ML19341C527

From kanterella
Revision as of 16:40, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rept of Reactor Standby Condition for Nasa,Plum Brook Mockup Reactor,1980
ML19341C527
Person / Time
Site: Plum Brook File:National Aeronautics and Space Administration icon.png
Issue date: 02/17/1981
From:
NATIONAL AERONAUTICS & SPACE ADMINISTRATION
To:
Shared Package
ML19341C525 List:
References
NUDOCS 8103030694
Download: ML19341C527 (2)


Text

.-. -

_ = - _

4 REPOEC OF REACIOR_STME)BY CODITICN FOR ME

/

NASA, PIUM B300K NOCKUP QR_

Ibporting Period: January 1, 1980 - M r 31, 1980 KZRIAL REPORT

.o License Ib. R-93 Docket No. 50-185 February 17, 1981 NASA-Iewis Besearch Center Plum Brook Station l

Sandusky, Ohio 4

9 8108080699

a REPORT OF @R STANDBY CIT.RITICti FOR 'IIIE, f

NASA PLUM BBOOK !OCh [ M R Ibporting Period: January 1, 1980 - December 31, 1980 he following mport has been prepared pursuant to Section 10.l(2) of Attaciment A, Change No. 7, Amendment 2 to License No. R-93.

Wis report covers the 1980 calendar year period of the possess, but not operate, license, i

1.

Condition of Systems and Conponents:

The conditicn of all systens and cocponents vital to the maintenance of a safe standby conditicn had been carefully reviewed. This includes a review of the records generated during the reporting period for all systems and conponents specifically noted in the Technical Specifications. Inspections and 'lbsts to assum integrity of the Ibactor Building and the Mockup Reactor

(?CR) Facility were perfonmd as specified in the Technical Specifications.

The Ibactor Building, tiockup Ibactor Facility, and each system and conponent were found to be in the condition specified in the Technical Specifications and/or Standlyy Procedures.

2.

Changes in Procedurus:

mere were no significant changes in procedures relating to the MJR Facility during the reporting period.

3.

Changs to the Facility:

2ere wre no changes to the MJR Facility during the reporting period.

1 e

i e

- -.