p* M%e,'(
UNITED STATES
<-[],w Ij NUCLEAR REGULATORY COMMISSION
- 4
'c REGION IV o,
, [e,g 611 RYAN PLAZA DRIVE, SUITE 1000
~
ARLINGTON TEXAS 76012 2 7 AUG 1980 g
d Docket No. 99900519/80-02 Bechtel Power Corporation Gaithersburg Power Division Atta:
Mr. J. M. Komes Vice President and Division Manager 15740 Shady Grove Road Gaithersburg, Maryland 20706 Gentlemen:
This refers to the QA program inspection conducted by Mr.
R. H. Brickley of this office on July 21-24, 1980, af your facility at Gaithersburg, Maryland, and to the discussions of our findings with Mr. J. M. Amaral and members of your staff at the conclusion of the inspection.
Areas examined during the QA program inspection and our findings are discussed in the enclosed. report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA program failed to meet certain NRC requirements.
The specific findings and references to the pertinent requirements are identified in che enclosures to :: Sis letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be takent to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will j
be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information fro.a public disclosure.
Any such application must include a full statement of 8010270573
s Bechtel Power Corporation 2
the reasons on the basis of which it is claimed that the information is proprie-tary and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, l
\\
Uldis Potapovs, Chief Vendor Inspection Branch
Enclosures:
1.
Notice of Deviation 2.
Inspection Report No. 99900519/80-02 l
I O
%