05000338/LER-1980-067-03, /03L-0:on 800724,periodic test,1-PT-57.7, Mitigation Sys Leak Check,Not Performed within 92-day Surveillance Interval.Caused by Failure to Notify Operations Dept of Test in Effect as of 791217.Tested 800722
From kanterella
Revision as of 16:41, 25 December 2024 by StriderTol(talk | contribs)(StriderTol Bot change)