PNO-III-80-107, in ,Detroit Tv Station Wxyz Provided List of 31 Allegations Re Const,Piping, Nonconformance Repts & Welding Documentation.Party Making Allegations Will Be Contacted.Addl Investigation Conducted

From kanterella
Revision as of 18:16, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-III-80-107:in ,Detroit Tv Station Wxyz Provided List of 31 Allegations Re Const,Piping, Nonconformance Repts & Welding Documentation.Party Making Allegations Will Be Contacted.Addl Investigation Conducted
ML19351D548
Person / Time
Site: Fermi 
Issue date: 06/02/1980
From: Danielson D, Fiorelli G, Phillip G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-107, NUDOCS 8010100383
Download: ML19351D548 (1)


.

Date: Jun2 2, 1980 PRELIMINARY NOTIFICATION OF EVENT i UNUSUAL OCCURENCE--PNO-III-80-toy

(.

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public intere!,t significance.

The information presented is as initially received without verification or evaluation and is basically all tnat is known by IE staff as of this date.

Facility: Detroit Edison Company Fermi 2, Monroe, Michigan Docket No. 50-341 Subj ect:

ALLEGATIONS RECEIVED FROM NEWS MEDIA (*JXYZ, CHANNEL 7$ DETROIT)

By letter dated.May 27, 1980, TV station WXYZ provided a list of thirty-one allegations concerning construction at Fermi 2.

With the letter was a letter written by a former Wismer & Becker (site contractor) employee, and a trans-cript of interview of the individual. Also included were copies of several audits performed by the site constructor, Daniels International.

The majority of the allegations deal with instrument piping, dispositions of nonconformance reports, and welding documentation.

It appears that some of these allegations are related to allegations reported in PNO-III-80-32 and PNO-III-80-54, which have been the subject of an RIII investigation. The alleger will be contacted and additional investigatica conducted as necessary.

The State of Michigan will be notified.

(

This Preliminary Notification is issued because of the anticipate /. TV coverage.

Contact:

G. Phillip, RIII, 384-2675 D. Danielson, RIII, 384-2695 G. Fiorelli, RIII, 384-2603 Distribution:

Transmitted H St./o*,b b Chairman Ahearne Comissione. Hendrie S. J. Chilk, SECY Commissioner Gilinsky Comissioner Bradford C. C. Kamerer, CA Commissioner Kennedy.

ACRS (For Distribution)

Transmitted:

MNBB /l*/I' P. Bldg. /d ?8 V IE:XOOS /0:3'O dE:HQ Dist.)

i W. J. Dircks, EDO H. R. Denton, NRR C. Michelson, AEOD R. H. Vollmer, NRR Landow (6 min /page)

J. J. Fouchard, PA R. J. Mattson, NRR J. J. Cummings, 0IA N. M. Haller, MPA D. F. Ross, NRR R. G. Ryan, OSP D. Eisenhut, NRR MAIL H. K. Shapar, ELD

5. H. Hanauer R. Minogue, SD

/

IE:X005 Willste Bldg.I8'33 Document Mgt. Br. (For PDR/LPD I

J. G. Davis, NMSS Regional Offices R. J. Budnitz, RES L

/

Rf //:/ F PRELIMINARY NOTIFICATION g //t3/

p$ /.

I00 E

t

-. - -, - _