PNO-III-80-224, on 801205,I&E Authorized Resumption of Limited Electrical & Mechanical/Piping Work for Subcontractors,Cherne Contracting Corp & Commonwealth Lord J.V.,Based on Favorable Insp Findings

From kanterella
Revision as of 16:42, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-III-80-224:on 801205,I&E Authorized Resumption of Limited Electrical & Mechanical/Piping Work for Subcontractors,Cherne Contracting Corp & Commonwealth Lord J.V.,Based on Favorable Insp Findings
ML19341C435
Person / Time
Site: Marble Hill
Issue date: 12/05/1980
From: Fiorelli G, Schweibinz E, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-224, NUDOCS 8103030445
Download: ML19341C435 (1)


vwTmmrswmgnrrPTtcNrTBt(

l Date: 12/05/80 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURENCE--PNO-III-80 224 This oreliminary notification constitutes EARLY notice of events of w S_k'3, safety or public interest sicnificance.

Tne infomation obesented/fsMs initially received witnout verification or evaluation and is basita,11y a V.

tha-is known by iE staf f as of tnis date.

,, (,

~h. h []if FACILITY:

Publi-c Service of Indiana U

Marble Hill Units 1 and 2 Q

DOCKET NOS:

50-546; 50-547 9 '"

%,&P'!

p

/

SUBJECT:

RESUMPTION OF LIMITED ELECT"ICAL AND MECHANICAL / PIPING WORK N

PUBLIC SERVICE OF INDIANA (L I) SUBCONTRACTORS Public Sersice of Indiana was notified today, December 5,1980, that the Director of the Of fice of Inspection and Enforcement had authorized resumption of limited electrical and mechanical / piping work for PSI mechanical subcontractor Cherne Contracting Corporation (CCC) and electrical subcontractor Commonweal:h-Lord J.V.

This authorization was based on f avorable NRC inspection findings which confirmed chat appropriate corrective actions had been taken by the licensee and its subcontractors.

This PN is for information only and no further action by IE is planned.

Region III does not plan a press release, however, it is expected that the licensee will issue one. _ Considerable local media interest is expected.

The State of Indiana vill be notified.

This information is current as of 1:15 p.m. (CST) on December 5, 1980.

Contact:

E. Schweibins, FTS C. Williams, FTS G. Fiorelli, FTS 384-2579

/

384-2581 384-2695 Distribution:

Transmitted H St. /,30 Chairman Ahearne Commissioner Hendrie S. J. Chilk, SECY Commissioner Gilinsky Cer=issioner Bradford C. C. Kamerer CA ACRS (For Distribution)

Transmitted:

'MN88/.)

Y. Bldg. /*

b E:XOOS_ /. 3 hlE:HQ Dist. )

W. J. Dircks, E00 H. R. Denton, NRR C. Michelson, AE00 R. H. Vollmer, NRR Landow (6 min /page)

J. J. Fouchard, PA R. J. Mattson, NRR J. J. Cummings, OIA I

N. M. Haller, MPA D. F. Ross, NRR G. L'. Kerr, OSp D. Eisenhut, NRR MAIL H. K. Shapar, ELD S. H. Hanauer

.R. Minogue, SD IE: XCOS

)/illste Bldg. /. D Document Mgt. Br. (For POR/LPD J. G. Davis, NMSS Regional Offices T. F

. ley, RES S. Ebbin. Executive Dire::or f-g h

/j Nuclear Safety Overs;p Cc ritte-

/

PRELIMINARY NOTIFICATICN f.[33

g[

0 e

~3~- idl

)E -~-

n

/.# 7 8103030'/%

W

-