ML20002B378
| ML20002B378 | |
| Person / Time | |
|---|---|
| Issue date: | 11/21/1980 |
| From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| REF-10CFR9.7 M801110, NUDOCS 8012110473 | |
| Download: ML20002B378 (1) | |
Text
- "' '%o, Ifl RESPONSE REFER T0: M80ll10 UNITED STATES S
- v. g }I j NUCLEAR REGULATORY COMMISSION
)
E W ASHIN GT ON, D.C. 20555 3'
.. E o,
s
/
flovember 21, 1980 OFFICE OF THE SECRETARY MEMORANDUM FOR:
William J. Dircks, Exec Di,n for Operations SamuelJ.Chilk,Secretk h
~
FROM:
I v
. cf. c r
SUBJECT:
STAFF REQUIREMENTS - BRgE NG ON INCLUSI0ft'0F STEAM ;.
GENERATOR TRANSIENTS AS A USI, 2:00 P.tEf!tiONDAY, NOVEMBER 10,1980, C0!PISSIONERS' CONFERENCE ROOM, u.i D. C. OFFICE (OPEft TO PUBLIC ATTENDANUS)
=
a M
5 m
o
=
The Commission
- was briefed by Staff on the status of the inclusion of steam generator transients as an unresolved safety issue.
NRR and AEOD agreed that steam generator and reactor overfill transients should be treated as part of the proposed new unresolved safety issue on safety implications of control systems, with priority being. given to the B&W plants.
The issue of whether the steamline break with small LOCA (Para. 2.E.2. Action Plar.) should be designated as a separate unresolved safety issue or whether the issue should be considered as part of the proposed new unresolved safety issues on Training and Oualifications of Operating Personnel or Operating Procedures, was not resolved.
By this memorandum ED0 is requested to resolve the differing views of NRR and AE00.
(These issues are contained in SECY-80-325 which is presently before the Commission.)
cc:
Chairman Ahearne Commissioner Gilinsky Commissioner Hendrie Comissioner Bradford Commisjion Staff Offices PDRV l
1 1
l
- Commissioner Gilinsky was not present.
l 8012110 yy