05000324/LER-1980-080-03, /03L-0:on 801019,during Testing,Reactor Instrument Penetration Isolation valves,X76-B,failed to Reopen.Caused by Bakelite Nipple Breaking Off Actuation Switch.Switch Module Replaced & Valve Successfully Cycled

From kanterella
Revision as of 17:22, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Redirect page
Jump to navigation Jump to search