motor-operated valves-continued.
<x 4; All incore thimble tubes were inspected. As a result of this-t inspection, three tubes were capped and four were retracted.
,+
6.
The turbine driven auxiliary feedwater ptanp was overhauled.
,l q
f 6.
A scored shaft, caused by a bearing failure, was replaced on the 1A motor generator set.
q A
7 :An everhaul inspection was performed on the.1B steam generator feedwater pump. Erosion in the gland area was repaired.
8.
The 1A reactor coolant pump rotor was refurbished.
g 9.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
i..
f i:
I E
I i
V-
^
!4
-.., Q t
OPERATING DMR REPCRf
,=
DOCKET No. 50-348 DME 11/8/89 OCMPLETED BY D. N. Morey
'IELEPH3E (205)899-5156 OPERATDG S'IR'IUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 2. Reporting Period:
October, 1989
- 1) Cumulative data since
- 3. Licensed Thermal Power (Mt):
2,652 12-1-77, date of
- 4. Nameplate Rating (Gross W e):
860
.comrercial operation
- 5. Design Electrical Rating-(Net MWe): 829 i
~6. Maximum Dependable Capacity (Gross MWe):
866.1
~~
- 7. Maximum Dependable Capacity (Net Me):
823.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 3: rough 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
~3
- 10. Reasons For Restrictions, If Any:
N/A
'1his Month Yr-to-Date Cumulative 11'.. Hours In Reporting Period 745 7,296 104,472,
- 12. Number Of Hours Reactor Was Critical 0.0 6,359.2 79,004.2-a 13.-Reactor. Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 0.0 6,358.9 77,548.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 16,746,598 198,329,820
- 17. Gross Electrical Energy Generated (MWH) 88 5,437,534 63,843,882
,156,164 60,233,574
- 18. Net Electrical Energy Generated (MWH)
-5082 5
- 19. Unit Service Factor 0.0 87.2 74.2
- 20. Unit Availability Factor 0.0 87.2 74.2 21.. Unit Capacity Factor-(Using MDC Net)
-0.8 85.8 71.4
-22. Unit Capacity Factor (Using DER Net)
-0.8 85.2 69.5
- 23. Unit Forced Outage Rate 0.0 0.0 8.2
- 24. Shutdowns Scheduled Over Next 6 Months (Typc, Date, and Duration of Each):
Turbine generator overspeed trip test, 11/10/89, approximately eight hours
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: November 9, 1989
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECIRICITY 08/20/77 08/18/77 COMERCIAL OPERATICH 12/01/77 12/01/77 Form 2/34
, 8);lY 4;;,
mi
- q. i.1i I
DOCKET NO.-
50-348
/
UNIT-1 o
~.
MTE NOVEMBER 1,1989.
COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 M3ml OC'IDBER c DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (FMe-Net)
(M4e-Net) i 1
0 17 0
i 2
0 18 0
3 0
19 0
i
'4 0
20 0
- S 0-21 0
6-0 22 0
7-0 23 0
t 8-0 24 0
.9 0
25
-O r
10 0-26 0
11 0
27 0
7:
12 0
28 0
1 5
,13 0
29 0
14 0
30 0
15 0
31 0
16 0
L INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in l.
the reporting month. Compute to the nearest whole megawatt.
l Form 13/21
~
_3 ;j-
"u.
- 14 1.
i y
UNIT SHUTDOWNS AND POWER REDUCTIONS '-
DOCRET NO. 340
. UNIT NAME
.J. M.~FARLET - UNIT 1 !M DATE NOVEMBER I',
1999~
't'-
- COMPLETED BY D. N.'MORET' REPORT MONTH OCTOBER TELEPRONE (2051899-5156 l
l l
l l METHOD OF l LICEMSEE l l
l.
CAUSE E. CORRECTIVE
~
l; l
l l
l DURATION l l SHUTTING l EVE!FF l SYSTEM l. COMPONENT l
ACTION TO' l'
lNO.
l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT 4 l CODE
'l CODE l
PREVENT RECURRENCE' l
l 1
1 I
I I
-l l
i I
li l001 l 891001 l
S l 745.0 l-C' l.
1 l - N/A l N/A' l
N/A
] The Cycle'9-10 refueling outage continued.
l l
l l
l l
l l
l l-j from 9-22-89.
l 1
1 I
I I
I I
I i
1.
1-1 I
I I
I I
.I I
I i
1.
1 I
I I
I I
I i
i I
I I
I I
I I
I I
I I
i 1
1 I
I I
I I
I I
I I
1-1 I
I I
I i
i I
I i
'l-1 I
I I
I I
I I
I i
1 1
I I
I I
I I
i i
1
'l:
I I
I I
i i
i i
1
-l I
I I
I I
I I
I
.I
'l i
l-1 I
I I
I I
I I
I I
ll I
I I
I I
I I
I I
I I
I I
I I
I l
i I
I i
'l i
i i
I i
i l
i i
l' I
I I
I I
l l
I I
I i
-l.
1 I
I I
I I
I I
I I
I I
I I
I I
i i
l i
I
'l l
I I
i I
i I
.I I
I I
I I
I I
i i
i I
I i
i F: Forced kssson:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manut.1 Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.~
Event Report (LER) File (NUREG-D-Regulatory Restriction
'4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error (5xplain)
(9/77)
H-Other (Explain)
M Rxnt M
. _. -~
_