ML20004D162
| ML20004D162 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/19/1981 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20004D159 | List: |
| References | |
| NUDOCS 8106080498 | |
| Download: ML20004D162 (2) | |
Text
._
7590-01 O
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING -LICENSE 5 The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 68 to Facility Operating License No. DPR-32 and Amendment No. 68 to Facility Operating License No. DPR-37 issued to Virginia Electric and Power Company (the licensee), which revised Technical Specifications for operati;>n of the Surry Power Station, Unit Nos.1 and 2, respectively, (the facilities), located in Surry County, Virginia. The amendments are effective as of the date of issuance.
These amendments revise the Technical Specifications to ' delete reference to the proposed Appendix J to 10 CFR Part 50 and clarify the requirement for testing the personnel air lock.
f The ap' plication for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Comission has made appro-priate findings as required by the Act and the Comission's rulet and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since these amendments do not involve a significant hazards consideration.
810608O N
7.590-01, The Comission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.
For further details with respect to this action, see (1) the application for amendments dated September 22, 1978, as supplemented January 9 and September 24,1979,(2) Amendment Ncs. 68 and 68 to License Nos. OPR-32 and DPR-37, and (3) id Comission's related Safety Evaluation.
All of these items are av lable for public inspection at the Comission's Public Document Room,1717 H' Street, N.W., Washington, n T. and at the Swem Library, College of William and Mary, Williamsburg, Virginia 23185. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Cordssion, Washington, D.C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 19th day of May,1981.
F HE NU iCGULATORY COMMISSION Y
h
/
n Ope' rating Reactors B nch #1 Division of Licensing
'N 4